Search Documents

Sort by

  • AUSIMM
    CRIMM - A New Process for Production of Directly Reduced Iron with Coal-Based Rotary Kiln

    By Sheng-Hui X

    This paper introduces a new coal-based rotary kiln process of DRI production - the CRIMM process, which is developed by Changsha Research Institute of Mining and Metallurgy in the past years. Its ma

    Jan 1, 1999

  • SME
    Precious Metal Recovery Using Sluice Boxes in Alaska and Canada

    By James A. Madonna

    Information gathered while studying geological parameters that govern fine gold deposition in the a1luvial environment can be applied to the technological development and selection of fine gold recove

    Jan 1, 1988

  • DFI
    Structure Support on Laterally Swept Piles

    By Morgan L. Race, Matthew R. Glisson

    "Most driven pile projects have plumbness limits from 0.25 in/ft (21 mm/m) to 0.5 in/ft (42 mm/m) to control bending stresses. For two projects, the project teams performed static load testing to eval

    Jan 1, 2017

  • CIM
    Development of a Vat Leach Process to Extract Gold from the Cochrane Hill Mine, Nova Scotia of Northumberland Mines Limited

    By P. D. R. Maltby

    "With the narrow vein structure of Nova Scotia gold deposits, selective mining is rarely possible and mill heads will be too low (below 0.10 oz per ton of gold) to support a conventional mill of up to

    Jan 1, 1984

  • RMCMI
    Air Quality Development Affecting Western Coal Fired Power Plants

    ? Develop a six year capital budget for future emission controls at Western Springfield Power Plant that would provide long-term operating certainty

    Jan 1, 2005

  • NIOSH
    IC 9434 - Evaluation Of Several Natural Gamma Radiation Systems-A Preliminary Study

    By G. L. Mowrey, S. D. Maksimovic

    An important element of the U.S. Bureau of Mines (USBM) mining research program is the development and evaluation of reliable coal interface detection (CID) systems. Commercially available CID sensors

    Jan 1, 1995

  • AUSIMM
    The Arrium IsaMill from Design through Commissioning and Optimisation

    By G Anderson, M Mativenga, C Stanton, M Larson

    Arrium’s magnetite concentrator has recently completed a modification program to improve the process that has been in operation in Whyalla, South Australia for the previous seven years. The magnetite

    Sep 7, 2015

  • AUSIMM
    Permitting the Grey River Dredge

    By E Breese

    The Grey River dredge is the first large scale alluvial operation to be permitted under the Mining Act 1971 and the Water and Soil Conservation Act 1967. The experience of Grey River Gold MiningLimite

    Jan 1, 1989

  • ISEE
    Blast Modeling with Sabrex 3.5 and Its Applications to Improve Mine Productivity

    By Stephen H. Chung

    The blasting performances identified above are considered to be the most practical ones for judging the effectiveness of a design combining explosives / rock / drill pattern. In a total blast design p

    Jan 1, 1994

  • SAIMM
    1.2 McWha - Manufacture And Use Of Reference Materials

    By Mike McWha

    Drivers to increasing RM use ?Compliance issues ?Section 12 JSE Listing Rules ?Canadian NI 43-101 ?Sarbanes Oxley ?Shortage of African ore reference materials ?Poor perceptions about quality

    Jan 1, 2005

  • AUSIMM
    Shaft in Rockburst Zone Cu-Ni Thierry Mine, Canada

    Shaft sinking through an amphibolite-granite rock mass experienced rock bursts on the shaft walls and benches. However, rock burst phenomena was exhibited only in granite, which is e1asto-brittle with

    Jan 1, 1982

  • CIM
    A History of Improvements at the Kemess Concentrator

    By Paul Grady, Martin Froehling, Curtis Mohns, Eliab Roman

    "Since the idea of processing rock to unlock the valuable minerals inside was put into practice, efforts to improve production began. Methods have been learned that allow for operation in environments

    Jan 1, 2005

  • AUSIMM
    Long Rockbolt Support at New Broken Hill Consolidated Limited

    Stope back conditions in the cut-and-fill stopes at New Broken Hill Consolidated Limited often deteriorate to such an extent that, because conventional rockbolts are not able to maintain safe working

    Jan 1, 1974

  • AUSIMM
    Proper Tyre Management Reduces Tyre Costs (8cc3f990-94b6-4b55-8abb-8c65d8f8d45b)

    By Gordon DM

    Tyres account for 25-30 per cent of the operating costs of large capacity haul units as used in open-cut mines.Tyre operating costs can be substantially reduced and often contained in real terms by ap

    Jan 1, 1983

  • NIOSH
    The Use of Ventilation in Control Technology to Reducing Respirable Dust Exposures at Mineral Processing Operations

    By D. E. Pollock, Andrew B. Cecala

    It has long been known that ventilation is a cost-effective method to lower respirable dust concentrations in all types of mining applications. The National Institute for Occupational Safety and Heal

  • NIOSH
    Using Ultrasonic Anemometers to Evaluate Factors Affecting Face Ventilation Effectiveness (ebe65260-4aab-4939-845f-5e7e1a1d173b)

    By Robert J. Timko, Charles D. Taylor, Edward D. Thimons, Tom Mal

    A test system was developed for measuring airflow in the National Institute for Occupational Safety and Health (NIOSH) ventilation gallery using a three-axis ultrasonic anemometer. The gallery was us

  • SAIMM
    A Rock Mass Rating System For Evaluating Stope Stability On The Bushveld Platinum Mines

    By B. P. Watson

    Several large falls of ground occur annually in the narrow, tabular stopes mined in the Bushveld Complex. These falls comprise safety risks and cause substantial production losses and compromise effor

    Jan 1, 2004

  • CIM
    Upgrading of aluminum dross by selective comminution and sizing

    By K. J. Fair, H. W. Smith, D. R. Francis, J. M. Toguri

    "Bench-scale batch milling and screening tests were carried out on secondary aluminum dross 10 produce an aluminum concentrate. To complement these tests, an analysis of a commercial plant was also pe

    Jan 1, 1987

  • DFI
    Tunnel Headwall Softeyes: Fiberglass Design Applications and Constructability Challenges

    By Shawna Munn, Jakub Hudler

    This paper outlines the use of tunneling headwall softeyes for transit construction projects in the Greater Toronto Area (GTA) over the past decade. Due to spatial constraints, tunnel boring machines

    Jan 1, 2018

  • AUSIMM
    Underground Mining at the Golden Cross Mine

    The modern Golden Cross mine entered the production phase in January 1992. The project is designed to produce over 100 000 oz/yr of gold and over 300 000 oz/yr of silver during a mine life of eight ye

    Jan 1, 1994