Shoring of Long Beach Main Pump Station Utilizing Ground Improvement Methods, Long Beach, CABy Eric Lindquist, John Compagnone, Gabriel Carvajal
"Condon-Johnson & Associates, Inc. (CJA) with the assistance of design consultant, Brierley Associates, designed and installed a water tight shoring system utilizing several ground improvement techniq
Jan 1, 2017
-
Lateral Stresses On Multilevel Tieback WallsBy Liiban A. Affi
The most difficult task of designing multilevel tieback walls for deep excavation support is the determination of lateral stresses. These lateral stresses act not only on the shored height, but also
Jan 1, 2010
-
Westlink Projects – Geotechnical Challenges During The Execution PhaseBy Robert Thurner, Albin Norrman, Sami U. Raja
The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 kms of track, 6 kms of which will be in tunnels. Beside s
May 1, 2022
-
Centrifuge Modelling Of Displacement Piles and Installation EffectsBy J. Gniel, L. King, C. Gaudin, C. O’Loughlin
"This paper presents some recent advancements in centrifuge modelling, which enable the installation of displacement piles to be performed in-flight while measuring ground responses. Details and resul
Jan 1, 1900
-
Flood Protection System for Infrastructures: Methodology and Instrumentation TestingBy Gisele R. Passalacqua, Taylor Malangone, Subhash Mahali
New York City is a busy metropolis with 8 million people. New York has the largest public transportation system with 6 million riders a day throughout the subway system. Keeping this infrastructure in
Sep 8, 2021
-
A Seepage Control Cutoff in an Extreme Saline EnvironmentBy Kevin Green, Iván Contreras, Aaron Grosser, Jon Ausdemore, Rachel Leier, Amr Ragy
"Construction of a new tailings dam was required to increase tailings storage capacity at a trona mine near Green River, Wyoming. The new dam was founded on overburden soils underlain by both fracture
Jan 1, 2016
-
Fundamentals FirstBy Jeffrey C. Schuh, Logan Bloemer, Daniel P. Dietzler
Over the past 30 years, the authors have encountered numerous projects where recognizing the geology, soil properties and groundwater conditions, and considering alternative construction techniques ha
Jan 1, 2019
-
Deep Foundation Advancements in FargoBy Ezra Ballinger, Matthew R. Glisson
Located in downtown Fargo, North Dakota, the Block 9 Redevelopment project site contains highly- compressible soils in the upper 100 feet with groundwater about 10 to 15 feet below the existing ground
Jan 1, 2019
-
Realistic Estimation Of Water Table Depth For Design Optimization Of Bored Tunnel And Cut & Cover Tunnel Structures For Underground MetroBy Chiranjib Sarkar, Sibapriya Mukherjee, N Kumar Pichumani
With the rapid expansion of urban transportation systems, tunnels and cut & cover structures are considered as the only solution in improving the urban space congestion problem in mass rapid transit s
Nov 1, 2022
-
“Trevi-Calatore”: Innovation in Cut and Cover and Tunneling for the Installation of Plunge Columns Aimed to Excavate Underground Structures through the Top-Down MethodBy Alessandro Bertero, Manuel Toniolo, Vincenzo Tirozzi
"The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the ""Top Down"" Technique (Stations, Car Parks,
Jan 1, 2016
-
Field Measurements Of In-Situ Equipment Track Pressure And Working Platform Deformation Using Earth Pressure Cells And Fiber OpticsBy Peter Faust, Peter Hubbard, Kenichi Soga
The European Federation of Foundation Contractors (EFFC) and The Deep Foundations Institute (DFI) have set up a task group to compile a Guide for Working Platforms. The first edition of this Guide has
May 1, 2022
-
Vibro Stone Columns With Preloading – An Effective Foundation Solution For Large Storage StructuresBy Ramanathan C, Prasad P. V. S. R
The most critical challenge for any large size storage structures to be constructed on soft compressible soils is bearing capacity and consolidation settlements. Consolidation is the time dependent ph
Sep 1, 2022
-
Cutter Soil Mixing Solutions at the Leixões Cruise TerminalBy Xavier Pita, Alexandre Pinto, António Cristovão, Rui Tomásio
"The cutter soil mixing technology was been applied in Portugal since the last seven years. The aim of this paper is to present the main design and execution criteria, related with both the cofferdam
Jan 1, 2015
-
Assessment of Existing Bulkhead Walls for Dredging ImpactsBy Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Tresfjord Bridge -Pile WorksBy Andreas Andenæs, Arne Schram Simonsen
"AbstractThe Tresfjord bridge is with its variety in foundation concepts and difficult soil conditions one of the most geotechnically challenging projects in Norway at the time. The project comprises
Jan 1, 2014
-
A Novel Method For Assessing The Reuse Of Under Reamed Piles As Part Of The Southbank Place ProjectBy Stuart Hardy, Xiangbo Qiu
The South Bank Place project comprised the redevelopment of the iconic Shell Corporation headquarters in Waterloo, located on the Southbank of the River Thames in central London. The site was original
May 1, 2022
-
Remedial Method for Collapse Soil Foundation of Mosul DamBy Arash Khosravifar, Ali N. Ibrahim
"Large areas of Iraq are covered with collapsible soils namely gypsiferous soil which is often used as the foundation soil for structures. In particular, the Mosul Dam foundation is comprised of high
Jan 1, 2017
-
D?Appolonia - Recommended Specifications For The Design Of Foundations, Retaining Walls And Substructures - Final Report Prepared For National Cooperative Highway Research Program Transportation Research Board National Research Council - 4.5 Drvn Pls4.5.1 General The provisions of the article shall apply to the design of axially and laterally loaded driven piles in soil or extending through soil to rock. 4.5.1.1 APPLICATION (Revised Article
Jan 1, 1989
-
Installation Of Three Up To 120M Deep Diaphragm Wall Shafts, With Diameters Between 8M And 35M At Woodsmith Mine In North Yorkshire (England)By Gustav Jahner, Michael Baltrusch, Norbert Hoffmann
Near the port city of Whitby in the north-east of England, Anglo American (AA) is setting up the deepest mine in the UK, which will have a depth of 1,500m. The purpose of the project is to extract and
Sep 1, 2022
-
Case History: Drilled Shaft Foundation System in Cemented Soils, Las Vegas, NevadaBy Rouzbeh Afsharhasani, Moses Karakouzian, Brandon Kluzniak
"The Vegas High Roller is the centerpiece of a new development parcel adjacent to the Las Vegas Strip. At a height of 550 feet, the High Roller is currently the tallest observation wheel in the world.
Jan 1, 2017