CRIMM - A New Process for Production of Directly Reduced Iron with Coal-Based Rotary KilnBy Sheng-Hui X
This paper introduces a new coal-based rotary kiln process of DRI production - the CRIMM process, which is developed by Changsha Research Institute of Mining and Metallurgy in the past years. Its ma
Jan 1, 1999
-
Precious Metal Recovery Using Sluice Boxes in Alaska and CanadaBy James A. Madonna
Information gathered while studying geological parameters that govern fine gold deposition in the a1luvial environment can be applied to the technological development and selection of fine gold recove
Jan 1, 1988
-
Structure Support on Laterally Swept PilesBy Morgan L. Race, Matthew R. Glisson
"Most driven pile projects have plumbness limits from 0.25 in/ft (21 mm/m) to 0.5 in/ft (42 mm/m) to control bending stresses. For two projects, the project teams performed static load testing to eval
Jan 1, 2017
-
Development of a Vat Leach Process to Extract Gold from the Cochrane Hill Mine, Nova Scotia of Northumberland Mines LimitedBy P. D. R. Maltby
"With the narrow vein structure of Nova Scotia gold deposits, selective mining is rarely possible and mill heads will be too low (below 0.10 oz per ton of gold) to support a conventional mill of up to
Jan 1, 1984
-
Air Quality Development Affecting Western Coal Fired Power Plants? Develop a six year capital budget for future emission controls at Western Springfield Power Plant that would provide long-term operating certainty
Jan 1, 2005
-
IC 9434 - Evaluation Of Several Natural Gamma Radiation Systems-A Preliminary StudyBy G. L. Mowrey, S. D. Maksimovic
An important element of the U.S. Bureau of Mines (USBM) mining research program is the development and evaluation of reliable coal interface detection (CID) systems. Commercially available CID sensors
Jan 1, 1995
-
The Arrium IsaMill from Design through Commissioning and OptimisationBy G Anderson, M Mativenga, C Stanton, M Larson
Arrium’s magnetite concentrator has recently completed a modification program to improve the process that has been in operation in Whyalla, South Australia for the previous seven years. The magnetite
Sep 7, 2015
-
Permitting the Grey River DredgeBy E Breese
The Grey River dredge is the first large scale alluvial operation to be permitted under the Mining Act 1971 and the Water and Soil Conservation Act 1967. The experience of Grey River Gold MiningLimite
Jan 1, 1989
-
Blast Modeling with Sabrex 3.5 and Its Applications to Improve Mine ProductivityBy Stephen H. Chung
The blasting performances identified above are considered to be the most practical ones for judging the effectiveness of a design combining explosives / rock / drill pattern. In a total blast design p
Jan 1, 1994
-
1.2 McWha - Manufacture And Use Of Reference MaterialsBy Mike McWha
Drivers to increasing RM use ?Compliance issues ?Section 12 JSE Listing Rules ?Canadian NI 43-101 ?Sarbanes Oxley ?Shortage of African ore reference materials ?Poor perceptions about quality
Jan 1, 2005
-
Shaft in Rockburst Zone Cu-Ni Thierry Mine, CanadaShaft sinking through an amphibolite-granite rock mass experienced rock bursts on the shaft walls and benches. However, rock burst phenomena was exhibited only in granite, which is e1asto-brittle with
Jan 1, 1982
-
A History of Improvements at the Kemess ConcentratorBy Paul Grady, Martin Froehling, Curtis Mohns, Eliab Roman
"Since the idea of processing rock to unlock the valuable minerals inside was put into practice, efforts to improve production began. Methods have been learned that allow for operation in environments
Jan 1, 2005
-
Long Rockbolt Support at New Broken Hill Consolidated LimitedStope back conditions in the cut-and-fill stopes at New Broken Hill Consolidated Limited often deteriorate to such an extent that, because conventional rockbolts are not able to maintain safe working
Jan 1, 1974
-
Proper Tyre Management Reduces Tyre Costs (8cc3f990-94b6-4b55-8abb-8c65d8f8d45b)By Gordon DM
Tyres account for 25-30 per cent of the operating costs of large capacity haul units as used in open-cut mines.Tyre operating costs can be substantially reduced and often contained in real terms by ap
Jan 1, 1983
-
The Use of Ventilation in Control Technology to Reducing Respirable Dust Exposures at Mineral Processing OperationsBy D. E. Pollock, Andrew B. Cecala
It has long been known that ventilation is a cost-effective method to lower respirable dust concentrations in all types of mining applications. The National Institute for Occupational Safety and Heal
-
Using Ultrasonic Anemometers to Evaluate Factors Affecting Face Ventilation Effectiveness (ebe65260-4aab-4939-845f-5e7e1a1d173b)By Robert J. Timko, Charles D. Taylor, Edward D. Thimons, Tom Mal
A test system was developed for measuring airflow in the National Institute for Occupational Safety and Health (NIOSH) ventilation gallery using a three-axis ultrasonic anemometer. The gallery was us
-
A Rock Mass Rating System For Evaluating Stope Stability On The Bushveld Platinum MinesBy B. P. Watson
Several large falls of ground occur annually in the narrow, tabular stopes mined in the Bushveld Complex. These falls comprise safety risks and cause substantial production losses and compromise effor
Jan 1, 2004
-
Upgrading of aluminum dross by selective comminution and sizingBy K. J. Fair, H. W. Smith, D. R. Francis, J. M. Toguri
"Bench-scale batch milling and screening tests were carried out on secondary aluminum dross 10 produce an aluminum concentrate. To complement these tests, an analysis of a commercial plant was also pe
Jan 1, 1987
-
Tunnel Headwall Softeyes: Fiberglass Design Applications and Constructability ChallengesBy Shawna Munn, Jakub Hudler
This paper outlines the use of tunneling headwall softeyes for transit construction projects in the Greater Toronto Area (GTA) over the past decade. Due to spatial constraints, tunnel boring machines
Jan 1, 2018
-
Underground Mining at the Golden Cross MineThe modern Golden Cross mine entered the production phase in January 1992. The project is designed to produce over 100 000 oz/yr of gold and over 300 000 oz/yr of silver during a mine life of eight ye
Jan 1, 1994