Search Documents

Sort by

  • AUSIMM
    Contributions from Improved Surface Mine Haulage Road Design, Operation and Management Techniques to Sustainable Development

    Operating well designed and maintained surface mine haul roads is the key to minimising truck haulage costs - in itself a significant component of the total cost per tonne mined. Existing and proposed

    Jun 1, 2010

  • DFI
    Secant Pile Shoring - Developments In Design And Construction

    By Eric S. Lindquist

    High groundwater levels combined with variable soil and rock profiles present challenges to the design and construction of deep excavation support systems. Increasingly, secant piling techniques are t

    Jan 1, 2011

  • AUSIMM
    Separation of Nickel and Cobalt from Manganese, Magnesium and Calcium by Synergistic Solvent Extraction - From Batch Tests to Pilot Plant Operation

    Separation of Nickel and Cobalt from Manganese, Magnesium and Calcium by Synergistic Solvent Extraction - From Batch Tests to Pilot Plant Operation The synergistic solvent extraction system consistin

    Sep 13, 2010

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal Using the Parry Process (6d646f40-1507-4d07-950f-53652f2f845c)

    A pilot plant was constructed for the low temperature carbonization of Wallarah (N.S.W.) coal at the rate of 300 lb/hr. The design was based on an entrained state carbonizer developed by Parry and D.S

    Jan 1, 1963

  • SME
    South Arturo: A Recent Gold Discovery On The Carlin Trend

    By Ed Cope

    The newly discovered South Arturo deposit is a Carlin-type, breccia-hosted, oxide gold deposit located on the Dee Mine property at the north end of the Carlin Trend in Nevada. The Dee Gold Mine was

    Jan 1, 2008

  • NIOSH
    Updating the NIOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design Features

    By Thomas M. Barczak

    The initial Support Technology Optimization Program (STOP),Version 1.0, was released at the 19th Ground Control Conference. This original program has since been updated to Version 2.3 which was releas

  • ABM
    EFEITOS DA DEFORMAÇÃO PLÁSTICA SEVERA APLICADA A FRIO POR ECAP VIA ROTA C EM UMA LIGA Al AA1070

    By Gabriel Gonçalves Pessoa de Castro

    O trabalho teve por objetivo produzir uma liga Al AA1070 com granulometria fina a partir de um material com granulometria grosseira, por meio de deformação plástica severa (DPS) aplicada por prensagem

    Aug 16, 2017

  • NIOSH
    IC 8115 Mine Water Control Program, Anthracite Region Of Pennsylvania: July 1955 - December 1961

    By H. A. Dierks

    Implementation of the joint Federal-State control program established in 1955 to cope with the mine water problem in the Pennsylvania anthracite region is described in this report. The increasing seve

    Jan 1, 1962

  • AUSIMM
    The Investigation of a Gold Prospect

    This paper deals chiefly with the preliminary examination, when a decision has to be made as to whether a prospect has a chance of developing into a mine or not. At this stage it is important to have

    Jan 1, 1950

  • ISEE
    Digitally Integrating the Blast Design with Remote Wireless Electronic Blasting

    By Charles Pretorius

    Electronic Delay Detonators (EDDs) with remote wireless programming and initiation capabilities have been successfully used for almost two years now. This system has been used in blasts mainly in Sout

    Jan 1, 2005

  • SAIMM
    An Integrated Approach Of Waste Issues On Metalurgical Sites

    By Gaspard Devos

    1. A NEW CONTEXT FOR METAL INDUSTRY Producers and owners of industrial extractive sites are living hard times due to Environmental pressure and liabilities. This is valid whatever the region i

    Jan 1, 2005

  • AUSIMM
    Proposesd Research Laboratory at Risdon, Tasmania, for the Electrolytic Zinc Co. of Australasia Ltd.

    The development of research activities at Risdon and the implementing of a policy of instrumentation in plant processes have, in recent years, entailed a considerable increase in research staff and cr

    Jan 1, 1949

  • NIOSH
    Tests Of Fiber-Reinforced Shotcrete At The Chief Joseph Mine, Butte, Montana

    By Lewis A. Martin

    Researchers from the Spokane Research Laboratory, National Institute for Occupational Safety and Health, in cooperation with engineers from the Department of Mining and Geological Engineering, Montana

    Jan 1, 2004

  • SME
    Taconite Mining – Concerns and Challenges

    By William R. Yernberg

    The combined 75th Annual Minnesota Section of SME meeting and 63rd Annual University of Minnesota Mining Symposium was held April 9 and 10, 2002, in Duluth, MN. This year’s theme was “Keys to the Fut

    Jan 1, 2002

  • SME-ICGCM
    Factors Influencing the Occurrence of Coal Pillar Bumps at the 9-Right Section of the Olga Mine

    By David C. Oyler

    The Bureau of Mines conducted research at the 9-Right Section of the Olga Mine to determine the cause of bumps and aid in the development of appropriate control techniques. The purpose of this paper i

    Jan 1, 1987

  • ISEE
    Quality Control of Bulk Explosive Products to Minimize the Risk of Fumes

    By Alastair Torrance, Mitchell Nipperess, Andrew Olsson, Italo Onederra, Gary Cavanough

    Components of bulk explosive products include ammonium nitrate, water, fuel, stabilizers, and calcium nitrate. The physical attributes include prill/emulsion ratio, density, and viscosity and in the c

    Jan 1, 2015

  • AUSIMM
    Characterisation and Classification of Veined Rocks for Rock Mass Behaviour Assessment

    By R P. Bewick

    Many future and current block and panel caves extract ore from veined rock masses. These rock masses are composed of open joints forming blocks or rock with healed networks of veinlets. These two type

    May 9, 2016

  • CIM
    Post Start-Up Modifications to the Golden Bear Roaster

    By S. McCalpine, W. Muir, P. J. Downey

    "Golden Bear Operating Company Ltd. (GBOC) was a joint venture between Chevron Minerals Ltd. and North American Metals Corp. that was formed for the development of the Golden Bear Project. The mine is

    Jan 1, 1992

  • CIM
    The New Britiannia Project a TVX Gold Inc. /High Rlver Gold Mines Ltd. Joint Venture

    By Roy Lindsay, Paul O'Hara, Gary Halverson

    "The New Britannia Minesite is located in Snow Lake, Manitoba, 420 miles north of Winnipeg (figure 1). The mine previously operated from 1949 to 1958 extracting some 5.39 million tons of ore at a 0.15

    Jan 1, 1996

  • SME
    The Owner?s Manual on Contracting Strategies for Large Projects ? Introduction

    By Faruk Oksuz

    The owners of large infrastructure projects are challenged on how to implement sound engineering and construction contracting strategies that address their prime expectations: a quality job, on time a

    Jan 1, 2008