Piled Raft On Layered SoilsBy Luca de Sanctis
The analysis of piled raft foundations in layered soils may be performed by 3D finite elements or by approximate procedures. Among the latter, the code NAPRA (Russo, 1998) is based on the method of th
Jan 1, 2002
-
Port Mackenzie, Alaska - Deep Soil Compaction, Spin Fin- Pile Tension Test And Dock ConstructionBy Garth Howlett
In 1998 the Matanuska-Susitna Borough formed the new port district at Point MacKenzie, known as Port MacKenzie, located directly across the Knik Arm from Anchorage. In 1991 PND Engineers Inc. (PND), w
Jan 1, 2006
-
Pile Foundation - A Critical Study Of Some Design Aspects. - SynopsisBy S. L. Karunakaran
Selection of an appropriate foundation system requires great skill and ingenuity on the part of the designer. Certain guidelines for choosing between a pile and raft foundation are presented. A number
Jan 1, 1996
-
Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And MeetingBy Peter J. Nicholson
A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th
Jan 1, 1998
-
When Real Estate Values Beckon - The Means And Methods Employed In The Underpinning Of 1501 BroadwayBy Edward J. McNamara
People in the real estate industry are fond of saying that the three most important features of a piece of property are, in order, location, location, and location. This is perhaps the reason that the
Jan 1, 2000
-
5 Pile Testing - Pile TestingBy George Goble
I hope that after the long evening and all the exercise that some of you took you won't be completely exhausted to listen to a little bit about pile testing. The topic that 1 have been given is
Jan 1, 1994
-
3 Recent Developments In Pile Design - Developments In Pile DesignBy W. F. Van Impe
The design of piles and of pile groups has remarkably progressed over the past two decades. The increasing complexity of the building concept implements a more rational approach of the deep foundatio
Jan 1, 1994
-
Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall ConstructionBy Robert Bachus, Jamey B. Rosen
"Abstract Large scale In Situ Barrier Wall Construction projects, specifically those related to earth dams, dikes, and levees, frequently require stringent quality control measures to ensure the succe
Jan 1, 2014
-
Session III - Foundation Techniques In The Urban Environment - Structural Movement And Ground Settlement Control For A Deep Excavation Within An Historic Building - SynopsisBy Martin J. Kenwright
Within the famous Harrods department store, a new lift shaft has been constructed, servicing a depth of 22m below ground level as well as the existing 6 storeys of the store. The shaft will connect wi
Jan 1, 2000
-
Experimental Study Of Axial Bearing Capacity Of Half-Closed End Steel Pipe Piles ? SynopsisBy Y. G. Qin
In this article an experimental study of axial bearing capacity of half-closed steel pipe pile installed at BKSH dock is presented. In comparison with open and closed end piles, half-closed end pile i
Jan 1, 2010
-
Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? IntroductionBy Brian R. Zuckerman
The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State
Jan 1, 2002
-
Industry Practice Standards And DFI Practice Guidelines For Structural Slurry Walls - First Edition - Title ? Table Of Contents - Part I Industry Practice Standards - 1. Classification Of Slurry Wall PanelsThere are many ways to classify structural slurry wall elements, but the DFI committee chooses to limit these descriptions to three functional requirements, namely: design function, plan configuration
Jan 1, 2005
-
Pile Design, Testing, And Installation For A Gated Dam ? SynopsisBy B. H. Moore
The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori
Jan 1, 2010
-
Session II - Industry Trends And Up And Coming Innovations - Reflections On Our Industry - Foundation Vs GeotechnicalBy Arturo Ressi di Cervia
From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in
Jan 1, 2000
-
Driving And Testing Of 75 M Long H-Piles In Shanghai - 1 . SynopsisBy Lucien Weber
In the Shanghai area, the soil conditions are such that bearing piles have become an essential foundation part of the new highrise buildings. In order to reduce the settlements under the high working
Jan 1, 1987
-
Behavior Of Excavation With Sheet Piling In Soft Clay ? SynopsisBy G. X. Zeng
A calculation programme of finite element method has been developed in order to study the behavior of excavation with sheet piling in soft clay. Based on a series of isotropically consolidated-undrain
Jan 1, 2010
-
Deep Foundations On Deer IslandBy Michael W. Oakland
Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.
Jan 1, 1994
-
Present Developments In The Design Of Deep FoundationsBy Rolf Katzenbach
The principle questions related to the design of deep foundations especially in soft soils are the stability and the cost optimised settlement reduction to prevent possible damages and to minimise the
Jan 1, 2006
-
Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract ManagementBy Mario Aiezza
This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto
Jan 1, 2002
-
Driven Piles In Glacial Deposits Exhibiting Time Dependent CapacityBy Upendra L. Karna
The pile capacity gain with time evaluated and implemented for the construction of the Route 21 Viaduct in Newark, NJ, U.S.A is discussed in this paper. The project consisted of the replacement of mor
Jan 1, 2006