Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Best Practice Database for Energy Management Initiatives in the Mining IndustryBy M. Y. Levesque
The Australian Government?s Energy Efficiency Opportunities (EEO) program launched in 2006 obliges companies that use more than 0.5 PJ (petajoule) or roughly 139 GWh (gigawatt hour) per year to conduc
Aug 1, 2013
-
Mill Modernization Program at Noranda Minerals Inc. Geco DivisionBy L. S. Urbanoski
This presentation describes a major modernization project at the Geco concentrator. The objectives of the program were to replace obsolete flotation equipment and upgrade process controls.Noranda Mine
Jan 1, 1987
-
Precipitation of Iron Oxides From Iron(II)/(III) Chloride Media at Ambient Temperatures Using Caustic, Lime or MagnesiaBy D. M. Muir
Many plants produce iron(II)/(III) waste liquors which must be treated by neutralisation and precipitation to remove the iron. Iron can be precipitated as crystalline goethite or jarosite by controlle
Jan 1, 2006
-
Investigation on Efficiency and Wear with the LCM Centrifugal MillBy Peter Mitschke, Friedrich Rosenstock, Heinrich Meiler
"The development of the Centrifugal Mill jointly by Chamber of Mines (Johannesburg) and LURGI GMBH (Frankfurt) had been described by L. Kitschen e.al. during the 14th IMPC at Toronto in October 1982.
Jan 1, 1985
-
Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick GoldstrikeBy M. Rantapaa
Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the
Jan 1, 2005
-
Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike (TECHNICAL PAPER)By R. Mckinstry, M. Rantapaa, T. Bolles
"Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the
Jan 1, 2005
-
Cleaning Fine Coal• In a 3-Stage Water Cyclone Circuit*By J. Visman
The water cyclone washer has a number of advantages that makes it a desirable machine for the cleaning of fine-grained and friable materials such as 1,4 x 0" slack coals. In this paper results are pre
Jan 1, 1961
-
Latest Fire Protection Innovations for Large-Scale Mining EquipmentBy Don A. Toth
Until recently, the fire protection systems used to protect mining equipment were based on generically designed, off the- shelf concepts. These systems were reliant on single agent approaches and were
Apr 1, 2005
-
Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper ConcentratorBy M. Massinaei, S. Abasi, M. Oliazadeh
Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o
Jan 1, 2019
-
Using Magnetic Liners to Reduce costs and Improve EfficienciesBy Terry Keough
Contents for discussion ?Current liner technology ?Innovation of magnetic products ?Development of magnetic wear liners ?Installation and change out method ?Uses and capabilities ?Internal we
May 1, 2010
-
Golden Giant Mine Mill Process Description and Operating HighlightsBy R. Tessier, C. R. Larsen
"INTRODUCTIONOn November 10, 1982 Nor and a Inc signed an agreement with Golden Sceptre Resource Ltd. and Goliath Gold Mines Ltd. to construct a mine and milling facility.The Golden Giant mine is loca
Jan 1, 1986
-
Introduction -Papers on Cemented BackfillBy J. R. Emery, D. F. Coates
"FOUR PAPERS ON CEMENTED BACKFILL were given at the Annual General Meeting of The Canadian Institute of Mining and Metallurgy in 1970:Weaver, W. S., and Luka, R., ""Laboratory Studies of Cement-Stabil
Jan 1, 1970
-
Cyanide Destruction at Western Mines, Myra Falls OperationsBy A. G. Eccles
"INTRODUCTIONWestern Mines' copper-lead-zinc operations are located in Strathcona Provincial Park, near the geographic centre of Vancouver Island. This park includes Buttle Lake, which flows into the
Jan 1, 1977
-
The Echo Bay Mines Silver MillBy Graham A. Karklin
"The Echo Bay Mines silver property is located 875 air miles north of Edmonton, Alberta. The mine is on the east shore of Great Bear Lake at Port Radium which is twenty six miles south of the artic ci
Jan 1, 1981
-
Determining Ore Breakage Characteristics using the Steel Wheel Abrasion TestBy Tapiwa Chenje, Victor Olivas, Peter Radziszewski
"Ore breakage and grinding media wear have always been considered and determined separately in laboratory tests. However the two processes are linked with the ore broken down in any comminution device
Jan 1, 2011
-
Flotation Feed Size DistributionBy Claude Bazin
"Laboratory semi-batch flotation tests were conducted using two different sulphide ore samples. The size reduction was adjusted to cover a wide range of flotation feed size distributions. Results show
Jan 1, 2006
-
Metallurgical Testing of Gold OresBy T. Salman
Most authorities agree that the dissolution of gold from an ore takes place according to the Elsner equation first stated in 1846. The main requirements for the dissolution reaction to proceed are:(1)
Jan 1, 1975
-
Precision and Bias For SettlementsBy Jan W. Merks
"The settlements between mines and smelters are based on the mass of metal contained in concentrate lots. The mass of contained metal is a function of the wet mass of a lot, and its moisture content a
Jan 1, 1995
-
Improving Mining & Minerals Plant Performance ? Operations and Maintenance Working Together using new Information TechnologyBy Gregory A. Johnson
Operations and Maintenance departments have long had an adversarial relationship. The widespread evolution and adoption of modern management techniques such as Reliability Centered Maintenance (RCM) a
Feb 1, 2008
-
Towards Formalizing Qualitative Operations Input Data into Mine PlanningBy E. Lampard
Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu
May 1, 2011