Search Documents

Sort by

  • AUSIMM
    A Review of the Applications of Tunnel Boring Machines in Mines

    By Q Gong, J Li, J Zhao, Y Zheng

    Excavation by tunnel boring machines (TBMs) offers many advantages over conventional excavation methods, in terms of safety level, working environment, advance rate and overall cost. While TBMs have b

    Sep 17, 2014

  • AUSIMM
    Initial Thoughts on Application of the Volume Loss Approach for Estimates of Surface Settlement Due to Tunnelling in Weathered Rock

    By S Kowalczuk, S V. L Barrett

    The potential for adverse surface settlement during tunnelling in soil and rock poses a significant risk to the successful completion of any tunnelling project. Undesirable ground movement may lead to

    Sep 17, 2014

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • AUSIMM
    The Measurement of Rock Stress for Tunnelling

    By I Gray

    While in some cases it is vitally important to measure the virgin stress in rock prior to tunnelling there are a number of cases where such stress measurement is really not required. The concept of ha

    Sep 17, 2014

  • AUSIMM
    The Refurbishment of the Terrace and Mt Victoria Tunnels, Wellington, New Zealand

    By T J. McGavin

    This paper examines the fire life systems implemented in two existing tunnels and discusses whether the standards used were appropriate. It focuses on the Terrace Tunnel as this upgrade and refurbishm

    Sep 17, 2014

  • AUSIMM
    Discrete Fracture Network Modelling for Tunnel Design in the Sydney Basin

    By A L. de Ambrosis, F M. Weir, M Fowler

    Traditional kinematic and statistical analyses of geological structure for geotechnical engineering applications, while considered industry standard practice, have some limitations and unrealistic ass

    Sep 17, 2014

  • AUSIMM
    Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?Process

    By T Ireland, S Eratne, W Newns, P Spies

    The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest

    Sep 17, 2014

  • AUSIMM
    Safety in Underground Railway Stations – An Example of the Interplay between Testing and 3D Computational Fluid Dynamics Simulation

    By R Stosch, D Lohberger, J Rodler, E Schnell and A Bassler, H Ramseier

    In the last two decades three-dimensional (3D) computational fluid dynamics (CFD) simulations have become an important tool in engineering sciences. More recently, the safety requirements in undergrou

    Sep 17, 2014

  • AUSIMM
    The Impact of Pile Loading on Adjacent Metro Tunnels – Barangaroo South, Australia

    By P K. Wong, D A. F Oliveira, F M. Azad

    In situations where foundation piles are located in proximity to existing or future tunnels, it is typical for the tunnel owner to require that sleeving of the piles be carried out to at least the inv

    Sep 17, 2014

  • AUSIMM
    Underground Extension of the FGC Line in Sabadell through Cemented Soils

    By R Justa Cámara, J María Bertrán Llop

    "The need for suitable geotechnical characterisation of the rock mass for underground construction is evident. The enlargement project of Railways of the Generalitat of Catalunya (FGC) in Sabadell is

    Sep 17, 2014

  • AUSIMM
    Estimation of Rock Load for Tunnels with Different Disturbance Factors

    By J Rostami, T Afshar, M Sharifzadeh

    Accurate estimation of rock load and selection of types of ground reinforcement to match post-failure behaviour of rock mass are important issues to assure tunnel stability. This paper focuses on the

    Sep 17, 2014

  • AUSIMM
    High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, Philippines

    By C Harrison, A Bowskill

    The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to

    Sep 17, 2014

  • AUSIMM
    A New Method for Rapid Vertical Development of Underground Ventilation Shafts

    By R Markoski, P Grealish

    The requirement for rapid vertical development for underground ventilation is often a factor when dealing with dynamic mine plans, with short vertical developments being used to optimise ventilation s

    Sep 17, 2014

  • AUSIMM
    Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground Conditions

    By M Norbert, D O’Connor

    The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set

    Sep 17, 2014

  • AUSIMM
    Use of ?Tunnel Boring Machines in the Mine Environment

    By D Mather, H R. Asche

    "In the civil tunnelling field, the use of tunnel boring machines (TBM) has now overtaken the use of conventional excavation methods (drill and blast / roadheader). This is due to a number of reasons,

    Sep 17, 2014

  • AUSIMM
    Design and Construction for the Widening of the M2 Norfolk Twin Tunnels

    By A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys

    The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o

    Sep 17, 2014

  • AUSIMM
    Two Transit Levels in One Tunnel Tube – An Innovation in Barcelona Metro Line 9

    By R Justa Cámara, L M. Pinillos Lorenzana

    Barcelona Metro Line 9 (Line 9) is an essential infrastructure, improving the transversal transport in Barcelona by connecting the greater part of the currently existing radial lines. The purpose of L

    Sep 17, 2014

  • AUSIMM
    A Case History of a Deep Excavation in a Big Circular Shaft in Singapore Marine Clay

    By H Zhang, A Lawrence

    To accommodate the fast growing need for services in Singapore’s Marina Bay downtown area, Marina South, the construction of a common services tunnel (CST) was required. The CST includes various servi

    Sep 17, 2014

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    The Waterview Connection Project – Progress to Date

    By S Hanke, J Burden, P Spies

    The Waterview Connection will complete Auckland’s long-planned Western Ring Route, a 48 km north-south motorway alternative to State Highway 1 that bypasses the central city to the west. The project i

    Sep 17, 2014