Search Documents

Sort by

  • CIM
    Estimation of Iron Ore Resources Integrating Diamond and Percussion Drillholes

    By Jacques Deraisme

    The technology of percussion drilling is well mastered. The lower cost of percussion drilling allows more holes to be drilled for the same budget. However significant differences are often observed be

    Oct 1, 2009

  • SAIMM
    Estimation of joint behaviour by monitoring and analysis in the rock cavern

    By T. Maejima, K. Aoki, T. Mori, K. Iwano

    Concerning the excavation of rock cavern, it is one of the most important issues to evaluate the behavior of rock joints. But few detailed measurements for joint behavior had been conducted. Therefor

    Jan 1, 2003

  • CIM
    Estimation of large open pit haulage truck requirements

    By G. H. Blackwell

    Open pit mine management must ensure that sufficient trucks are available and are being used effectively for production, and that operating costs are under continued control and review for improvement

    Jan 1, 1999

  • SAIMM
    Estimation of Lateritic-Type Orebodies

    By A. G. Journel, CH. Huijbregts

    "Centre de Morphologie MathématiqueSpecial problems arise in the evaluation of lateritic-type orebodies (Ni-Co, bauxite) or, more generally, orebodies affected by surface weathering. In this type of o

    Jan 1, 2014

  • CIM
    Estimation of leakage in ventilation ducting

    By G. Auld

    "A simple method is presented whereby the additional quantity and static pressure necessary to compensate for ventilation duct leakage may be estimated using the circular reference functions of modern

    Jan 1, 2002

  • CIM
    Estimation of liberation

    By T. Yalcin

    "This paper describes the development of a mathematical model for determining the liberation of an ore at various grinding sizes, based on the combined results of microscopic counting, grinding tests,

    Jan 1, 1985

  • SME-ICGCM
    Estimation Of Long-Term Stability Of Mine Pillars In Underground Pit

    By S. Yamashita

    Recently in Japan, unexpected degradation (surface subsidence) at old underground quarry sites, such as 'Ohya-Ishi' (pumice tuff) pit field has often been occurred. At these quarry sites, th

    Jan 1, 1996

  • IOM3
    Estimation of mechanical rock properties using wireline geophysical measurements

    By L. Wade, R. Wang, M. A. Horton

    Laboratory methods to find the mechanical properties of rock are inherently biased towards stronger strata, which best survive the sample preparation process. Geophysical techniques are not subject to

    Jan 4, 1993

  • SAIMM
    Estimation Of Mineral Resources Using Grade Domains: Critical Analysis And A Suggested Methodology

    Common practice in mineral resource estimation consists of partitioning the orebody into several domains defined by grade intervals, prior to the geostatistical modelling and estimation/simulation at

    Jan 1, 2005

  • SME
    Estimation Of Model Parameters For Liberation And Size Reduction (de0f962a-a1d7-457f-8f47-7eb580e50c1d)

    By W. Z. Choi

    In our previous work, a population balance model describing the simultaneous processes of size reduction and mineral liberation has been developed. The experimental verification of this model, however

    Jan 1, 1987

  • DFI
    Estimation Of Modular Ratio And Modulus Of Deformation Of Granular Piles From In-Situ Compression Tests

    By Padmavathi V, M. Najamuddin, M. R. Madhav

    Granular piles are one of the leading ground improvement techniques, adopted for the betterment of bearing capacity and reduction in settlements of the foundations and also to accelerate consolidation

    Sep 1, 2022

  • SAIMM
    Estimation of optimum exploitation life of a bucket wheel excavator: Through the prism of dynamic programming

    By R. Zivojinovic, S. Vujic, T. Tanaskovic

    The problem of determining the optimum exploitation life of machinery, namely the optimum time for machinery and equipment replacement, represents a complex and highly responsible engineering task. Ta

    Jan 1, 2003

  • SME
    Estimation of Optimum Line of Extraction for Continuous Miner Workings and Development of Continuous Miner Stability Index (CMSI) using 3D Numerical Modeling and Statistical Approach

    By Sunil Bodakunta, Sreenivasa Rao Islavath

    The abstract highlights the importance of determining the optimum line of extraction in continuous miner workings for improved safety and productivity. The study investigates three extraction techniqu

    Apr 28, 2022

  • SAIMM
    Estimation Of Optimum Specific Energy Based On Rock Properties For Assessment Of Roadheader Performance

    By C. Balci

    Specific energy is defined as the amount of work required to break a unit volume of rock and is used to predict the performance of mechanical miners. It is obtained from full-scale rock cutting experi

    Jan 1, 2004

  • SME
    Estimation of Ore Mineralogy from Analytical Analysis of Iron Ore

    By S. Mohanan, C. R. Kumar, S. K. Bhoja, T. Venugopalan

    "A pressing issue that has often been the topic of discussion in iron-making operations in India is the high content of alumina in the country’s iron ore deposits. The presence of alumina has hampered

    Jan 1, 2015

  • NIOSH
    Estimation of Particle Size Distributions Using Pipet-Withdrawal Centrifuges

    By R. Hogg, T. H. Dumm

    "The mathematical treatments used in the evaluation of particle size distribution from pipet-withdrawal centrifuge data are reviewed. An error in the published procedure for multiple-sample withdrawal

    Mar 1, 1989

  • AIME
    Estimation of Petroleum Reserves in Prorated Limestone Fields

    By P. P. Gregory

    ESTIMATION of re- serves in prorated sand fields has been discussed by S. A. Judson, H. D. Easton, Jr., and W. A. Schaeffer, Jr., in a paper that appears in Vol. 114 (1935), of the A.I.M.E. TRANSACTIO

    Jan 1, 1935

  • AUSIMM
    Estimation of Regional Stress State and Young’s Modulus of Ground at Torigatayama Limestone Mine in Japan

    By D Fukuda, K Kaneko, R Kudo, J Kodama, Y Fujii, T Sasaki

    "Estimation of stress state as well as elastic modulus is important for the prediction of a rock slope deformation in an open pit mine since it can strongly influence the mining-induced deformation of

    Nov 5, 2014

  • AUSIMM
    Estimation of Reserves and Resources in Shear Zone Hosted Deposits

    By Yates M. G, Rowlands A. T

    Most geostatistical techniques applied to the estimation of ore reserves assume relatively unifonn grade and thickness within an ore deposit environment. In shear-hosted mineralisation this rarely occ

    Jan 1, 1991

  • CIM
    Estimation of Rock Block Strength

    By M. Pierce

    Empirical relations exist for the estimation of rock block strength at scales larger than standard core sizes. Two recently published relations account for the significant impact that microflaws (pore

    May 1, 2009