Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Outline of Electrical Plant Layout Mount Isa Mines Ltd

    By Edmonds G. A

    The power station went into operation in 1931, when the installed capacity was 12,500 kVA. with a loading of 4,000 kVA. In 1936 the loading increased to 6,750 kVA. which necessitated the addition of a

    Jan 1, 1953

  • AUSIMM
    Production Schedule Optimisation – Meeting Targets by Hedging against Geological Risk while Addressing Environmental and Equipment Concerns

    By M Spleit

    A long-term production schedule for the LabMag iron ore deposit in northern Quebec, Canada is derived using stochastic integer programming. The optimisation formulation maximises the schedule’s net pr

    Nov 24, 2014

  • AUSIMM
    The Marvel Loch Crusher Product Sampling System

    The Marvel Loch Operations (MLO) plant was treating ores from up to six MLO sources and in addition needed to blend externally sourced ores with its own ores. This presented a metallurgical accounting

    Mar 1, 2010

  • AUSIMM
    An Innovative Approach to Robust Optimisation for Scenario-Based Mineral Project Evaluation

    By S Coward, J Vann, R Wolff, S Jackson, S Moayer, A Bye

    Uncertainty about the future and orebody should significantly impact evaluation of mining projects. Scenario planning, widely used in other industries, for example in the petroleum industry, can provi

    May 24, 2012

  • AUSIMM
    Dynamic Simulation in Iron Ore Pelletising Plants

    By P Navarra, R Kuhne

    Dynamic simulation (discrete event simulation) is the preferred methodology to evaluate the impact of dynamic aspects of processing plants on the overall plant capacity. This tool can be used to: iden

    Jan 1, 2009

  • AUSIMM
    The Geometry and Petrography of Stockwork Vein Swarms, Macraes Mine, Otago Schist, New Zealand

    By D Craw

    The Macraes gold deposit is located in a low angle NE dipping (~15¦) shear zone, the Hyde Macraes Shear Zone (HMSZ) cutting greenschist facies metasediments of the Otago Schist. The shear zone is host

    Jan 1, 2004

  • AUSIMM
    Rheological Investigation of the Flotation Performance of a High Clay Containing Gold Ore from Carlin Trend

    By D Bradshaw, R Dunne, S Farrokhpay

    It is well known that clays affect the flotation performance, and many of the refractory gold ores around the world contain clay minerals. Therefore, an ore sample from the Carlin Trend was selected f

    Sep 26, 2013

  • AUSIMM
    Implementation of Advanced Flotation Control at First Quantum Minerals’ Kevitsa Mine

    By A Rantala, C Cruickshank, I Muzinda, O Haavisto, J Timperi

    The production at First Quantum Minerals’ (FQM) Kevitsa Mine, located in northern Finland, commenced during the second quarter of 2012. Presently, the mine processes approximately five and half millio

    Sep 1, 2014

  • AUSIMM
    Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem

    By M W. A Asad, E Topal, D S. S Sandanayake

    Underground mine planning requires an optimal stope layout as a prerequisite for the definition of an optimal production schedule. The procedure to generate an optimal stope layout considers an orebod

    Nov 24, 2014

  • AUSIMM
    Ventilation Planning Considerations when Dealing with Hot Groundwater

    By S Bluhm, L van den Berg

    In planning mine ventilation systems, heat issues are normally associated with deep-level mines where auto-compression and virgin rock temperatures play a major role. However, a number of mines suffer

    Aug 31, 2015

  • AUSIMM
    A geometallurgical approach towards the correlation between rock type mineralogy and grindability – a case study in the Aitik mine, Sweden

    By R Schmitt, Y Ghorbani, I McElroy, N J. Bolin, M Parian

    Aitik is a large copper porphyry type deposit located in northern Sweden, currently exploited at an annual rate of approximately 45 Mt. The ore’s exceptionally low head grade of 0.25 per cent Cu and v

    Aug 24, 2022

  • AUSIMM
    Wall Control Blasting

    By D P. Blair

    There are two major aspects to wall control blasting – the potential for any blasthole to cause wall damage and the potential for a delayed sequence of blastholes to cause damage. The damage potential

    Aug 24, 2015

  • AUSIMM
    Telepresence – the application of remote control and automation technologies for increased safety and productivity

    By J Cronin

    For the last decade, we have read about the great technical innovation that is coming to the mining industry that will increase safety and productivity. There is consensus that it will be a technical

    Oct 16, 2017

  • AUSIMM
    Modelling of Slag Blow in Copper Peirce-Smith Converters

    By P Vix

    A thermodynamic model of the copper Peirce-Smith (P-S) converter has been developed to predict the behaviour of magnetite in the converter slag, the amounts of slag and matte, the compositions of slag

    Jan 1, 2005

  • AUSIMM
    Comparing Different Prediction Techniques, and Field Results From South African Opencast Collieries

    By E de Necker, F D. I Hodg, L-M Cruywagen

    The acid mine drainage (AMD) situation at three opencast collieries in the Witbank Coalfield, South Africa, was evaluated from different perspectives. Twenty-seven test pits were dug into the spoils o

    Jan 1, 2003

  • AUSIMM
    Rolling Mills finishing Processes Analysis

    By Atalla YM

    Steel rolling mill product finishing pro cesses gradually become or often already are unsuited for current production and marketing conditions. Indications are made as to what has been done to (i)

    Jan 1, 1975

  • AUSIMM
    Development of the production optimiser through collaboration between Evolution Mining and Minnovare

    By C McCracken, R Landers, B Hesse

    Minnovare identified the potential to improve production drilling outcomes in underground long-hole stopes through the adaptation of new technology which was under ongoing development. An approach to

    Mar 15, 2021

  • AUSIMM
    Ground Support Design and Application for Developing in Pastefill at BHP Billiton – Cannington Mine

    By J Li

    Cannington Mine has been developing through paste backfilled stopes since the year 2000. These paste drives have been used as either production drill accesses or long-term bypasses. Prior to this stud

    Mar 21, 2011

  • AUSIMM
    The Flotation of Water-Soluble Minerals ù Peculiarities and New Technologies

    By V Novoselov, R Sabirov

    Flotation processing technology of water-soluble minerals has made it possible to realise, since the 1960s, the wide scale industrial processing of potash and potassium-magnesium ores (about 200 milli

    Jan 1, 2005

  • AUSIMM
    Mechanisms on the impacts of basicity on hydrogen-rich gas-based direct reduction of pellets

    By J Pan, C M. Tang, D Q. Zhu, C C. Yang, S W. Li, Z Q. Guo

    The short process of electric furnace steelmaking with direct reduction iron (DRI) as raw material is an important process for smelting high-quality and special steels. In order to prepare high-qualit

    Sep 18, 2023