Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Recovering Iron and Zinc Values from Steel Plant Dusts with Simultaneous Destruction of Organic Wastes: The EnvIRONment Process

    By Reilly L, Worner H. K

    The EnvIRONment process has been developed to treat steel works dust and organic wastes simultaneously. A pelletised feed is fed into a special DC electric furnace, the pellets becoming immersed in

    Jan 1, 1995

  • AUSIMM
    The MTM copper process

    By R W. Shaw

    The MTM Process targets treating lower grade and/or problem concentrates that are not attractive to smelters. The process has been developed at laboratory scale for copper and is based on a related de

    Aug 24, 2022

  • AUSIMM
    Geometallurgy applied to small-scale mining: a case study

    By D Lozada, A Salazar

    Geometallurgy is a tool that, for more than a century, has been present in the implicit operations of mineral beneficiation. There’s a need to understand the characteristics of the material to be proc

    Aug 29, 2018

  • AUSIMM
    The use of Geometallurgy to Estimate Comminution Parameters within Porphyry Copper Deposits

    By G J. Harbort, K Lam, C Sola

    The relationship between the geology of porphyry copper deposits and their processing performance is an area of interest. Being able to predict comminution properties of the ore from physical characte

    Sep 29, 2013

  • AUSIMM
    Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored Shafts

    By R M. Stephenson

    Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi

    Mar 24, 2014

  • AUSIMM
    Long-Term Water Management - The Forgotten Legacy of Mine Closure

    By G Byrne

    Long-term water management is typically ignored in mine closure planning. A review of 73 mine closure plans dating from 2007 to 2013 shows that, on average, relinquishment is proposed to be achieved i

    Nov 26, 2013

  • AUSIMM
    Development of a Low-cost Instrument for Barometric Pressure Surveys

    By A S. Derrington

    High-accuracy, solid-state digital reference barometers have proven to be well suited to conducting underground barometric pressure surveys. The only problem is their expense; at least A$4000 each. Fo

    Aug 31, 2015

  • AUSIMM
    Mine Project Risk Management

    Risk management has become an essential tool for mining companies to ensure their projects are well-managed and profit expectations are achieved. Risk management has also become a mandatory corporate

    May 24, 2012

  • AUSIMM
    Practicalities of the use of fayalite slags for recovery of metals from urban wastes

    By E Jak, J Chen, B Hogg, S Nikolic, S Nicol

    The quantity of post-consumer ‘waste’ materials generated each year is rapidly increasing. These materials can contain significant quantities of critical metals and present an environmental challenge

    Jun 19, 2024

  • AUSIMM
    Evaluating the opportunities of XRT sorting technology using micro computed tomography and QEMScan

    By P Luo, J E. Danoczi, P Nakutnyy

    Sensor-based sorting methods to remove waste or for upgrading ore prior to downstream metallurgical processing is becoming more prevalent for mining operations. X-ray transmission (XRT) sorters are a

    Nov 10, 2020

  • AUSIMM
    On-site Process Mineralogy – Linking Departments and Disciplines with the Common Goal of Increasing Plant Performance

    By D Morgan, K Jones

    "In March 2015 Northparkes Mines (NPM) installed a process mineralogy facility on-site. The laboratory included a TESCAN TIMA scanning electron microscope (SEM) and was the first SEM facility to be co

    Oct 10, 2016

  • AUSIMM
    The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction Considerations

    By S Goff

    The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the

    Mar 8, 2011

  • AUSIMM
    Laboratory Experiments to Quantify the Pull-Out Strength of Single Strand Cable Bolts for Large Boreholes

    In high stress mining environments, production drill rigs are often employed for rapid drilling of boreholes for systematic cable bolting. One outcome of this drilling method is the need for larger bo

    Nov 25, 2010

  • AUSIMM
    Flotation as an Operation of Macromolecular Mass Transfer

    By M R. Drumond

    The present work presents a new theoretical interpretation of the flotation process, which can also be applied to other mineral processing physical unit operations. This interpretation is part of the

    Jan 1, 2005

  • AUSIMM
    Quantitative airblast risk assessments for block and sublevel caves

    By C Vejrazka1

    The occurrence of airblasts is one of the principal mining hazards in caving operations between the time of cave establishment and breakthrough of the cave to surface. As such, it needs to be managed

    Oct 12, 2022

  • AUSIMM
    Advances in In Situ Testing of Ventilation Control Devices for Underground Mines

    By M Salu, G J. Kay

    "As underground mines increasingly face the challenge of maximising production without losingfocus on safety excellence, the ability to predict the eff ectiveness of mine seals and stoppings andthe id

    Jun 1, 2012

  • AUSIMM
    Mine Wastes as Cover Materials in a Water-shedding Soil Cover in North-West Queensland

    By T Baumgartl, C Gonzales, A Soliman, M Edraki

    A soil cover isolates potentially acid-forming (PAF) mine wastes from atmospheric interaction and thereby mitigates acid mine drainage. As a cover that comprises either a single layer or a composite b

    Jul 16, 2014

  • AUSIMM
    Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, Australia

    By T J. Sullivan, H Pinkster, G Swarbrick

    From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o

    Nov 5, 2014

  • AUSIMM
    Review Lecture

    Delivered by K. B. Gross at the First Ordinary Meeting of the Australasian Institute of Mining and Metallurgy, August 18th, 1952.Mr. President, Ladies and Gentlemen:Confronted with the task of reviewi

    Jan 1, 1953

  • AUSIMM
    Mentoring and Your Career

    Young professionals are riding the current wave of high demand for their services and relatively little competition for placements. The attraction and retention of quality incumbents has therefore bec

    Jan 1, 2006