Search Documents

Sort by

  • SAIMM
    Value Creation in a Mine Operating With Open Stoping Mining Methods

    By P. J. Le Roux

    "Mining companies are under constant pressure to reduce their cost structures to sustain profitability. In mines using an open stoping mining method, dilution often has a significant effect on profita

    Jan 1, 2017

  • SME
    Application of Taguchi’s Method to Uncertainty Assessment and Sensitivity Analysis for Mineral Processing Circuits

    By S. H. Amini, A. Noble

    "While many classic mineral processing circuit design approaches rely on deterministic methods, numerous studies have shown that the uncertainty inherent to the various input parameters can significan

    Jan 1, 2017

  • DFI
    Structure Support on Laterally Swept Piles

    By Morgan L. Race, Matthew R. Glisson

    "Most driven pile projects have plumbness limits from 0.25 in/ft (21 mm/m) to 0.5 in/ft (42 mm/m) to control bending stresses. For two projects, the project teams performed static load testing to eval

    Jan 1, 2017

  • CIM
    Operating experience and developments of G-REX and AuRIX®100 resin exchange technology

    By N. Katsikaros, A. Lewis-Gray, P. Richards

    "To optimize gold recovery in complex leach-to-electrowinning processes, Gekko Systems developed the Gekko resin exchange column (G-REX) as an intermediate step, using a highly gold-selective resin to

    Jan 1, 2017

  • SME-ICGCM
    Development Process for a Greater Capacity Propsetter® System

    By Christopher J. Brown

    "Proper ground stability in gate roads has been a critical aspect of success in longwall mining. In particular, the tailgate has proven to be one of the more active mine areas that needs to be managed

    Jan 1, 2017

  • DFI
    Evaluating Efficiency of Geo5 in the Analysis of Pile Foundation

    By Elizabeth Varghese, Sanket Rawat, Prachuryya Kaushik, Ravi Kant Mittal

    "Geo5 Software is gaining popularity worldwide due to its expediency in analysis and design of pile foundation. The analysis is based on various theoretical, empirical and semi-empirical methods avail

    Jan 1, 2017

  • SME
    Holden Mine — Application of Jet Grouting to Improve Stability of a Tailings Embankment in a Narrow Mountain Valley

    By P. Crouse, J. Obermeyer

    "INTRODUCTION Site location and history The Holden Mine is a former underground copper mine that was developed and operated by the Howe Sound Mining Company (Howe Sound) from 1938 to 1957. The mine is

    Jan 1, 2017

  • DFI
    East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)

    By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan

    "As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed

    Jan 1, 2017

  • CIM
    Comminution Circuit Design Considerations (49th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 17-19, 2017)

    By S. Rivard

    "This paper demonstrates the selection of grinding circuit technology for a number of recent projects including discussion of the key drivers and the role of energy efficiency. Decreasing head grades

    Jan 1, 2017

  • DFI
    Alameda Corridor-East: San Gabriel Trench Project

    By David Peterson, Terry Tucker, Rafael Serrano

    "The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin

    Jan 1, 2017

  • DFI
    Case History: Large Diameter Micropiles for the Highway 53 Relocation Project

    By Nathan W. Iverson, David S. Graham, Paul J. Axtell

    "The Highway 53 relocation project in Virginia, Minnesota, involves construction of a very tall bridge across a currently inactive iron ore mine pit. The inactive pit is partially flooded and serves a

    Jan 1, 2017

  • DFI
    Analytical Expression for Plastic Hinge Length in Extended Pile-shafts

    By M. Hesham El Naggar, Mehdi Heidari

    "Equivalent fixed-base cantilever model is a common approach for performance base seismic design of bridge structures supported by extended pile-shaft. In this method, global displacement ductility fa

    Jan 1, 2017

  • DFI
    Baum Station – A New Pile Driving and Drilling Navigation System

    By Dzianis Proshchanka, Yoshi Izumi, Koji Mitani, Ayuna Kitaura

    "A new pile driving and drilling navigation system has been developed. It utilizes the commonly used surveying total station, combined with an innovative reticle. Conventional crosshairs have been rep

    Jan 1, 2017

  • DFI
    Interpretation of Seismic Response Data from Full Scale Helical Pile Tests

    By A. B. Cerato, M. K. ElSawy, A. Elgamal

    "Helical piles are gaining popularity as foundations for new construction as well as retrofitting option for deficient foundations. More recently, large diameter helical piles are used to support stru

    Jan 1, 2017

  • DFI
    Driving and Extraction of Steel Pipe Piles in Nearshore Environment

    By Jim Rix, Ken Been, Nihal Bohra, Anthony Rice, Juan Lopez

    "A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the br

    Jan 1, 2017

  • CIM
    Agnico Eagle Laronde Plant: Metallurgical Challenges Present and Future (CIM Journal | Vol. 8, No.1, 2017)

    By J. Cayouette, C. Bolduc, P. Blatter

    "The LaRonde mill was commissioned in 1988 and began treating ore from the Penna shaft in 2000. The mill has been expanded to accommodate 7,500 t/day, but ramped down to 6,000 t/day since the deep ext

    Jan 1, 2017

  • DFI
    Analysis and Performance of Sheet Pile Cofferdam under Demolition Blast Loads

    By John Mould, Gordon Chen, Michael Oakland, William McElwee

    "This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn

    Jan 1, 2017

  • CIM
    Agnico Eagle LaRonde plant: Metallurgical challenges present and future

    By J. Cayouette, C. Bolduc, P. Blatter

    "The LaRonde mill was commissioned in 1988 and began treating ore from the Penna shaft in 2000. The mill has been expanded to accommodate 7,500 t/day, but ramped down to 6,000 t/day since the deep ext

    Jan 1, 2017

  • DFI
    Alternative Deep Foundation Solutions – DMM at LPV-111 in New Orleans

    By Peter Cali, Wesley Schmutzler

    "The Deep Mixing Method (DMM) was employed to raise and support the LPV (Lake Pontchartrain and Vicinity) -111 Levee in New Orleans. Even using innovative technologies, the tight schedule to achieve t

    Jan 1, 2017

  • SME
    Demonstration Campaign Results on a Cyanide-Free Process for Gold Extraction from a Refractory Pyrite Concentrate (SME Annual Meeting Feb. 19 - 22, 2017, Denver, CO)

    By . A. Drouin, J. -M. Lalancette, D. Lemieux, C. Chouinard

    "A gold bearing pyrite concentrate was treated at the demonstration scale (15 t/d) for the extraction of gold using a cyanide-free process. The pyrite was depressed in the flotation circuit in order t

    Jan 1, 2017