Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Metal cap versus steel lining system at Philsaga Mining Corporation’s Ø6100 mm SAG mill

    By N S. Weerasekara, S Town, E Lessing, J A. De Torres

    Philsaga Mining Corporation (Philsaga) had three main aims in converting their lining system from steel to metal cap. They wanted to increase mill availability, minimise localised high wear and optimi

    Aug 29, 2018

  • AUSIMM
    Controlled Blasting for Civil Construction in an Urban Environment

    By R Domotor

    Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r

    Nov 8, 2011

  • AUSIMM
    Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern Australia

    By D Timms

    The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T

    Aug 22, 2011

  • AUSIMM
    Selection of undrained shear strength parameters of residual soils and their application in stability analysis

    By Y Xu, T Rowles, B Dareeju, A Dissanayake

    Recent updates on tailings dam design guidelines require analysis of undrained (short-term) stability with the application of the SHANSEP model. The SHANSEP model, which was originally developed for a

    Jul 1, 2021

  • AUSIMM
    Relationship of Gold Quartz Mineralisation to Granodioritric Phases and Mylonites at Charter Towers Goldfield, Northeastern Queensland

    By Golding D

    The Charters Towers goldfield is located in the centre of a Lower to Mid-Palaeozoic igneous complex where schistose, amphibolite-grade metamorphic rocks were intruded by multiple phases of medium

    Jan 1, 1987

  • AUSIMM
    Developments in Equipment Used for Overburden Removal and Coal Winning in the Brown Coal Industry Part 1 Excavation Equipment

    The brown coal deposits of the Latrobe Valley are ideal for open cut mining and this method has been used since the start of coal winning in 1894. Operations at the main Yall9urn open cut commenced in

    Jan 1, 1960

  • AUSIMM
    Blast Fragmentation Measurement Based on Three-dimensional Imaging in Sublevel Caving Drawpoints and Underground Excavator Buckets at LKAB Kiruna

    By M J. Thurley, M Wimmer

    To assess the present-day functionality of large-scale sublevel caving at LKAB Kiruna a comprehensive measurement program was undertaken involving blast function, fragmentation and gravity flow. As pa

    Aug 24, 2015

  • AUSIMM
    Hydrogen plasma in extractive metallurgy application

    By M I. Pownceby, M A. Rhamdhani, S Palanisamy, D Fellicia, B Satritama, G A. Brooks, A Ang

    Metal production have long been using carbon sources as both reducing agents and energy sources. Consequently, the global extractive metal sector contributes significantly to greenhouse gas emissions,

    Aug 21, 2024

  • AUSIMM
    Innovative Beneficiation of Iron Ore Fines with allflux® Two-Stage Fluidised Bed Classifiers and gaustec® Wet High Intensity Magnetic Separators

    By A Horn

    Mineral processing is characterised by a constant adaptation to changing raw materials and market conditions. It is the link between the mined raw material and a marketable product. As a lot of high-g

    Jul 11, 2011

  • AUSIMM
    Critical process design considerations from test work to operations

    By A Dennis, T Hunter, R Coleman

    For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin

    Sep 11, 2017

  • AUSIMM
    Analysis on composition and physico-chemical property change of PbO-bearing slag in Pb smelting

    By G Cao, Y R. Cui, J X. Zhao, H P. Gui, G H. Wang, Z M. Wang, M M. Ren, B Li

    Pyro-metallurgy is still the main process for lead production and a lot of lead direct smelting processes have been developed in recent years. All the processes will experience two steps in common. Th

    Aug 21, 2024

  • AUSIMM
    Geothermal gradient determination for ventilation and air conditioning modelling at Malmberget Mine

    By F K. R Klose

    Malmberget is a sublevel caving mine owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB), a Swedish state-owned iron ore mining company, in northern Sweden. The mine has an annual iron or

    Oct 12, 2022

  • AUSIMM
    Understanding Mineralisation Controls – A Case Study of the Chesney Deposit

    By J Channell, G Phillips

    "The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai

    Aug 18, 2014

  • AUSIMM
    Impact of Blast Fragmentation on Hydraulic Excavator Dig Time

    By D Thornton, R Hodson, D Sprott

    Blast fragmentation size distribution and thus blast design have been found to have a direct impact on the load and haul cycle through excavator dig time and bucket payload. Previous studies have demo

    Jan 1, 2003

  • AUSIMM
    Managing Community Relationships and Corporate Reputation - A Stakeholder Perspective

    By S McEachern, J Lowe

    An important issue currently facing the mining industry in Australia is the management and cost to the industry and other stakeholders of entry into and exit from towns and their communities. These co

    Jan 1, 2006

  • AUSIMM
    Transition from owner mining to contract mining – a structured tender process using a holistic approach

    By Y G. Anoman

    This paper discusses the operating model within Endeavour Mining Corporation regarding the options of owner mining against contract mining. It’s based on the concept of ‘are we carrying out the most e

    Jun 22, 2022

  • AUSIMM
    Treatment and Rehabilitation of Acidic Waste Rock and Tailings – A 14-year Case Study

    By D Blair, T Scutts, L Fergusson

    This paper presents a waste rock treatment and rehabilitation program conducted at a metaliferous mine site in northern New South Wales from 2000–2013. It updates findings from 2005 for Program #1 (wh

    Jul 16, 2014

  • AUSIMM
    Coal Mine Main Fan Power Saving Project

    By F J. van Zyl, C A. S Thomson

    "Anglo American Thermal Coal conducted a high level study of all of its underground collieriesto determine if there were electrical power saving opportunities at the main fan stations.A systems approa

    Jun 1, 2012

  • AUSIMM
    Observations on the Behaviour of a Gold Tailings with Hypersaline Pore Fluid

    By D Reid

    Characterisation of non-plastic segregating tailings presents a number of challenges: the material cannot typically be sampled in an undisturbed state, remoulded samples exhibit different behaviour to

    Jul 27, 2015

  • AUSIMM
    Description of New Plant at South Mine, Broken Hill

    By Cunningham J. C

    JUST prior to the war the Broken Hill South Ltd: raised, on the average, 6628 tons of ore per week, all of which was crushed and treated in the 4-section gravity mill and the slime flotation plant, fo

    Jan 1, 1921