Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Single Level Extraction At KoffiefonteinBy R. L. Pienaar
Paper written on project work carried out in partial fulfilment of B Eng (Min. Eng.) degree A study was conducted to investigated and compare the feasibility of two single level extraction layouts
Jan 1, 2006
-
Stratablasttm - A New Mining MethodBy T Goswami
The conventional practice in open cut coal strip mining has been to blast the overburden or coal layers in separate blast events. This is done in order to maximise the benefits from throw blasting and
Jan 1, 2006
-
Process Development for Milling B-Zone Ore at Rabbit LakeBy S. Dicarlo
"In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia
Jan 1, 1988
-
Monitoramento de Aplicações no ambiente de Automação IndustrialBy Anderson Ayres Bittencourt
O monitoramento de sistemas e ativos de automação sempre existiu de forma rudimentar e descentralizada. A análise desses dados tanto quanto sua obtenção é um desafio para as empresas atuais. Foi a par
Oct 30, 2017
-
Statnamic Load Testing; Overview And Case Histories Of Augered Cast-In-Place PilesBy Mike Muchard
Augered cast-in-place piles are one of the most cost effective deep foundation options available to designers but have been largely underutilized due to skepticism associated with quality assurance an
Jan 1, 2000
-
A Review Of Optimal Planning Of Level And Raise Spacing In Inclined Narrow ReefsBy C. Musingwini
The subject of optimal planning of level and raise spacing for inclined narrow reef deposits has received intermittent attention over the years because the subject matter is inherently complex. Previo
Jan 1, 2010
-
RI 7657 - Effect Of A Surface Borehole On Longwall Gob Degasification (Pocahontas No. 3 Coalbed)By M. G. Zabetakis, T. D. Moore
The use of a partially slotted 6.5-inch-inside-diameter vertical pipe to remove methane from a longwall gob area at a depth of 2,260 feet in the Pocahontas No. 3 coalbed ms investigated. The value of
Jan 1, 1972
-
Recent Projects - Downtown Demolition Dykon “withdraws” 13-story Columbia Bank from Kansas City skylineBy Jack Curran
KANSAS CITY, MO - Performing one of the most impressive urban building-implosion projects in recent memory, Tulsa, Oklahoma-based Dykon Explosive Demolition Corp. and Omaha, Nebraska-based Anderson Ex
Jan 1, 2003
-
Applied communicationsBy B. J. Clauzier
"The Falconbridge Limited approach to employing communication equipment is first, to determine what is required in a given situation, second, to evaluate the possible alternatives, third, to select th
Jan 1, 1987
-
Seal Slab / Steel Pile Interface Bond From Full-Scale TestingBy Gray Mullins
This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen
Jan 1, 2013
-
Arsenic Management and StabilizationBy K. Lundholm, A. E. Mäkinen
"Ore grades are declining and getting more complex around the world which not only complicate the ore processing but also produce new type of requirements to manage the produce waste streams. One spec
Jan 1, 2014
-
Secondary Breaking Strategy For Block 4 At De Beers - Finsch MineBy R. D. Hull
Paper written on project work carried out in partial fulfilment of B.Sc. (Eng.) (Mining) degree As a partial fulfilment for the degree of B.Sc. (Eng) (mining) at the University of the Witwatersrand
Jan 1, 2002
-
Froth Based Indicators as a Tool for Flotation DiagnosisBy Patrick Pelletier Jr., Pierre-Alexandre Bossé, Gianni Bartolacci, Ian Orford, Steve Parent
"Over the last decades, many authors have shown the importance of froth in the flotation process. Mineral recovery is related to froth recovery and flotation. Selectivity is affected by froth characte
Jan 1, 2006
-
Operational Management of Fire Suppression SystemsFire suppression systems are now recognised by both NFPA 502 and PIARC as legitimate tools for both life protection and asset protection. The effectiveness of these tools for life protection demands e
Jan 1, 2008
-
Vibration Characteristics on Surface and in Underground Openings from Opencast Mine BlastingBy M. Roy
Safety and stability of underground coal mine workings are always in danger when opencast mines are operating in close proximity. A study was conducted to investigate the level of vibration generated
Jan 1, 2007
-
Metals And Alloys Water Solidification A Bridge From Pyro- To Hydro-MetallurgyBy David Norval
The increased tendency to use hydrometallurgy as an extraction step towards final refining following a pyrometallurgical smelting process requires melts which have to be cast and or comminuted which c
Jan 1, 2005
-
Guidewall Demolition at Bonneville DamBy Randall S. Marks
Bonneville Dam, completed in 1938, included the smallest and busiest lock on the Columbia and Snake River Navigation System. To expedite barge traffic through this restriction, a new larger lock was d
Jan 1, 1997
-
Coal - Surface Subsidence Associated with Longwall MiningBy W. C. McClain
The amount of vertical subsidence occurring over a longwall operation is a function of the thickness of material removed, the quantity and quality of any fill material, the width of the extraction, an
Jan 1, 1967
-
The Mining Industry and The National Economy of AustraliaYour Excellency, on behalf of the Council of the Australasian Institute of Mining and Metallurgy, and, indeed, on behalf of everyone present, I extend to you a welcome, and our thanks for your graciou
Jan 1, 1944
-
Geología económica del depósito aurifero Alpacay, Arequipa, PerúBy Roxana Barrantes Huamán
El presente texto describe la geología económica del depósito aurífero Alpacay ubicado en Arequipa, Perú. El depósito Alpacay es un típico depósito mesotermal, filoniano que es explotado por la Cía Mi
Sep 12, 2011