Search Documents

Sort by

  • CIM
    Ecological Engineering and Biological Polishing Methods to Economize Waste Management

    By M. Kalin

    "SUMMARYWaste management in general, and the water treatment of mine and mill effluents, has become an ever increasing burden for mining operations. A reduction in these expenditures would undoubtedly

    Jan 1, 1988

  • AUSIMM
    Nui Phao mine – flotation circuit upgrade

    By S Morgan, A Jakowetz, S Taylor, B Weekes, S Litson, P Bourke, T L. Do

    In the current tough mining environment with lower commodity prices, operators need to improve operational profitability. Optimised equipment asset management is a sustainable way to achieve this obje

    Sep 11, 2017

  • AUSIMM
    Zinc extraction and refining (d2ff8c77-a915-4b29-b3fc-8901b38144f0)

    The history of zinc production in Australia is outlined including attempts to make zinc electrolytically at Cockle Creek, N.S.W. in the last century, the use of horizontal retorts at Cockle Creek and

    Jan 1, 1986

  • SME
    Towards a More Cost Effective Mining Truck – Preprint 97-55

    By A. W. Dickerson, G. Hollier, F. A. Bartley

    Following on from many years of research aimed at improving the effectiveness of truck haulage operations in mines operated by BHP Minerals, BHP Research developed a concept for an Innovative Large Mi

    Feb 24, 1997

  • SME-ICGCM
    Technique To Measure Resultant Load Vector On Shield Supports (b937ef33-c51b-4de4-a956-dc8be749fea8)

    By Thomas M. Barczak

    The resultant load vector is the representation of the forces applied to a longwall roof support element by caving strata into a single, quantifiable measure of support resistance. The relatively comp

    Jan 1, 1984

  • ISEE
    Overburden Blast Cast Designs, Factors Affecting Results and Economics

    By Connie Postupack

    The purpose of the workshop is to show the effect of various blasting factors on the overall results.

    Jan 1, 1994

  • CIM
    New Technology Provides Expanded Mine Design Options

    By Michael J. Kelly

    IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will re

    Oct 1, 2010

  • CIM
    Barrick?s Global Approach to Ground Control Management

    By J. Ran

    Ground instability is among the major causes of serious incidents and production disruptions in the mining industry and has a significant impact on safety. Mining companies may have operations in a nu

    May 1, 2006

  • CIM
    Challenges in Niobium Flotation

    By S. Kelebek, C. Gibson, M. Aghamirian

    "Global niobium production is currently dominated by three operating mines, Araxá and Catalão in Brazil, and Niobec in Canada. Although over 90% of the world’s niobium is mined and processed in Brazil

    Jan 1, 2015

  • SAIMM
    Proceedings, 109th Annual General Meeting, 2006

    The 109th Annual General Meeting of The South African Institute of Mining and Metallurgy was held at The Country Club, Johannesburg, Napier Road, Auckland Park on Wednesday, 16 August 2006. Special

    Jan 1, 2006

  • CIM
    A Precise, Reliable, and Fully Automatic Real Time Monitoring System for Steep Embankments

    By Rick Wilkins

    The stability of steep embankments is a major safety issue in open pit mining, highway passes, and earth filled dams. A failure in any one of these situations could mean a loss of very expensive equip

    May 1, 2002

  • DFI
    Extrapolation of Unit Side Resistance in Drilled Shaft Foundations Based on Bi-Directional Load Test Data

    By Ramin Motamed, Joseph A. W. Toth

    Evaluation of the capacity of large-diameter drilled shafts using current load test methods present challenges when considering the magnitude of loads required to fully mobilize their capacities. Ofte

    Jan 1, 2018

  • AUSIMM
    Enhancing the Flotability of Gold-Bearing Ores by a Mixture of Collectors

    Enhancing the Flotability of Gold-Bearing Ores by a Mixture of Collectors

    Sep 13, 2010

  • SAIMM
    Energy Consumption For Kell Hydrometallurgical Refining Versus Conventional Pyrometallurgical Smelting And Refining Of PGM Concentrates - Synopsis

    By K. Liddell

    Current practice for the recovery of platinum group metals (PGM) from flotation concentrates is by energy-intensive smelting processes followed by separation and refining of the base and precious meta

    Jan 1, 2011

  • NIOSH
    RI 6145 Low-Temperature Phase Equilibria Of Helium-Bearing Natural Gases: Hansford Gas

    By Lowell Stroud

    This report is the third in a series presenting equilibrium vapor-liquid data for helium-bearing natural gases. The first two reports contained phase data for the gases processed for helium at the Bur

    Jan 1, 1963

  • SAIMM
    Design Of Permanent Intruded Plugs At South Deep Gold Mine

    By G. S. Littlejohn

    In anticipation of the flooding of an adjacent dolomitic groundwater compartment, five rough parallel sided boundary plugs at 58 and 50levels have been designed to resist safely hydrostatic heads of 1

    Jan 1, 2006

  • AUSIMM
    The-Application of Optimal Control to Open-Pit Planning

    Preliminary work being undertaken on the optimisation of decision strategies for an open-pit metalliferous deposit is presented. The Optimal Control method has been selected rather than the easier to

    Jan 1, 1984

  • SME
    Observations on the 2005 PDAC Convention

    By Bruce Geller

    The 2005 Prospectors and Developers Association of Canada (PDAC) convention continued the upbeat mood found in 2004. The global mining industry is booming due to higher commodity prices in nearly eve

    Jan 1, 2005

  • SME-ICGCM
    Investigating Abutment Load

    By Ihsan Berk Tulu

    In the Analysis of Retreat Mining Pillar Stability (ARMPS) program, the magnitude of the abutment loading adjacent to a gob area is calculated using an ?abutment angle? concept. The extent of the abut

    Jan 1, 2012

  • CIM
    Study on the Impact of Using Cyclones Rather than Screens in the Grinding Circuit at Niobec Mine

    By Y. Sasseville

    "Niobec has been using vibrating screens and screw classifiers as a double stage classification in its grinding circuit since the very beginning of its operation in St-Honoré. Most of the other minera

    Jan 1, 2015