Search Documents

Sort by

  • CIM
    Effect of Backfill Placement Method on Its Stability: A Dynamic Modelling Case Study

    By Muhammad Zaka Emad

    Cemented rockfill (CRF) is a mixture of rock aggregate and binder slurry. It is a stiff backfill, it is fast curing, its operation is simple, placement rate is reasonably high and no drainage is requi

    Jun 1, 2012

  • AUSIMM
    Evolution of In-Seam Drilling for Gas Drainage

    By F Hungerford

    "In-seam drilling has been undertaken for the past 30 years for gas drainage to reduce the risk ofoutburst and lower the concentrations of seam gas in the underground ventilation. The drillingpractice

    Jun 1, 2012

  • CIM
    Geomechanical Response to CO2 Injection for the Heartland Area Redwater Project (HARP), Alberta

    By Hamidreza Soltanzadeh

    The injection of CO2 into a reservoir or aquifer can potentially result in deformation, induced fracturing and fault reactivation in the injection zone and/or the rocks that surround it. This paper re

    Jun 1, 2012

  • CIM
    Numerical Simulation of Accumulated Damage in Critical Mine Infrastructure and Prediction of Further Damage Over Mine Life

    By Kathy S. Kalenchuk

    Damages have been observed in shafts, backfill infrastructure and the slick line at the Leeville Mine. Shaft damage (shearing and spalling of the concrete liner) is attributed to mine-induced rock mas

    Jun 1, 2012

  • CIM
    Combining Sources of Rock Mass Characterization Data for Stope Design

    By Karina Forster

    Open stope design depends on the ore body geometry, loading conditions and rock mass properties to estimate stope dilution and ground support requirements. Rock mass conditions for design primarily re

    Jun 1, 2012

  • AUSIMM
    The Design and Installation of a Booster Fan at Tahmoor Colliery

    By M Ogle

    "Booster fans are relatively rare in Australian coal mines. However, as mines become progressivelydeeper it is likely that such fans will be increasingly adopted as a method to sustain or improve the

    Jun 1, 2012

  • CIM
    Microseismic Imaging and Hydrofracture Numerical Simulations

    By Will S. Pettitt

    Fracture Network Engineering (FNE) is the engineering design of rock mass disturbance through the use of advanced techniques to model fractured rock masses numerically, and then correlate field observ

    Jun 1, 2012

  • IIMP
    Planeamiento de minado subterráneo aplicando software minero

    By Ciro Manolo Alegre Huamán

    El presente texto describe la metodología para el desarrollo del planeamiento de minado subterráneo a través del software minero y de técnicas matemáticas modernas. Así también es importante la base d

    Jun 1, 2012

  • AUSIMM
    Ventilation Surveys and Model Building - A ConsultantÆs Opinion

    By J Rowland

    "This paper was primarily put together in order to demonstrate what are believed to be acceptablestandards, in relation to ventilation surveys and the subsequent model assembly process. Thiswas brough

    Jun 1, 2012

  • CIM
    Passive Seismic Tomography for Imaging Horizontal Stress Concentration at the Mine Scale

    By Erik C. Westman

    Knowledge of the orientation and relative magnitude of in-situ stresses at the mine scale is important for safe and efficient production from an underground mine. With this knowledge, stope location a

    Jun 1, 2012

  • CIM
    Effect of Mining on Deformation Patterns in a Large Open Pit Rock Slope

    By A. K. Alzo?ubi

    Block toppling in natural rock slopes has been under investigation since the 1970?s. De Freitas and Watters (1973) introduced the term ?toppling? to describe the movements of rock slopes by rotation i

    Jun 1, 2012

  • CIM
    Anisotropy Measurements in a Core Sample by Using Pulse Transmission Method

    By Jaime Meléndez Martínez

    Recent interest in unconventional reservoirs motivates our work in laboratory measurements of seismic anisotropy. Seismic anisotropy is the variation in speed of a wave as a function of its direction

    Jun 1, 2012

  • CIM
    The Effect of Weak Layers on Pillar Performance in South African Chrome and Platinum Mines

    By Gregory C. More O'Ferrall

    Generally pillars in the Southern African hard rock tabular underground mining environment are designed using either empirical pillar design formulae or numerical modelling (analytical) methods utiliz

    Jun 1, 2012

  • AUSIMM
    Exploration Value Drivers and Methodologies

    By P Guj, J A. Bell

    The valuation of early-stage exploration projects requires a valuer to take into account a large number of uncertain value drivers, the interplay among which may be non-linear. This paper examines som

    May 24, 2012

  • AUSIMM
    Decision Support for an Underground Gold Mining Operation - A Case Study using the Schedule Optimisation Tool

    By B Maybee, L Fava, D Millar

    In the context of a case study for an underground gold mine, the value generated by a schedule optimisation tool (SOT) is assessed. SOT is a software tool for underground mine planning that maximises

    May 24, 2012

  • AUSIMM
    Strategic Optimisation at Sierra Rutile - A Case Study in Maximising Project Value

    By P Myers, T Elkington, S Wonday

    Sierra Rutile LimitedÆs (SRL) heavy mineral sand mining operation in Sierra Leone, West Africa, is embarking on a new phase of its life. After confronting many challenges during the 1990s and 2000s, S

    May 24, 2012

  • AUSIMM
    Uncertainty - An Important Source of (Additional) Value for Mine Projects

    By S Watson, L Martinez

    Mine projects are complex opportunities that demand a constant assessment of uncertainty, ie risk and upside potential. This is because the value of a mine project is typically influenced by many unde

    May 24, 2012

  • AUSIMM
    Mine Project Risk Management

    Risk management has become an essential tool for mining companies to ensure their projects are well-managed and profit expectations are achieved. Risk management has also become a mandatory corporate

    May 24, 2012

  • AUSIMM
    Real Option Value Optimisation

    By J Gould, T Elkington

    Mine operation strategies are commonly optimised with a net present value (NPV) maximisation objective. There are well known properties of a typical mining project optimised for NPV, including high pr

    May 24, 2012

  • AUSIMM
    Now, this is the Time for Mining Companies to Choose - Real Option Valuation or Discount Cash Flow

    By S Shafiee, N Abbate

    The evaluation of mining projects requires a methodology that will give flexibility and manage the existing uncertainty within the projects. The discount cash flow (DCF) and other traditional evaluati

    May 24, 2012