Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Burn Cut Pull Optimization through Varying Relief Hole DepthsBy Michael Allen, Paul Worsey
In underground blasting, the pull of the initial cut is the limiting factor for the success of the rest of the round. By improving the pull of the first cut, a critical step is made towards improving
Jan 1, 2015
-
The Application Of Exergy Analysis To The Cooling Of A Deep UK CollieryThe extraction of minerals and coal at greater depth, employing higher-powered machinery to improve production levels, imposes an increased burden on the ability of a ventilation system to maintain an
Jan 1, 2004
-
Technical Innovations And Advances Make Wirtgen Surface Miner A Viable Alternative To Traditional Drill And Blast / Ripping OperationsBy R. Bauer
Adaptations and redesign of the existing already very successful and proven road milling machine concept and technical innovations such as an optimized, specifically for mining application developed c
Jan 1, 2007
-
Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)By Larry DeGraff
With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr
Jan 1, 2009
-
A Petroleum Industry Approach To Coal Mine Gas DrainageBy J. Sandford, S. Hennings
EXECUTIVE SUMMARY An approach borrowed from the petroleum industry was applied to the gas development evaluation for the Bulga underground coal mine in New South Wales, Australia. The results enabled
Jan 1, 2007
-
Seismic Design Evaluation of the Bay TunnelBy Yiming Sun
The 5-mile long Bay Tunnel is a major water supply facility to be constructed under the San Francisco Bay and adjacent marshlands between the San Andreas Fault to the west and the Hayward Fault to the
Jan 1, 2008
-
Appropriate Field Measurements For Testing Capacity-Prediction Methods For Piles Installed By Vibration - IntroductionBy Michael W. Neill, O&apos
The engineering profession generally does not accept vibro-driven piles as bearing piles unless their capacities can be verified by restriking with an impact hammer, which significantly reduces the ec
Jan 1, 1989
-
A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand SilosA key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings
May 1, 2007
-
The Wabush Mines ConcentratorBy Timothy R. Eby
"The Wabush Mines project was formed in 1956 to develop a large iron ore property in Western Labrador. The town of Wabush along with the mining and concentrating facilities are located 640 air miles f
Jan 1, 1978
-
RI 9213 - Fe-Ni-Cr Alloys for Coatings and ElectroformsBy J. E. Allison
As part of a Bureau of Mines research program to conserve critical and strategic metals, an aqueous electrodeposition method for preparing stainless-steel-type coatings was studied. Chromium powder (a
Jan 1, 1989
-
Ultra-Thick High-Production And High-Efficiency Longwall Mining Technique With Retreat Mining Along The Seam Dip Direction And Under Complicated Geological Conditions (6f1eec60-4383-4b46-a3c6-b20670410c29)By Ke Yang
In Chinese coal mines, extraction of deep, highly gassy soft coal seams sandwiched between soft floor and soft roof in complicated geology is commonly encountered. How to safely and efficiently excava
Jan 1, 2009
-
Preliminary Evaluation of Spark Plasma ExtrusionBy K. Morsi
The interest in spark plasma sintering has been growing considerable over the past few years. This has been brought about by the unique advantages of the process, which include reduced sintering tempe
Jan 1, 2009
-
Geology of the Area South of Mt. Isa and its Application to the Structural Control of the Mt. Isa OrebodiesBy Wilson G. L, Lord J. H
A detailed analysis of faulting indicatcs that blocks of "greenstone" have been thrust beneath the southern end of the Mt. Isa orebodies.This "greenstone" basement is considered to
Jan 1, 1963
-
Modification and Enhanced Testing of Data Mining-Based Algorithm to Detect Subtle Errors in Temperature Sensors in Gold Stripping Circuit Mining, Metallurgy and Exploration (cca8e619-0fb1-422a-925d-6e04d2a067f5)By Eduardo Pimenta de Melo, Rambabu Pothina, Rajive Ganguli
Sensors are everywhere in the mining industry, with sensor information being used to monitor and operate processes. Therefore, when sensor information is wrong, economic losses can occur. Unfortunatel
-
A New Recycle Process of Uranium from Spent Fuel by Selective SulfurizationBy Nobuaki Sato
For the recovery of uranium from spent nuclear fuel, sulfide reprocessing process, which consists of voloxidation, selective sulfurization, and magnetic separation or selective dissolution steps, are
Jan 1, 2006
-
Times Square Connection: ?Supporting The Cross Roads Of The World?By Victor F. Paterno
In December of 2007, a joint venture of J.F Shea, Skanska and Schiavone referred to as S-3II, was awarded a $1.15 billion (? 886,880,000) contract to construct the run-ning tunnels and station structu
-
A Petrographic Basis for Classifying Australian CoalsThe proposed classification scheme is based on two primary parameters, one for petrographic composition and the other for rank, both being determined with microscopic techniques. The scheme has been a
Jan 1, 1970
-
Tanana River Bulkhead Expansion, Flexibility In Construction; Key To Arctic Dock ConstructionBy Roy Peratrovich
An innovative cost-saving design for a 1,100 ft bulkhead on the Tanana River at Nenana in central Alaska won Alaska Construction & Oil magazine's Construction Achievement Award. The designers uti
Jan 1, 1985
-
Shear-Flocculation in Mixtures of Scheelite and GarnetBy Warren L. J
The effectiveness of shear-flocculation as a method for upgrading simple mixtures of ultrafine (1-11 \lm) scheelite and garnet was evaluated. Statistical methods were used in the design and analysis o
Jan 1, 1977
-
The Fall and Rise of the Feasibility StudyThe theme of this paper is the development of-the project feasibility study which includes discussion of the work which is carried out in preparing the project feasibility study, the necessary eval
Jan 1, 1990