Search Documents

Sort by

  • IOM3
    Drill productivity evaluation by monitoring

    A production drill rig at a site in Sweden was equipped with a monitoring system to estimate production statistics. Drill running times, drill hole depths, penetration rate, rotation speed, thrust, ai

    Jun 19, 1905

  • CIM
    Drill Rig Navigation and Drill Plan Creation using IREDES

    By André van Wageningen

    Since the beginning of this century Boliden Mineral and Atlas Copco have worked together in stages on improving the accuracy and quality of drilling. Navigation of the drill rigs with IREDES has been

    Oct 1, 2009

  • AUSIMM
    Drill Steel Sharpening Practice at Lake View and Star Gold Mine

    The drill steel' sharpening shop, which stands adjacent to the Chaffers shaft, is built to the dimensions of 110 ft. 9 in. by 58 ft. wide, and is air conditioned in order to maintain reasonable w

    Jan 1, 1941

  • CIM
    Drill-to-Mill Increased Mill Throughput at Barrick Goldstrike from Efficient Drilling and Blasting

    By Roy McKinstry, Mark Rantapaa, Thomas Bolles

    "More efficient drilling and blasting techniques have shown measurable improvements in throughput at the Barrick Goldstrike wet grinding mill.A decrease in throughput at the autoclave, due to increasi

    Jan 1, 2004

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike

    By M. Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike (TECHNICAL PAPER)

    By R. Mckinstry, M. Rantapaa, T. Bolles

    "Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • AIME
    Drillability of Rocks in Percussive Drilling From "Energy Per Unit Volume" As Determined With a Microbit

    By A. G. Paithankar, G. B. Misra

    Although certain physical mechanical properties of rocks have been claimed to give an estimate of penetration rate in percussive drilling, the authors' work shows that the correlation of penetrat

    Jan 1, 1981

  • TMS
    Drilled and Tapped Slurry Pump Parts with Hardness in Excess of 700 HBN

    By George A. Calboreanu

    In order to overcome drilling and tapping of high hardness wear resistent material in slurry pumps, most of time mild steel inserts are mounted in the mold and after pouring they become an integrated

    Jan 1, 1996

  • DFI
    Drilled Displacement Piles - Current Practice And Design

    By Prasenjit Basu

    Drilled displacement piles are being increasingly used as foundation elements, particularly in projects requiring fast construction. Different types of drilled displacement (DD) piles are available i

    Jan 1, 2010

  • DFI
    Drilled Pier Foundation In Hard Carbonate Rock ? Synopsis

    By K. E. Darnell

    Drilled pier foundations have long been a favored foundation type for heavily loaded structures. Drilled piers derive their load-bearing capacity from end-bearing, and/or sidewall friction. This type

    Jan 1, 2010

  • DFI
    Drilled Pier Foundation with Ground Improvement Using Cement Deep Soil Mixing for Highway Bridges

    By Shahriar Vahdani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles of highway, including seven bridges, three cut-and-cover tunnels, and an undercrossing connecting the Golden Gate Bridge to the C

    Jan 1, 2014

  • DFI
    Drilled Pier Foundations In Downtown Seattle - Introduction

    By Thomas M. Gurtowski

    This paper presents a summary of allowable bearing pressures and skin friction values that have been used to design drilled pier foundations for support of high-rise structures in downtown Seattle, Wa

    Jan 1, 1990

  • DFI
    Drilled Pier Foundations In Expansive Soils ? Synopsis

    By F. H. Chen

    the Rocky Mountain Region since 1950, drilled pier foundations have been widely used to combat structural movement problems in expansive soils. It is now an accepted practice for engineers to use dri

    Jan 1, 2010

  • DFI
    Drilled Piers In Coastal Plain Deposits

    By J. Allan Tice

    In the past fifteen to twenty years, the use of drilled piers to support high capacities in coastal plain deposits has become more and more common. With improved construction techniques and better und

    Jan 1, 1988

  • DFI
    Drilled Piers In The Piedmont - Introduction

    By Stanley A. Schwartz

    In the Piedmont, heavily loaded structures are generally supported by either drilled piers or one of several pile types. The choice of drilled piers or piles is typically one of comparative costs. The

    Jan 1, 1988

  • DFI
    Drilled Piers With Base Preloading By Grouting - 1. Introduction

    By Boleslaw A. Klosinski

    Drilling of a pier hole is accompanied with stress releasing in the surrounding soil and often with loosening of soil at the pier base. In effect the drilled piers are more deformable than driven pile

    Jan 1, 1995

  • DFI
    Drilled Pile Design and Installation Challenges in an Urban Environment

    By Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran

    This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment

    Jan 1, 2018

  • DFI
    Drilled Shaft Acceptance Criteria Based Upon Thermal Integrity Profiling

    By Garland Likins, Gray Mullins, George Piscsalko

    "Quality control of drilled shafts is greatly dependent upon the practices of the site personnel. For drilled shafts cast under slurry, inspection of the hole prior to concreting is very difficult or

    Jan 1, 2016

  • SME
    Drilled Shaft Construction At Crownpoint, New Mexico

    By Hassell E. Hunter

    The Wyoming Mineral-Conoco Crownpoint Project represents the first time that big hole drilling has been exclusively used to develop totally a privately financed mine below a depth of 1000 feet. Thr

    Jan 1, 1983

  • DFI
    Drilled Shaft Design For Noise Wall Barriers Along I-20 In Columbia, SC

    By Anil Bhandari

    Using subsurface data collected at each drilled shaft location is an ideal approach for conducting drilled shaft design. However, conducting subsurface tests at each drilled shaft location and subseq

    Jan 1, 2011