Two-Stage Crushing For Concentrating Minor Rare Metals from E-ScrapBy Kosuke Hosoda, Shuji Owada, Hiroyuki Tokuichi, Hirobumi Ohta, Chiharu Tokoro, Moto-o Sato, Katsushi Okumura, Hiroto Ogawa, Hideaki Umezawa
The Japanese government enforced the "Small Domestic Appliances (SDAs) Recycling Law" in 2013. The law targets metals such as Ta, Nd, Dy, Co, and W to be recycled. Considerable amounts of these minor
Jan 1, 2014
-
The Pierina Project: From Acquisition to ProductionBy Barrick Pierina, John Frostiak, Igor Gonzales, Kenneth G. Thomas, Ken Manning
"1.0 SummaryThe Pierina deposit was acquired in August 1996 when Barrick Gold Corporation purchased Arequipa Resources, a junior mining company with extensive land positions in Peru. At the time of ac
Jan 1, 2000
-
Froth Based Indicators as a Tool for Flotation DiagnosisBy Patrick Pelletier Jr., Pierre-Alexandre Bossé, Gianni Bartolacci, Ian Orford, Steve Parent
"Over the last decades, many authors have shown the importance of froth in the flotation process. Mineral recovery is related to froth recovery and flotation. Selectivity is affected by froth characte
Jan 1, 2006
-
An undergraduate pilot plant experienceBy L. J. Heaslip, J. M. Toguri, T. R. Meadowcroft, R. L. Addinall
"""Pilot Plant Operations"" is a final-year core course given to the Metallurgy and Materials Science students at the University of Toronto. This course involves a laboratory study of an industrial pr
Jan 1, 1980
-
Flammability of Ammonia Leach Solution Vapours Under an Atmosphere of Enriched OxygenBy J. Budac, R. Kofluk, D. Belton, M. Sjogren
A series of tests were performed to determine the flammability limits of mixtures of oxygen, ammonia, steam and nitrogen, over a solution, in a sealed autoclave. The partial pressures of ammonia and o
Jan 1, 2004
-
Drilling and blasting research at the Noranda Technology CentreBy L. van Hijfte, A. Piché
"Drilling and blasting are fundamental operations in the mining cycle and constitute an important component of the mining costs. Problems associated with improper drilling and blasting practices can c
Jan 1, 2000
-
A fresh approach to mine organization and incentive planning based on experience at Campbell Chibougamau Mines Ltd. (now Campbell Resources Inc.)By J. G. Strasser
"There has been considerable output over the last three decades from the social sciences concerning man and his working environment. In the mining industry at large, however, authoritarian, hierarchic
Jan 1, 1981
-
Computer Control of Flotation Circuits at Frood Stobie MillBy G. Styles, K. Lye, R. Tenbergen, M. Mayhew
Requirements to produce a higher bulk concentrate grade have necessitated extensive use of on-stream analyser data and computer programming to obtain the targets set for Frood Stobie Mill as required
Jan 1, 1985
-
Stochastic Mine Planning Optimization: New Concepts, Applications and Monetary Value in an ever Uncertain MarketBy Roussos Dimitrakopoulos
Conventional approaches to estimating reserves and optimizing mine planning and production forecasting result in single, often biased forecasts. This is largely due to the non-linear propagation of er
Oct 1, 2009
-
The Use of Mine Sequencing Controlled Through Numerical Modelling and Instrumentation to Destress a Highly Burst Prone Sill Pillar - DraftIn order to maintain a production rate of 6,000 tonnes per day from underground at the Williams Operating Corporation, two independent mining areas were required which created a long narrow sill pilla
Apr 1, 2005
-
Use of Till Geochemistry and Mineralogy to Outline Areas Underlain by Diamondiferous Spessartite Dikes near Wawa, OntarioBy Christopher F. Gleeson, Roger D. Thomas
"Abstract - Wawa has long been a center of mineral exploration activity and diamonds have been reported in the area since the 1930s. However, diamond exploration did not begin in the area in earnest u
Jan 1, 2000
-
Comparisons of the Geology and Proposed Underground Mining Methods of the Panda and Koala Kimberlites at the EKATI Diamond MineBy Peter A. Oshust
The EKATI Diamond Mine has successfully completed the development and commissioning of the Panda Underground Project to extract the ore below the Panda open pit. The dominant kimberlite domain of the
May 1, 2006
-
Mining Operations and Slurry Pipelines Update and FutureBy R. A. Hill, J. D. Pitts
"Long distance slurry pipeline systems have been successfully trans-porting steam coal, iron concentrates, copper concentrates and limestone for an aggregate of nearly 60 years and nearly three billio
Jan 1, 1978
-
Unlocking Value through Flotation Equipment MaintenanceBy P. Tolvanen, A. Jalili
"When hard times strike in the mining cycle, sites tighten their belts and focus on lowering their unit costs. Lower unit costs can be achieved by reducing expenditure, increasing production, or by a
Jan 1, 2015
-
Heap Leaching in Ontario - An ExampleBy W. J. Witte, M. K. Witte
"The purpose of this report is to present a generalized preliminary design and cost estimates for a typical heap leach operation such as might be undertaken in Northern Ontario. This report should be
Jan 1, 1985
-
Value Based Grinding Circuit ControlBy M. H. Moys, J. A. Finch, A. R. Laplante
"A detailed review of ball milling circuit control practices in industry has been carried out. Based on fundamental process performance objectives, a standard system for base-level control of most bal
Jan 1, 1988
-
Long-Range Terrestrial Digital Photogrammetry for Discontinuity Characterization at Palabora Open-Pit MineBy M. Sturzenegger
This paper documents a field survey using long-range terrestrial digital photogrammetry at the Palabora open-pit mine, South Africa, for multi-scale characterization of rock mass discontinuities. Ster
May 1, 2009
-
Operation of a High-Density Tailings ThickenerBy Ernie Doell, Trung Nguyen
"In early 1995 Cluff Mining commissioned a newly constructed high density tailings thickener at its Cluff Lake uranium mill. The 85 ft diameter high density thickener is one of the first of its kind i
Jan 1, 1996
-
Two-Mass Vibrating Screens for High Tonnage ApplicationsBy Steve Massman, Edward Wipf, Gary Beerkircher
"As mine size and tonnage continues to increase, material handling/processing equipment has also increased in size with 400 MT haul trucks, 2000 KW crushers, 12 M SAG/AG mills, 8.5 M ball mills, 3000
Jan 1, 2017
-
Design and Development of an LHD for Narrow-Reef MiningBy Patrick F. R. Murphy
The mechanization of platinum group metal (PGM) underground reef mining in South Africa has posed a challenge to mining engineers for several decades. This is primarily due to the shallow dip angles a
May 1, 2003