    Value Engineering And Field Testing Of Pre-Cast Concrete Piles For The kcICON Project

    By Elizabeth M. Smith

    The kcICON design-build project in Kansas City, Missouri includes widening the existing roadway, improving interchanges and grade separation bridges, and replacing the Missouri River Bridge. The Miss

    Jan 1, 2009

  • DFI
    Application of Mammoth Vibro-Tamper (MVT) for the Shallow Compaction at Airport Runway Expansion Project on Florida Limestone Ground

    By Kazunori Matsushita, Frank Vespi, Emi Walder, Mitsuo Nozu

    During the runway expansion project at the Fort Lauderdale-Hollywood International Airport in Florida (FLL project), therewere complicated geotechnical issues with a number of cavities in the limeston

    Jan 1, 2018

  • DFI
    Quality Control Of Augered Cast-In-Place And Displacement Piles ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and augered displacement (AD) piles since the pile is

    Jan 1, 2002

  • DFI
    Site Solutions For The Pisa Tower Remediation - 1 - Introduction

    By Paolo Heiniger

    The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter

    Jan 1, 2000

  • DFI
    Application Study On Non-Destructive Static Test Pile

    By Han Xuanjiang

    Through whole analysis of static testing piles information of a teaching building, this paper put for ward that when the ratioes of unload rebound amount to residual deformation and to total settlemen

    Jan 1, 1991

  • DFI
    Experiences Of The Cast-In-Situ Pile Filling In Stone-Line Intercalation

    By Guan Jichang

    An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t

    Jan 1, 1991

  • DFI
    Holding Back The Watchung Mountains

    By Ryan C. Linthicum

    A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains

    Jan 1, 2003

  • DFI
    Foundations For Offshore Wind Energy Converters - A Review Of Some Current Scandinavian Development Projects

    By K. Viking

    This article deals with some of the civil engineering related problems to be encountered when offshore wind energy projects transform from prototype offshore wind energy converter farms, developed and

    Jan 1, 2013

  • DFI
    Seismic Considerations for Bridge Foundations

    By Lok M. Sharma

    "Construction of a new bridge in a seismically sensitive area requires careful assessment of earthquake impact on the serviceability of the facility. Not only is the superstructure vulnerable, the fou

    Jan 1, 2017

  • DFI
    Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile Design

    By Jesse R. Jacobson

    A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of

    Jan 1, 2011

  • DFI
    The Analysis Of Results From Routine Pile Load Tests

    By Bengt H. Fellenius

    THIS PAPER deals with the analysis of results from axial testing of vertical single piles, i.e. the most common field test per-formed. Despite the numerous tests which have been carried out and the ma

    Jan 1, 1988

  • DFI
    Influence of Presence of Overlaying Sand on Rock Socket Length of Bored Pile

    By Priyadharshini M. R., Premalatha K

    "Abstract With the development in the construction of heavily loaded structures, the necessity of pile foundations has increased. For the transfer of heavy loads, it is mandatory that the piles need t

    Jan 1, 2014

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • DFI
    CSM: An Innovative Solution For Mixed-In-Situ Retaining Walls, Cut-Off Walls And Soil Improvement

    By Fabrice Mathieu

    The Cutter Soil Mixing (CSM) provides a cost effective solution for the rapid construction of retaining and cut-off walls using new equipment developed from diaphragm wall cutter technology. CSM consi

    Jan 1, 2006

  • DFI
    Advances in Stress-Wave Nondestructive Testing Methods for Evaluation of Deep Foundations

    By Joseph T. Coe, Siavash Mahvelati, Alireza Kordjazi

    This paper introduces recent advances in stress-wave NDT systems for use in assessments of in-service foundation integrity and drilled shaft construction. The primary results of the laboratory experim

    Jan 1, 2018

  • DFI
    Treated Round Wood Piling Specifications

    By James S. Graham

    Specifications for treated round wood piling are presented for the engineers consideration. Included in the text are background information, technical committees, Chellis, quality, treatment, static a

    Jan 1, 1992

  • DFI
    Advantages of Pressed-In Sheet Piles for New Orleans’ Hurricane and Storm Damage Risk Reduction System Flood Control Project

    By Ian Vaz, Takefumi Takuma

    "The New Orleans area has been repeatedly flooded by major storms and hurricanes since its French colonial era. After severe flooding in May 1995, the U.S. Congress authorized a massive flood protecti

    Jan 1, 2017

  • DFI
    Mitigating Settlement with Pile-Supported Approach Slabs

    By Reda M. Bakeer

    "An approach slab is the roadway segment that immediately follows a bridge intended to provide a smooth transition between the two elements. Some approach slabs have developed rough rideability with t

    Jan 1, 2017

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • DFI
    Deep Foundations In Washington, DC

    By Douglas W. Christie

    Deep foundations in Washington, DC have played a role in the city?s development since the 19th century. Designers of government and commercial buildings sought deep foundations initially to minimize

    Jan 1, 2006