Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Best Practice Database for Energy Management Initiatives in the Mining Industry

    By M. Y. Levesque

    The Australian Government?s Energy Efficiency Opportunities (EEO) program launched in 2006 obliges companies that use more than 0.5 PJ (petajoule) or roughly 139 GWh (gigawatt hour) per year to conduc

    Aug 1, 2013

  • CIM
    Mill Modernization Program at Noranda Minerals Inc. Geco Division

    By L. S. Urbanoski

    This presentation describes a major modernization project at the Geco concentrator. The objectives of the program were to replace obsolete flotation equipment and upgrade process controls.Noranda Mine

    Jan 1, 1987

  • CIM
    Precipitation of Iron Oxides From Iron(II)/(III) Chloride Media at Ambient Temperatures Using Caustic, Lime or Magnesia

    By D. M. Muir

    Many plants produce iron(II)/(III) waste liquors which must be treated by neutralisation and precipitation to remove the iron. Iron can be precipitated as crystalline goethite or jarosite by controlle

    Jan 1, 2006

  • CIM
    Investigation on Efficiency and Wear with the LCM Centrifugal Mill

    By Peter Mitschke, Friedrich Rosenstock, Heinrich Meiler

    "The development of the Centrifugal Mill jointly by Chamber of Mines (Johannesburg) and LURGI GMBH (Frankfurt) had been described by L. Kitschen e.al. during the 14th IMPC at Toronto in October 1982.

    Jan 1, 1985

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike

    By M. Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike (TECHNICAL PAPER)

    By R. Mckinstry, M. Rantapaa, T. Bolles

    "Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Cleaning Fine Coal• In a 3-Stage Water Cyclone Circuit*

    By J. Visman

    The water cyclone washer has a number of advantages that makes it a desirable machine for the cleaning of fine-grained and friable materials such as 1,4 x 0" slack coals. In this paper results are pre

    Jan 1, 1961

  • CIM
    Latest Fire Protection Innovations for Large-Scale Mining Equipment

    By Don A. Toth

    Until recently, the fire protection systems used to protect mining equipment were based on generically designed, off the- shelf concepts. These systems were reliant on single agent approaches and were

    Apr 1, 2005

  • CIM
    Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper Concentrator

    By M. Massinaei, S. Abasi, M. Oliazadeh

    Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o

    Jan 1, 2019

  • CIM
    Using Magnetic Liners to Reduce costs and Improve Efficiencies

    By Terry Keough

    Contents for discussion ?Current liner technology ?Innovation of magnetic products ?Development of magnetic wear liners ?Installation and change out method ?Uses and capabilities ?Internal we

    May 1, 2010

  • CIM
    Golden Giant Mine Mill Process Description and Operating Highlights

    By R. Tessier, C. R. Larsen

    "INTRODUCTIONOn November 10, 1982 Nor and a Inc signed an agreement with Golden Sceptre Resource Ltd. and Goliath Gold Mines Ltd. to construct a mine and milling facility.The Golden Giant mine is loca

    Jan 1, 1986

  • CIM
    Introduction -Papers on Cemented Backfill

    By J. R. Emery, D. F. Coates

    "FOUR PAPERS ON CEMENTED BACKFILL were given at the Annual General Meeting of The Canadian Institute of Mining and Metallurgy in 1970:Weaver, W. S., and Luka, R., ""Laboratory Studies of Cement-Stabil

    Jan 1, 1970

  • CIM
    Cyanide Destruction at Western Mines, Myra Falls Operations

    By A. G. Eccles

    "INTRODUCTIONWestern Mines' copper-lead-zinc operations are located in Strathcona Provincial Park, near the geographic centre of Vancouver Island. This park includes Buttle Lake, which flows into the

    Jan 1, 1977

  • CIM
    The Echo Bay Mines Silver Mill

    By Graham A. Karklin

    "The Echo Bay Mines silver property is located 875 air miles north of Edmonton, Alberta. The mine is on the east shore of Great Bear Lake at Port Radium which is twenty six miles south of the artic ci

    Jan 1, 1981

  • CIM
    Determining Ore Breakage Characteristics using the Steel Wheel Abrasion Test

    By Tapiwa Chenje, Victor Olivas, Peter Radziszewski

    "Ore breakage and grinding media wear have always been considered and determined separately in laboratory tests. However the two processes are linked with the ore broken down in any comminution device

    Jan 1, 2011

  • CIM
    Flotation Feed Size Distribution

    By Claude Bazin

    "Laboratory semi-batch flotation tests were conducted using two different sulphide ore samples. The size reduction was adjusted to cover a wide range of flotation feed size distributions. Results show

    Jan 1, 2006

  • CIM
    Metallurgical Testing of Gold Ores

    By T. Salman

    Most authorities agree that the dissolution of gold from an ore takes place according to the Elsner equation first stated in 1846. The main requirements for the dissolution reaction to proceed are:(1)

    Jan 1, 1975

  • CIM
    Precision and Bias For Settlements

    By Jan W. Merks

    "The settlements between mines and smelters are based on the mass of metal contained in concentrate lots. The mass of contained metal is a function of the wet mass of a lot, and its moisture content a

    Jan 1, 1995

  • CIM
    Improving Mining & Minerals Plant Performance ? Operations and Maintenance Working Together using new Information Technology

    By Gregory A. Johnson

    Operations and Maintenance departments have long had an adversarial relationship. The widespread evolution and adoption of modern management techniques such as Reliability Centered Maintenance (RCM) a

    Feb 1, 2008

  • CIM
    Towards Formalizing Qualitative Operations Input Data into Mine Planning

    By E. Lampard

    Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu

    May 1, 2011