Search Documents

Sort by

  • SME
    Evaluating Tailgate Spray Manifolds to Reduce Dust Exposures for Shearer Face Personnel

    By G. J. Joy, J. P. Rider

    "Technical advances in longwall mining over the last several years have resulted in much larger and faster shearers that have the capability of mining at speeds over 100 ft./min. This has resulted in

    Jan 1, 2015

  • CIM
    Initiation Versus Breakdown Pressure of Transverse Radial Hydraulic Fracture: Theory and Experiments

    By J. Desroches, J. Burghardt, B. Lecampion, A. P. Bunger

    "We present detailed comparisons between theoretical predictions and experiments for the initiation of radial hydraulic fractures transverse to a wellbore. Most of these experiments provide a measure

    Jan 1, 2015

  • SAIMM
    Visions for challenging assets in the South African coal sector

    By Z. van Zyl

    The southern African coal industry is facing the reality that coal reserves are becoming deeper and harder to mine than before. Alternative visions need to be considered to offset the impact of these

    Jan 1, 2015

  • CIM
    Study of Oxygen Flash Smelting of Nickel/Copper Concentrates

    By Jin Liu, Torstein A. Utigard

    At its Copper Cliff Smelter, Vale Inco Limited processes a bulk copper-nickel concentrate in two Inco oxygen flash furnaces. Coke supplies a minor proportion of the process heat requirements, limitin

    Jan 1, 2015

  • SAIMM
    Presidential Address: Truth and Error in Scientific Publishing

    By R. T. Jones

    "SynopsisScientific progress relies on the publication of ideas and experimental results that can be replicated, tested, and improved over time. The first printed book on metallurgy to have been publi

    Jan 1, 2015

  • SME
    A New Electrolytic Alternative to Chemical Neutralization

    By P. James

    "INTRODUCTION Control of target stream pH is very important in leach mining and treatment of MIW (mining influenced water). On the production side, solution acidity can impact SX (solvent extraction)

    Jan 1, 2015

  • ISEE
    Reduction in Total Blasting Cost of Mine Using Electronic Detonators

    By Narendra Gupta, Gaurav Srivastava, Abhinav Sharma

    From the days when plain detonators and safety fuse were used for initiation of commercial explosives, the commercial blasting and mining industries have made rapid strides. With the advent of electro

    Jan 1, 2015

  • CIM
    Temperature Field in the Exploration Area of the Gorleben Site – Geothermal Borehole Logging and Numerical Model Calculations

    By S. Fahland, P. Vogel

    "The Gorleben salt dome has been investigated since 1979 for its suitability as a repository for the disposal of high-level radioactive wastes. The geoscientific surface exploration was followed by un

    Jan 1, 2015

  • CIM
    Experimental Investigation on Anisotropic Characteristics of Boreyong Shale in Korea

    By Ki-Bok Min, Seokwon Jeon, Seung-Beum Choi, Taehyun Kim

    "In order to investigate anisotropic characteristics of Boryeong shale in Korea, which clearly shows transverse isotropy, a series of experimental tests were carried out. Using Brazilian test, five el

    Jan 1, 2015

  • SME
    Air Cleaning Performance of a New Environmentally Controlled Primary Crusher Operator Booth

    By B. Holen, J. R. Baregi, J. A. Organiscak, A. B. Cecala

    The National Institute for Occupational Safety and Health (NIOSH) cooperated with 3M Company in the design and testing of a new environmentally controlled primary crusher operator booth at the company

    Jan 1, 2015

  • CIM
    Fracture Behavior Evaluation of High Strength Al7050 Alloy at Room and Elevated Temperatures Using Notched Specimens

    By K. Purazrang, P. Musavi Garavi, P. Sh. Naseri, P. Abachi

    The fracture behavior of high strength Al7050 alloy was investigated at room and elevated temperatures using small size, V-notched tear (called Kahn specimen) and compact tension, CT, specimens, respe

    Jan 1, 2015

  • SME
    Micro-Price Optimization: An Industrial Case Study for Coal-Fired Utilities

    By F. Stanley, A. Noble, G. Luttrell

    "The supply chain for coal-fired power stations involve a multi-stage network of mining units, preparation plants, blending facilities and transportation systems. Attempts to optimize the supply chain

    Jan 1, 2015

  • SAIMM
    A critical evaluation of the waterreticulation system at Vlaklaagte Shaft, Goedehoop Colliery

    By R. Lombard

    "Water is a very important component in the production process at underground coal mines. Current unfavourable economic conditions have forced the coal mining industry to identify and address every po

    Jan 1, 2015

  • SME-ICGCM
    Numerical Simulation of Overburden and Surface Movements for Wongawilli Strip Pillar Mining

    By Guo Wenbing

    "INTRODUCTIONThere is a great amount of coal (about 140 billions tons) left unmined under the surface structures, water bodies, railways (referred to as the “three-body”). Coal mining under “threebody

    Jan 1, 2015

  • SAIMM
    The recovery of platinum group metals from low-grade concentrates to an iron alloy using silicon carbide as reductant

    By G. A. Bezuidenhout, S. Bradshaw, W. Malan

    "The purpose of the study was to investigate the feasibility of SiC reduction of low-grade concentrates from Lonmin’s Rowland and Easterns operations with respect to metal fall and PGM recovery. These

    Jan 1, 2015

  • CIM
    Modeling the Post-Peak Strength Degradation on Tunnel Stability

    By F. Y. Hsiao, H. C. Kao

    Underground excavation in hard rock is normally stable at shallow depth except for wedge failure. However, the excavation depth is rapidly increasing recently. In high overburden stress condition, the

    Jan 1, 2015

  • DFI
    The Use of Thermal Integrity Profiling (TIP) to Verify the Integrity of Deep Foundations

    By Beim Jorge, Piscsalko George

    "Verifying the quality of cast-in-place foundation applications, particularly those cast under slurry, is of course important, due to its great dependency on the methodology employed and on the practi

    Jan 1, 2015

  • SAIMM
    Integration of imprecise and biased data into mineral resource estimates

    By E. Machaka, A. Cornah

    "Mineral resources are typically informed by multiple data sources of varying reliability throughout a mining project life cycle. Abundant data which are imprecise or biased or both (‘secondary data’)

    Jan 1, 2015

  • CIM
    Post-Pillar Design for Overhand Cut and Fill Mining in Moderate to High Stress Conditions – A Case Study

    By M. Yao, D. Thibodeau

    "Selective mining, such as post pillar cut and fill, is used in large, flat, irregularly shaped ore bodies where ground stability is to be maintained. This selective mining is used to open the stope t

    Jan 1, 2015

  • CIM
    Best Energy Management Practices for Electric Furnace Steelmaking

    By D. J. Zuliani

    A mass and energy balance for a modern electric arc furnace ("EAF") indicates that about 70% of the process energy losses are contained in the off-gas as chemical energy in the form of uncombusted CO

    Jan 1, 2015