Multiple Seam Mining Interactions: Case Histories from the Harris No. 1 Mine (b50cab1b-ba36-4377-a652-1d452c62f433)By Frank E. Chase
The Harris No. 1 Mine, located in Boone County, WV, has been longwalling the Eagle Coalbed for over 30 years. Harris has experienced numerous interactions associated with the extensive room-and-pillar
Jan 1, 2005
-
Suitability of PEM fuel cells for underground mining vehicles (35a3b3ff-1d4d-456b-a989-2c3e85f551b7)By G. Bonnell, W. Lidkea, M. C. Bétournay, E. Edwardson
"Hydrogen fuel cells are a known technology, having been applied to stationary (e.g equipment, buildings, and power plants) and vehicle applications (e.g transit buses and space shuttles). There is cu
Jan 1, 2005
-
Assessment of Settlement Due to EPBM Tunnelling in London, UK, on CTRL Contract 240By Keith Jones, Michael Francis
Contract 240 of the Channel Tunnel Rail Link comprises construction of twin4.7 km long running tunnels through a densely populated area of East London. The tunnels were constructed by EPBM in Sands an
Jan 1, 2005
-
Work-Life Balance and Atypical Working Hours: Does FIFO Pass the Epicurean Test for Happiness?When I was first asked to give a paper on work-life balance in the mining industry I was both excited and aware of the incongruity of my position. I have never worked in mining operations nor have I h
Jan 1, 2005
-
Late Metamorphic Structural Zones in the Otago Schist: Prospective Hosts for Gold MineralisationBy M Begbie, R J. Norris, D J. MacKenzie
The Otago Schist is crossed by numerous deformation zones that formed in the latter stages of metamorphism and uplift of the metamorphic belt. These deformation zones are long (tens of km) linear feat
Jan 1, 2005
-
Edmonton South LRT Twin TunnelsBy Steve Skelhorn
Edmonton South LRT is the latest expansion of the Subway system in Edmonton, Alberta, Canada: Consisting of twin 5.8m segmental lined tunnels, 280m long, driven by a Lovat EPB machine. The key challen
Jan 1, 2005
-
The Flotation of Water-Soluble Minerals ù Peculiarities and New TechnologiesBy V Novoselov, R Sabirov
Flotation processing technology of water-soluble minerals has made it possible to realise, since the 1960s, the wide scale industrial processing of potash and potassium-magnesium ores (about 200 milli
Jan 1, 2005
-
Keynote Address at the 23rd International Conference on Ground Control in Mining, August 3-5,2004By Lewis Dr. Wade
It is really an honor and pleasure to be here at the 231d International Conference on Ground Control in Mining. My name is Lew Wade. Until recently I served as the Associate Director of Mining for NIO
Jan 1, 2005
-
A Reclamation Program to Achieve sustainable Postmining Land Uses at the Black Mesa and Kayenta MinesBy Vern Pfannenstiel
Jan 1, 2005
-
Bord And Pillar Applications On The Platinum Mine: T-Cut Mining MethodBy C. C. Oosthuizen
Paper written on project work carried out in partial fulfilment of Technikon Practical Training Frank shaft is mining both Merensky reef and UG2 reef. The Merensky orebody is almost depleted and th
Jan 1, 2005
-
Results of Self-Heating Tests of Australian Coals Conducted in a 16 m<sup>3</sup> ReactorA research and testing facility has been developed at Simtars to allow the spontaneous combustion testing of coal on a large scale. In this adiabatic reactor, the coal particle sizing is closer to tha
Jan 1, 2005
-
A Ventilation System for Large Block Cave MinesBy M Stephens, T A. Sutra
Currently, there are several open pit mines with production rates of about 200 000 tpd of ore that are reaching the end of their economic lives. In most cases, the remaining orebody extends to depths
Jan 1, 2005
-
Portland, Oregon’s Other CSO TunnelsBy Michelle Lostra, Red Blanchette, Jan Babendererde, Greg Colzani
The City of Portland’s Westside CSO Project is constructing a deep tunnel system to reduce combined sewer overflows (CSO) from entering the Willamette River. Several kilometers of microtunneled pipeli
Jan 1, 2005
-
BWARI Tunneling UnderwayBy Thomas L. Richardson, David R. Chapman, Gary W. Gilbert
The two contracts of the Big Walnut Augmentation/Rickenbacker Interceptor(BWARI) sewer project for the City of Columbus, Ohio total nearly 35,000 feet of 14and 12-foot diameter tunnel. EPB TBMs will i
Jan 1, 2005
-
Industrial Minerals 2004 – Talc and PyrophylliteBy G. P. Tomaino
Talc is a layered, hydrous magnesium silicate mineral. It has a soft, soapy feel and typically a smooth texture. Talc is also known for its insulation, heat resistance, chemical stability, oil absorpt
Jan 1, 2005
-
A Review ù Pillar Stability Issues at DOZ Block Cave MineBy D Flint, O Rindriatmoko
PT FreeportÆs Deep Ore Zone (DOZ) Mine is the latest block cave mine within the East Ertsberg Skarn System (EESS).Issues with undercutting and stress concentrations at the extraction level were experi
Jan 1, 2005
-
New Horizons in SurveyingBy Ben V. Petersen
Surveying is to tunneling, as a steering wheel is to a car—somewhat essential if you want to end up in the right place. The principles of tunnel surveying have remained unchanged since the first tunne
Jan 1, 2005
-
Continuous Monitoring of Barometric Pressure in Deep MinesBy J Krawcz, S Wasilewski, W Mironowicz
Barometric pressure and its variation in deep underground workings have a considerable effect on ventilation conditions. Pressure changes which create transient states of air flow and air parameters i
Jan 1, 2005
-
Research Methods Of Iron Ore Sinters: Improvement In Their Quality AssessmentBy Marilia S. de Magalhaes
Keywords: sinter, characterization, agglomeration, iron ore Iron ore sinters are the main burden of blast furnaces for pig iron production. The evaluation of these agglomerates is very important d
Jan 1, 2005
-
New York Subway Caverns and Crossovers—A Tale of Trials and TribulationsBy Charles Stone, Madan Naik, Drupad Desai, Karel Rossler
Planning of New York’s new subway line dictated the location of shallow underground station caverns and track crossovers. Clear span openings ranging from70 feet to 100 feet and lengths in excess of 1
Jan 1, 2005