Search Documents

Sort by

  • SME
    Optimization Production Scheduling of Underground Backfilling Mining Based on NSGA‑II

    By Aijuan Zhang, Liang Zhao, Yutao Wang, Yu Bao

    In the green backfilling mining of underground coal mines, gangue in a coal seam is used to replace and fill goafs. However, the gas drainage time changes in the amount of gangue output and order in t

    May 23, 2022

  • DFI
    Building Above And Excavating Below An Iconic Building In Manhattan

    By John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta

    The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical

  • AIME
  • AUSIMM
    Off to a Good Start with Lift #2: Drawbell Extraction ù Northparkes

    By M Lovitt, T Hewitt

    The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside

    Jan 1, 2005

  • SME
    Slurry Shield Method In Japan

    By Hisashi Takahasi, Hironobu Yamazaki

    INTRODUCTION The slurry shield method was developed in Japan in 1963 and its experimental tunnelling work was performed in 1965. Although the history of this method is short compared with the conve

    Jan 1, 1976

  • CIM
    Underhand Cut and Fill Mining as Practiced in Three Deep Hard Rock Mines in the United States

    By Ted J. Williams

    Underhand cut and fill mining methods are used at the Lucky Friday, Stillwater, and Galena mines in the western US in an effort to safely mine in difficult ground conditions and as a primary mining me

    May 1, 2007

  • AUSIMM
    Epithermal Deposits and Analogous Geothermal Systems - A Physical Size Comparison with Implications for Exploration

    By J L. Mauk

    Low sulfidation epithermal deposits are important sources of gold and silver, and are considered the extinct analogues of modern geothermal systems. The aerial extents of alteration halos that surroun

    Jan 1, 2004

  • ISEE
    Discrete Element Modeling of Rock Blasting in Benches, with Joints and Bedding Planes - Initial Development

    By Dale S. Preece

    A Discrete element computer program named DMC @istinct Motion Code) has been developed for modeling rock blasting. This program employs explicit time integration and uses spherical or cylindrical elem

    Jan 1, 1995

  • SME
    Geophysics And Its Role In The Discovery Of The Candelaria Copper-Gold Deposit In Chile

    By Jr. Matthews

    The Candelaria copper-gold deposit is located in Region m of Chile, 805 kilometers north of the capital, Santiago. Candelaria was discovered in 1987, following a six month exploration program. In late

    Jan 1, 1996

  • SME
    TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022

    By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell

    As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic

    Dec 1, 2022

  • CIM
    The David Bell Mine Water Quality Management Strategy (e343643b-635a-4023-9840-0613ce7068b5)

    By K. Meyer, M. E. Goddfellow

    "At Teck-Corona Operating Corporation's David Bell Mine, a water quality management strategy is employed to produce both a chemically and biologically clean effluent prior to discharge to the environm

    Jan 1, 1991

  • TMS
    Physicochemical Study For The Reduction Of Nickel Concentrate Calcine With Products Of Vapor Oxidation Of Fuel Oil And Solid Carbon

    By Andrey V. Tarasov

    To carry out a physicochemical substantiation of a transition to ?soft? modes of reduction of calcine obtained by desulfurizing roasting of nickel concentrate produced as a result of copper-nickel con

    Jan 1, 2005

  • SME
    Using Risk Analysis To Support Decision Making On The Central Subway Project

    What decision making tools and methods are available to a project owner when there is no clear differentiator between construction alternatives? A team led by a joint venture of Parsons Brinckerhoff a

  • SME
    A Critical Analysis of Overcoring Stress Measurements from US Underground Coal Mines

    By J. A. Rusnak, M. M. Gadde, S. S. Peng

    In situ stresses are one of the key inputs to a successful underground excavation design. Because of the complex mechanisms involved in arriving at the current state of stress at a point in the Earth’

    Jan 1, 2006

  • DFI
    Pin Piles For Seismic Rehabilitation Of Bridges

    Since the 1989 Loma Prieta Earthquake in the San Francisco Bay Area, the California Department of Transportation (CALTRANS) has accelerated seismic upgrading of their bridges. Many structures can be i

    Jan 1, 1993

  • CIM
    Troubleshooting Flotation Cell Operation Using Gas Velocity Measurements

    By Donald Leroux, Ralph Dahlke, Dave Scott, Finch. James A., Cesar O. Gomez

    "The efficiency of the flotation process depends on how effectively air is dispersed into small bubbles. Bubble surface area flux - the surface area of bubbles per unit time per unit cross-section are

    Jan 1, 2001

  • DFI
    Installation Of Marine Pile Foundations At The Skyway Project For The San Francisco Oakland Bay Bridge

    By Robb L. Swenson

    Construction of foundations for the Skyway Segment of the San Francisco Oakland Bay Bridge required innovative techniques due to the mass of the structures being inserted and the unique subsurface of

    Jan 1, 2005

  • SAIMM
    Letseng Mine No. 2 Plant Project -A Process Engineering And Design Review

    Bateman Engineering managed the establishment of a second diamond treatment plant at the Letseng Mine in the Mokhotlong District of northern Lesotho, about 100 km from the town of Buthe Buthe. Letseng

    Jan 1, 2010

  • IIMP
    Gestión de Stock Pile y mejoras en molienda para control del P80 en un circuito SABC - A

    By Hugo Toledo, Antonio Bravo, Rafael Carpio, Samuel Apolinario

    La planta concentradora de compañía minera Antapaccay tiene un circuito de molienda SABC, compuesto de un molino SAG de 40’ x 25’, dos molinos de bolas de 26’ x 40.5’, dos chancadoras de pebbles, un s

    Sep 30, 2022

  • DFI
    High Capacity Piles In The Hamilton Bayfront Area

    By C. D. Thompson

    Pile load test programs were carried out in 1984 and 1985 at Stelco's and Dofasco's Steel Making Plants in the Hamilton Bayfront area. 323.9 mm outside diameter by 9.5 mm wall thickness Grad

    Jan 1, 1987