Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Kosciuszko Bridge Main Pylon Deep Foundation Solution

    By A. Daugiala, D. Coleman

    In 2014 the New York State Department of Transportation (NYSDOT) awarded a Design-Build contract to the joint venture team consisting of Skanska which is the managing partner; Kiewit Corporation and E

    Jan 1, 2016

  • DFI
    120 Years of Caisson Foundations in Chicago

    By Robert E. Schock, Eric J. Risberg

    "Less than 20,000 years ago, the last of the glaciers retreated from the Chicago region. They left behind sheets of glacial clay till underlain by dense, over-consolidated till (“hardpan”) below which

    Jan 1, 2016

  • DFI
    Bi-Directional Testing Using Super Cells for the Jiaxing-Shaoxing River Crossing Bridge

    By Diane Reid, Antonio Marinucci, Robin Mao

    Super Cells are an innovative, open-shaped bi-directional static load testing device used to promote concrete flow during placement while utilizing greater cross-sectional area of the pile to achieve

    Jan 1, 2019

  • DFI
    Evolving Micropiles: Optimizing Foundations For Seismic Retrofit

    By Rob Jameson

    Micropiles are ideally suited to seismic retrofit applications. Their high tensile and compressive capacity can sustain the large concentrated loads induced during seismic events. Micropiles can be

    Jan 1, 2008

  • DFI
    Deep Mixing Technology: Comparison between Laboratory and Field Test Result, Different Jobsite Application.

    By Alessandro Bertero, Stefano Valagussa, Filippo Maria, Wesley Schmutzler, Leoni

    "Abstract The Deep Mixing Method (DMM) represents a viable solution to improve the adverse geotechnical properties of foundation soils. Differences and the importance of performing pre-construction la

    Jan 1, 2014

  • DFI
    Simplifying the Design of Laterally Loaded Piles for Waterfront Structures

    By Amanda R. Parry, Chris R. Pray

    Predicting and modeling the soil structure interaction of laterally loaded piles with significant unbraced lengths is one of the challenges faced in designing many waterfront structures. Designers of

    Sep 8, 2021

  • DFI
    Excavation Construction for the Transbay Transit Center

    By Nick O’Riordan, Kaitlyn L. Fleming, Michael Riemer, Youssef M. A. Hashash, Stephen McLandrich, Mohamad Jammoul, Pierre Gouvin, Andrew Yeskoo

    "To accommodate urbanization, cities are developing more underground space as a means to house public transportation systems and other entities. Underground developments often require construction of

    Jan 1, 2015

  • DFI
    Structural Evaluation of Thermal Integrity Profile Results of Transmission Foundations

    By Ryan Weaver, Travis Coleman

    The drilled shafts that support transmission lines and substations have been increasingly subject to testing to assess the integrity of placed concrete. Cross-hole Sonic Logging (CSL) has been used, b

    Jan 1, 2019

  • DFI
    Laterally Loaded Caissons for Ontario College of Art & Design

    By William F. Starke

    "The Ontario College of Art & Design (OCAD) located in Toronto, Ontario, found itself in dire need of space due to increased enrollment, leading them to embark on a major expansion and redevelopment o

    Jan 1, 2004

  • DFI
    Lateral Pressure Relief by Geotextile Encased Columns (GECs) at Piled Bridge Abutments: Two Case Studies

    By Sven Schröer, Lilma Schimmel, Dimiter Alexiew

    "The Geotextile Encased Columns (GEC) deep foundation system for embankments on soft soils was introduced some 20 years ago and is now considered State-of-the-art worldwide.The GECs consist of compact

    Jan 1, 2016

  • DFI
    Execution of Pile Installation in Environmentally Challenging Sites

    By Dena Morgan, Emre Biringen

    "Abstract This paper discusses the execution of pile installation and design issues at two environmentally challenging industrial sites in North America. Environmental regulations set constraints on t

    Jan 1, 2014

  • DFI
    Stability Assessment of a Deadman Anchor Pile Close to the Bulkhead Wall

    By WenJun Dong

    This paper presents the stability assessment of the steel pipe piles that are used to support a deadman beam to anchor an adjacent bulkhead wall. Finite element analyses are performed to assess the st

    Sep 8, 2021

  • DFI
    Response of Pile and Pile Groups against Excavation Induced Ground Movement

    By K Ilamparuthi, R. K. Madhumathi

    "This paper presents the results of 1g model tests conducted on model piles both single and two pile groups embedded in sand by physically inducing lateral soil movement. From the test results it was

    Jan 1, 2015

  • DFI
    Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging Project

    By José Carlos do Amaral, Marcelo Groszownik, Jorge Beim

    "Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the

    Jan 1, 2015

  • DFI
    Soil Improvement Through Rammed Aggregate Piers To Mitigate Liquefaction Risk In Storage Tanks

    By Francisco A. Flores, José L. Aguirre, Héctor A. de la Fuente, Erika Bernal, Jorge Arroyo-Esquedla

    This paper presents the analysis, design, and construction of soil improvement for storage tanks foundation support at a site in Tabasco, Mexico. A total of 980 Rammed Aggregate Piers of 12.5 m in len

    Oct 1, 2022

  • DFI
    Cut-and-Cover Excavation Challenges

    By Sitotaw Y. Fantaye

    "The first segment of the Second Avenue Subway extension is approaching construction completion. The new extension will operate along Second Avenue from 96th Street to 63rd Street, where it will diver

    Jan 1, 2016

  • DFI
    Assessment, Remediation And Acceptance Of Drilled Shafts Through The Use Of Csl Tests

    By Bernardo J. Jiménez Vega, Edy L. T. Montalvan PhD

    The experience gained during more than 900 Crosshole Sonic Logging (CSL) tests on drilled shafts shows the importance of establishing proper project acceptance and repair protocols. Drilled shaft eval

    Oct 1, 2022

  • DFI
    Three Deep Mixing Projects: Comparison between Laboratory and Field Test Results

    By George Filz, Morales, Carlos, Bertero, Filippo Maria, Alessandro, Leoni

    "The Deep Mixing Method (DMM) represents a viable solution to improve adverse geotechnical properties of foundation soils for many practical applications. A pre-construction soil investigation campaig

    Jan 1, 2015

  • DFI
    Rion-Antirion Bridge - An Olympian Effort Overcomes Extreme Geohazards

    By Ricardo Dobry, Alain Pecker, George E. Leventis, Ralph B. Peck

    "This year’s DFI Outstanding Project Award is for the design and construction of the foundation scheme for the largest cable-stayed bridge in the world. In 1993, Gefyra, SA (a French/Greek consortium

    Jan 1, 2007

  • DFI
    The Emerging Technology Of EHDE As Applied To Deep Foundations

    By Jerold Bishop

    The application of the ?electro-hydrodynamic effect? (EHDE) to civil engineering has been made in the construction of drilled piles. Equipment for the commercial application of this process was devel

    Jan 1, 2007