Search Documents

Sort by

  • CIM
    Toward the 24 hour large SAG Mill Reline

    By John Russell

    "Faster, safer, grinding mill relining offers the obvious attractions of reduced mill relining times with the knock-on incentive to reduce all other maintenance down-time, opening the possibility for

    Jan 1, 2008

  • NIOSH
    Nonmetal Operator Mining Facts ? 2005 - Mining Operations

    In 2005, a total of 739 nonmetal mining operations reported employment to the Mine Safety and Health Administration (MSHA). These mines (e.g., potash, gypsum, salt) comprised 5.0% of all operations.

    Jan 1, 2008

  • NIOSH
    The Status of Mine Fire Research in the United States

    By M. A. Trevits

    During the time period from 1990-2007, 1601 reportable fires occurred in the U.S. mining industry (an average of 89 fires per year). The leading causes of U.S. mine fires were flame cutting and weldin

    Jan 1, 2008

  • SME
    Increased TBM Mobility and Adaptations for Special Projects

    By Dennis Ofiara

    Several recent tunnel jobs have required special adaptations of hard rock TBMs. Some of the special job conditions are ?no blast? launch requirements, small shafts or launch pits, proximity to existin

    Jan 1, 2008

  • SME
    Simulation Assisted Performance Improvements in Iron Ore Processing Plants (4c3a19f0-0877-40d2-a6da-cdc5ac5ec399)

    By S. Ersayin

    In 1998, the Concentrator Modeling Center was established within the Coleraine Minerals Research Lab to develop models for simulation of iron ore processing plants, and to assist plant operators in im

    Jan 1, 2008

  • NIOSH
    Mining Facts ? 2006 - Mining Operations

    In 2006, 14,885 mining operations reported employment data to the Mine Safety and Health Administration (MSHA).1 Almost half (48.2%) were sand and gravel mines, followed by stone mines (30.7%), coal

    Jan 1, 2008

  • DFI
    Behavior Of Step Tapered Bored Piles In Sand Under Axial Loading

    By Nabil F. Ismael

    The axial capacity of step tapered bored piles in sand was examined by field tests at one site in Kuwait. Two straight piles, and two step tapered piles were load tested in compression to failure. Al

    Jan 1, 2008

  • SME
    Regulatory Toxicology And Pharmacology - Rapporteur?s Report - Session II: Characterization Of Fibrous Minerals

    The central question concerning the health risks associated with mining and processing of taconite ores in the Eastern Mesabi Range is ??does asbestos, of any variety, occur within the gangue mineral

    Jan 1, 2008

  • NIOSH
    Monitoring and removal of CO in blasting operations

    By Marcia L. Harris

    Toxic fumes produced by detonating explosives in surface mining and construction operations pose potential hazards to workers and the public. Blasting operations produce both toxic and nontoxic gaseou

    Jan 1, 2008

  • SME
    Investigation and Cement Grouting of Big Creek Tunnel 2: A Leaking Historic Hydroelectric Tunnel

    By David Van Horsen

    Big Creek Tunnel 2, constructed in 1912, is located in the Sierra Nevada Mountains of California, east of Fresno. It is horseshoe and circular shaped with a 3.6m (12ft) diameter and extends 6.6km (4.1

    Jan 1, 2008

  • TMS
    Effects of Silicon, Iron, and Chromium on the Response of Aluminum Alloy 3004 Ingots to Homogenization

    By P. N. Anyalebechi

    The effects of Si (0.19-0.52 wI. %), Fe (0.20 wI. %-0.44 wI. %), and Cr (0-0.10 wI.%) on the response of ingots of aluminum alloy 3004 solidified at different rates (O.IO°C/s to 30°C/s), to homogeniza

    Jan 1, 2008

  • SAIMM
    Autorock Rigs For Rockbolting In Narrow Reef Stopes - Introduction

    By Frank Johnson

    Between 2000 and 2006, platinum production from the South African mines expanded from 206 to 307 tonnes (DME, 2007). Most of this additional metal has come from traditional ?narrow? reef stoping, gene

    Jan 1, 2008

  • AUSIMM
    Design and Construction of Tunnels for Northern Gateway Project, New Zealand

    By M Behrens, A McPhee, B D. Hegan

    This paper describes the design and construction of twin 400 m long road tunnels as part of the Northern Motorway Extension Project in Auckland, New Zealand. Construction of the tunnel civil works is

    Jan 1, 2008

  • SME
    Excavating New York?s East Side Access Project

    By Desiree Willis

    One of New York City?s largest subway projects is under way 43 m (140 ft) beneath the surface of downtown Manhattan. The East Side Access project, more than 30 years in the making, was halted after a

    Jan 1, 2008

  • SME-ICGCM
    Evaluation of a Multiple Seam Interaction Coal Pillar Bump

    By Michael Gauna

    An evaluation and analysis of a coal pillar bump in a West Virginia mine indicated that the pillar bump occurred because of the unique combination of controlling factors. The pillar?s development sta

    Jan 1, 2008

  • SME
    Surface and Hybrid Mining: Aqueous Extraction Methods

    By W. J. Schitt

    Section 15 covers a loose collection of topics that involve water in some way. The chapters in this section include Dredge and Placer Mining (Chapter 15.1), Solution Mining: Surface Techniques (Chapte

    Jan 1, 2008

  • SME
    A Snapshot Of Noise And Worker Exposures In Sand & Gravel Operations

    By E. R. Bauer

    Previous studies and research efforts have shown that noise-induced hearing loss (NIHL) is a problem in the U.S. mining industry. This is especially true in surface and underground coal and stone min

    Jan 1, 2008

  • SME
    Copper Mining Industry In Arizona Is Expanding

    ME?s Arizona Conference was held at the Hilton El Conquistador resort in Tucson on Dec. 2 and 3, 2007. The annual conference is organized by the Arizona Conference Board of Directors, which represents

    Jan 1, 2008

  • SME
    Design of the University Link Tunnels and Stations

    By Daniel N. Adams

    The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter

    Jan 1, 2008

  • ISEE
    A Model to Predict Peak Particle Velocity for Near-field Blast Vibration - Based on Dominant Charge, Waveform Broadening, Delay Time Modeling, and Non-Linear Charge Weight Superposition

    By Scott Scovira, Ruilin Yang

    This paper presents a non-waveform blast vibration model for the near-fi eld. The model uses the concept of a dominant charge augmented by other contributing charges estimated using a scaled time wind

    Jan 1, 2008