Search Documents

Sort by

  • AUSIMM
    Union Reefs: A Project Assessment and Development Case History

    By Giles D, Wegmann D

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • NIOSH
    RI 2332 Analytical Distillations of Tywcal Shale Oils

    By Martin J. Gavin

    The oil- shale studies of the Bureau of Mines , conducted in cooperation with the State of Colorado and the University of Utah , have for their primary purpose the determination of retorting and refin

    Mar 1, 1922

  • DFI
    The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff Wall

    By Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers

    Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM

    Jan 1, 2019

  • SME
    Multiple-Criteria Cut-Off Grade Optimization Utilizing Excel Solver

    By Clinton Birch

    The multiple-criteria decision analysis is a technique that helps to find an optimal solution by evaluating conflicting criteria. In this study, an approach to perform multiple-criteria decision analy

    Jun 25, 2023

  • SAIMM
    Recycling of oxalic acid from rare earth oxalate leach solutions, G.L. Dyer, R.E. Browner, and R.D. Alorro

    By G. L. Dyer, R. D. Alorro, R. E. Browner

    A potential new rare earth extraction process has been suggested (Lazo, et al., 2017) (Lazo, et al., 2018) based on converting the rare earth elements to solid phase rare earth oxalates in an oxalic a

    Jan 1, 2020

  • SME
    Improved R70 Method for Evaluating Heat of Wetting Effects on Low Rank Coal’s Self‑heating Process - Mining, Metallurgy & Exploration (2021)

    By Yinan Zhang, Y. Luo

    Most of the reported coal spontaneous combustion events occur in surface and underground mines where low rank coals (i.e., subbituminous and lower for this particular studies) are extracted indicating

    Sep 17, 2021

  • SME
    Importance and Sensitivity of Variables Defining the Performance of Pre-split Blasting Using Artificial Neural Networks - Mining, Metallurgy & Exploration (2021)

    By A. K. Raina

    Blast induced damage to the final wall of rockmass in any civil or engineering application is a major concern to the rock excavation engineers. There are at least four distinct techniques practised by

    May 30, 2021

  • AUSIMM
    Precipitate Flotation for the Removal of Heavy Metals and Cyanide from Metallurgical Effluents

    By CorrOa de Araujo A, Salum MJG

    The treatment of mining and metallurgical liquid effluents is becoming, everyday, a necessity felt by these industries. Physical-chemical and chemical methods for treating such effluents are general

    Jan 1, 1993

  • SME
    Effect of Roasting Temperature on the Leaching of Chalcopyrite Concentrate in Sulphuric Acid

    By Güldane Atesoglu, İsmail Atilgan

    The changes in the elemental contents and the structural properties of chalcopyrite concentrate when roasted were studied, and the main reactions contributing to the leaching process revisited. Firstl

    Aug 11, 2022

  • SME
    A Comprehensive Roof Bolter Drilling Control Algorithm for Enhancing Energy Efficiency and Reducing Respirable Dust (Mining, Metallurgy & Exploration)

    By H. Jiang, Y. Luo

    The study develops an automated, high-efficiency drilling control system to reduce respirable dust and increase energy efficiency in underground coal mines. It uses specific energy to evaluate efficie

    Feb 12, 2022

  • AUSIMM
    ‘We’re Metallurgists, not Magicians!’

    By E McLean

    The decision making check-list and hierarchy of information for process and plant design is generally wide-ranging and complex. The nature of grades, mineralisation and ore types in an ore body, its

    Aug 8, 2011

  • AUSIMM
    Controlled Blasting for Civil Construction in an Urban Environment

    By R Domotor

    Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r

    Nov 8, 2011

  • SAIMM
    The concentration of rare earth elements from coal fly ash

    By G. B. Abaka-Wood, J. Addai-Mensah, W. Skinner

    Recently, coal fly ash has become a potential candidate as a secondary resource of rare earth elements (REE). In this investigation, we studied the recovery of REE from fly ash from a commercial power

    Jan 2, 2022

  • AUSIMM
    Old Stopes and New Simulations – A Structural Modelling and Resource Estimation Case Study of the Edna May Gold Mine, Western Australia

    By P Hodkiewicz

    Recent structural interpretations based on historic stope shapes were used to develop a rapid and innovative method to domain and simulate structurally complex, high-grade gold veins at depth in the E

    Aug 22, 2011

  • SME
    Longwall Gateroad Stability Analysis Based on Field Monitoring and Bonded Block Modeling Results

    By Zoheir Khademian, Gabriel S. Esterhuizen, Morgan Sears

    Based on the 2010-2019 Mine Safety and Health Administration (MSHA) accident report database, 91% of reported ground control accident in the US longwall mines were caused by gateroad roof instability.

  • AUSIMM
    Utilisation Technologies for Australian Iron Ore in China

    By D Duan

    In this study, aimed at two kinds of ore (lump ore and iron ore fines) and four types of Australian iron ore resources (haematite iron ore, Mara Mamba iron ore, limonite iron ore, and mixed iron ore,

    Jul 11, 2011

  • AIME
    Bridgeport Paper - The Nickel Mine at Lancaster Gap. Pennsylvania, and the Pyrrhotite Deposits at Anthony's Nose, on the Hudson (see Discussion, p. 883)

    By J. F. Kemp

    The use of nickel-steel has directed increasing interest of late towards the deposits of nickel, and at the same time the parallel advance in our knowledge of the basic igneous rocks has rendered thes

    Jan 1, 1895

  • SME
    Determination Of Friction Factor For Kentucky's Coal Mines

    A knowledge of airway friction factor (K-factor) is necessary to designing mine ventilation systems for least cost and optimum effectiveness. The friction factor used must be accurate and reliable to

    Jan 1, 1991

  • ABM
    Avaliação Da Rif E Propagação Instável De Trinca A Partir De Daados Obtidos Via Ensaio De Charpy Instrumentado

    By Nelson de Freitas Costa

    Em um ensaio de impacto Charpy convencional, não é comum mensurar a energia consumida nas etapas de fratura, geralmente se obtém apenas a porção de fratura dúctil. Esse trabalho tem como objetivo apre

    Oct 30, 2017

  • ABM
    Aumento De Transferência Térmica No Molde Em Aços Ultra Baixo Carbono Pelo Ajuste Das Propriedades Físico-químicas Do Pó Fluxante

    By Alexandre de Freitas Gomes de Mendonça, Leonardo José Silva de Oliveira, Rodrigo Seara Martins, Rodrigo Madrona Dias

    No lingotamento contínuo, o pó fluxante é responsável pela formação de uma escória líquida no molde que formará um filme de escória entre a placa de cobre e a pele solidificada. As principais funções

    Oct 1, 2019