Search Documents

Sort by

  • SAIMM
    Evaluation Of Elastic Deformation Energy In Stone Cutting Of Portuguese Marbles With A Diamond Saw ? Synopsis

    By P. Falcão Neves

    A detailed analysis of the geomechanical behaviour in rock cutting with a diamond saw is provided to obtain a better understanding of the mechanisms involved in the process. The energy of elastic def

    Jan 1, 2012

  • SAIMM
    Ilmenite Smelting At Ticor SA (c5ed7b50-45b1-4be9-8346-a5752e8bd56e)

    By H. Kotzé

    Ticor SA began with a detailed feasibility study in 1995. The Hillendale mine (situated between Richards Bay and Empangeni) and mineral separation plant were approved in 2000. The smelter, just outsid

    Jan 1, 2006

  • CIM
    Characterization of Rapidly Solidified Metallic Alloys Using Combination of Experiments and Modelling

    By A-A. Bogno, Ch. -A. Gandin, A. Maitre, H. Henein

    Most metallic materials are produced from their liquid state. In order to control the properties of industrial products, it is very important to understand their solidification path and the resulting

    Jan 1, 2014

  • SAIMM
    Systems simulation for dragline selection in open cast mines

    By K. M. Li, Y. D. Zhang

    The selection of stripping dragline is a complicated problem. Several factors, such as the deposit buried conditions, the demand of mine production rate, cast blasting result, the mining/stripping ope

    Jan 1, 2003

  • CIM
    Metallurgy of the Mt. Milligan Porphyry Gold/Copper Deposit

    By A. B. Cron, R. MacPhail, L. Melis, K. Armstong

    "Mt. Milligan is a porphyry gold/copper deposit in north-central British Columbia. Diluted and mineable drill-indicated reserves total 449 million tons at an average grade of 0.013 oz gold/ton and 0.1

    Jan 1, 1991

  • DFI
    Minipiles In Soft Marine Deposits Rescue Sinking Warehouse

    By Bruno Gemmi

    A new warehouse built with prefabricated components over an area underlined by soft marine soil deposits started showing differential settlements well before its completion. Its 103 spread footings c

    Jan 1, 2011

  • ISEE
    Saving Time and Money with Mobile Reporting and Online Databases

    By Matt Slezak, Tristan Worsey, Nathan Rouse, Kyle Hall

    As everyone knows, blasters are required to file blast reports of every blast for regulatory purposes. To this day, the authors see many handwritten blast reports. Handwritten blast reports are notori

    Jan 1, 2018

  • AUSIMM
    Computer-Based Design of Open Cut Mines

    Three stages are involved in the complete design and evaluation of an open cut mine. These are:1. design of the optimu,m ultimate pit, and selectionof the optimum mill capacity,2. development of produ

    Jan 1, 1970

  • CIM
    An Overview of Optimizing Strategies for Flotation Banks

    By M. Maldonado, J. A. Finch

    "A flotation bank consists of a serial arrangement of cells. How to optimally operate a bank remains a challenge. This article reviews three strategies for optimizing bank performance: air profiling,

    Jan 1, 2012

  • SME
    Analysis And Control Of Energy Consumption In Surface Coal Mining - Preprint 09-082

    By D. Bogunovic

    The U.S. coal mining industry consumes a significant amount of energy, primarily diesel fuel and electricity. The continuous global increase in energy demand, high energy prices, and environmental iss

    Jan 1, 2009

  • DFI
    Lateral Load Testing Micropiles To Evaluate The Impact Of Threaded Joints And Casing Embedment On Short Micropiles In Shallow Rock

    By J. Brian Anderson

    Jointed micropiles were investigated to support bridge foundations where shallow rock was present. In this application, micropiles would have some amount of unsupported length, and would be subject t

    Jan 1, 2011

  • SME
    Construction Of The East Side Access Manhattan Tunnels

    By Don Hickey

    The MTA in conjunction with LIRR, are in the process of expanding one of the largest commuter railroads in the country, with over 260,000 passengers a day. The LIRR, which provides 700 passenger train

  • AUSIMM
    Pumping Machinery for Mines, with Special Reference to the Plant at the Waihi Mine, N.Z.

    THE choice of a pumping plant for the drainage of a mine is a matter of such importance that it is obvious that in a short paper it is impossible to go fully into the reasons governing the adoption of

    Jan 1, 1912

  • DFI
    Determination of Initial Stiffness of Drilled Shafts for the Analysis of Settlements under Service Loads

    By Carlos A. Prato, Federico Pinto

    "ABSTRACTThe design of drilled shafts often incorporates large factors of safety, for which settlements under service loads are highly influenced by the initial elastic stiffness. In the case of group

    Jan 1, 2014

  • AUSIMM
    Mining Subsidence in NSW - Recent Developments

    By G R. Mould

    The paper presents a general background to the subsidence research program being undertaken by the Department of Mineral Resources and Development in New South Wales. The results of the studies under

    Jan 1, 1980

  • TMS
    Arsenic Dopant Effect in Nickel Silicide Formation for NiSi/Hf-based/Si Gate Stacks

    By S. Y. Tan

    The thermal stability of fully silicided NiSi with arsenic doping on silicon was investigated. The aims of the work were to investigate the Ni silicide phase-related issues associated with arsenic dop

    Jan 1, 2010

  • AUSIMM
    The Gold Dredging Industry in New Zealand

    When the first rush of miners took place on the Molyneux River, in the Dunstan Gorge, the gold was won by means of cradling the gravel, which was shovelled from the various beaches and crevices in the

    Jan 1, 1901

  • NIOSH
    Seventy-Two Fatalities Have Occurred at Coal and Metal/Nonmetal Mining Operations Since January 2001

    This article updates the status of fatalities occurring in both coal and metal/nonmetal mines from January through December of 2001. Based on preliminary accident reports, as of December 31, 2001, sev

    Jan 1, 2002

  • ISEE
    Running a Drill Program that Supports the Mission of Blasting

    By William D. Hissem

    While much technology has been developed and brought to bear in the area of blasting applications, the foundation work required for success in the muck pile begins with the drilling program.

    Jan 1, 1997

  • AUSIMM
    Current Research on Coal Type and Depositional Environments in the Paparoa Goal Measures

    The purpose of this paper is to outline current research on the Paparoa and, at the request of conference organisers, to present a general introduction to the geology of the Greymouth Coalfield as bac

    Jan 1, 1979