Search Documents

Sort by

  • AUSIMM
    Sensor-based Real-time Resource Model Reconciliation for Improved Mine Production Control – A Conceptual Framework

    By M W. N Buxton, M S. Shishvan, J Benndorf

    The flow of information, and consequently the decision-making along the chain of mining from exploration to beneficiation, typically occurs in a discontinuous fashion over long timespans. In addition,

    Nov 24, 2014

  • AUSIMM
    Applying Modern Heuristics to Maximising Net Present Value through Cut-off Grade Optimisation

    By C A. Myburgh, S Craig, K Deb

    In focusing on open pit mine scheduling, one of the biggest areas that a mining engineer can add value is in the area of cut-off grade optimisation. It is not atypical to add up to an extra 20 per cen

    Nov 24, 2014

  • AUSIMM
    Aligning Resource Estimates with Mine Planning

    By D Kentwell

    A resource model serves two main purposes depending on the stage of a project. The first is to provide an early indication of likely tonnages and grades at certain cut-offs so that decisions can be ma

    Nov 24, 2014

  • AUSIMM
    Multivariate Block Simulations of a Lateritic-type Nickel Deposit and Post-processing of a Representative Subset

    By J Deraisme, P Epinoux, O Bertoli

    "Société le Nickel exploits the Dôme lateritic nickel orebody at its Tiébaghi operations in New Caledonia. The site geology has an obvious bearing on recovery and metallurgical performance, with contr

    Nov 24, 2014

  • AUSIMM
    Production Schedule Optimisation – Meeting Targets by Hedging against Geological Risk while Addressing Environmental and Equipment Concerns

    By M Spleit

    A long-term production schedule for the LabMag iron ore deposit in northern Quebec, Canada is derived using stochastic integer programming. The optimisation formulation maximises the schedule’s net pr

    Nov 24, 2014

  • AUSIMM
    An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project

    By D J. Thobaven

    Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu

    Nov 24, 2014

  • AUSIMM
    Simulating Extraction Shapes to Understand Financial Risk Using High Performance Computing

    By E Lima, D Gregory, C Faria, A Lapworth

    Open pit mine enterprises are complex systems that depend on multiple parameters such as mineral grade distribution, geotechnical characteristics, economic conditions and engineering requirements, all

    Nov 24, 2014

  • AUSIMM
    Approaches to the Simulation of Compositional Data – A Nickel-Laterite Comparative Case Study

    By K G. van den Boogaart, U Mueller

    "An accurate prediction of benefit for some types of ore may require not just the ore grade, but a whole compositional characterisation of the estimates; that is, its full mineral composition includin

    Nov 24, 2014

  • AUSIMM
    Capital Expenditure Modelling for Strategic Mine Scheduling

    By L Blackwell

    Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea

    Nov 24, 2014

  • AUSIMM
    Simulation Optimisation of Mine Operational Plans

    By H Askari-Nasab, E Torkamani, M M. Badiozamani, S P. Upadhyay, M Tabesh

    "Decision-making in mining is a challenging task. Optimal decisions regarding shovel and truck allocations, aligned with the optimal short-term production schedules, are crucial in keeping the operati

    Nov 24, 2014

  • AUSIMM
    On the Joint Multipoint Simulation of Discrete and Continuous Geometallurgical Parameters

    By K G. van den Boogaart, M Lehmann, U Mueller

    Geometallurgical parameters are descriptions of the mineralogy and microstructure of the ore determining its mineralogical and microstructural characteristics. From a conditional geostatistical simula

    Nov 24, 2014

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models

    By M Astorga, J Jackson, J Gaunt

    The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w

    Nov 24, 2014

  • AUSIMM
    A Non-destructive Testing Method for Measuring Bolt Condition

    By B Jones, M Chappell

    Installing ground support correctly is not an easy task, whether lack of operator training, poor ground conditions or underperforming equipment. Confirming the quality of installation can help with pl

    Nov 5, 2014

  • AUSIMM
    Application of Design by Measurement for Support and Pillar Design in Mechanised Room and Pillar Coal Mining in India

    By I D. Gregson, A Gandhe, A S. Garcia, K M. MacAndrew

    "Falls of ground still cause around one-third of all underground mining fatalities. The recent introduction of mechanised room and pillar working into Indian coalmines is an example of the application

    Nov 5, 2014

  • AUSIMM
    Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network Approach

    By F M. Weir, M Fowler

    The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc

    Nov 5, 2014

  • AUSIMM
    Comparison of Field Estimated Strengths

    By A Duran

    When dealing with rocks in the geotechnical profession, a common activity involves providing an estimate of the intact strength. The tactile approach and descriptions of strength that apply to soils i

    Nov 5, 2014

  • AUSIMM
    Prediction of Roof Collapse for Rectangular Underground Openings

    By A M. Suchowerska, J P. Carter, J P. Hambleton

    "In order to effectively predict the roof collapse of underground openings using continuum models, it is imperative that a realistic failure criterion is used to represent the rock mass. However, for

    Nov 5, 2014

  • AUSIMM
    Coalmine Pillar Design and Performance during Mechanised Pillar Extraction in India

    By I D. Gregson, A S. Garcia, K M. MacAndrew

    The design work undertaken by Rock Mechanics Technology (now part of Golder Associates (Golder)) has played a major part in successfully establishing mechanised room and pillar working in Indian coalm

    Nov 5, 2014

  • AUSIMM
    Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, Australia

    By T J. Sullivan, H Pinkster, G Swarbrick

    From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o

    Nov 5, 2014