Design of the University Link Tunnels and StationsBy Daniel N. Adams
The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter
Jan 1, 2008
-
Design Of Underground Openings In Competent Rock - SummaryBy Leonard Obert
THIS REPORT presents methods and principles useful in designing underground mine openings and pillars in competent rock formations. Two types of formations are considered: (1) Massive formations, in w
Jan 1, 1960
-
Design of Yield Pillars for Improved Stability of Colliery RoadwaysBy Bhattacharyya A. K
A major constraint on sustaining high rates of production in the collieries of the Southern Coalfield of New South Wales is the inability to develop panels fast enough to match the rates of extraction
Jan 1, 1995
-
Design Of Yieldable Tunnel Supports For Creeping Rocks (PRIPRINT 94-76)By N. D. Cristescu
The aim of the present paper is to show how a mathematical modeling of a creeping rock and that of an yieldable lining can allow us to obtain an optimization of the lining design and generally of the
Jan 1, 1994
-
Design Optimization - Drilled Shafts Installed In Sand, Gravel And Cobble FormationBy Emad Farouz
The resistance of very dense glacial outwash formations consisting of sand, gravel and cobble formations can be quite high, and techniques for measuring the strength and deformation properties often c
Jan 1, 2006
-
Design Optimization of Longwall Chain PillarsBy Behdeen Oraee, Amirhossein Bangian, Kazem Oraee
"Determination of the optimum design of chain pillars has a significant effect on the economics and safety of longwall operations. Most pillar design formulae are based on empirical methods and supple
Jan 1, 2010
-
Design Overview of Technogrid Conveyance Arresting System and Mounting Details in the Hermosa Headframe - SME Annual Meeting 2026By C. H. Stephenson, Z. White
This paper presents the design approach case study for incorporating a Technogrid® conveyance End-of-wind arresting system within the new South32 Hermosa headframe. Focus is placed on energy absorptio
Feb 22, 2026
-
Design Parameter For Jacked PileBy Sugie Prawono
Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr
Jan 1, 1999
-
Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery RoomsBy T. M. Barczak, S. C. Tadolini
Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery e
-
Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery RoomsBy T. M. Barczak, S. C. Tadolini
Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery en
Jan 1, 2004
-
Design Principles for Optimizing an Established Survey Slope Monitoring SystemBy N. Mphathiwa
When slope angles are designed during open pit optimization, there is a risk factor applied in steepening the slopes. The steepening of slope angles has implications for the safety and economics of th
Jan 1, 2014
-
Design Principles for Soft Ground CutterheadsBy Werner Burger
The last decade has witnessed a rapid development and application of slurry and EPB type tunnel boring machines. Both soft ground types are able to excavate tunnels in unstable ground conditions below
Jan 1, 2007
-
Design Procedure For Hydraulic Backfill Distribution SystemsA wide range of materials are used in hydraulic backfilling operations and the pipeline flow behaviour of these mixtures varies considerably. It is shown that despite the large differences in constitu
Jan 1, 2001
-
Design Review Of A Rectangular Shaft In AlluviumBy P. D. Pack, E. H. Skinner
During design of a 550-foot rectangular shaft in alluvium, lateral support within the excavation was an anticipated construction problem. Actual experience showed that the nearly 9 x 14 foot excavatio
Jan 1, 1977
-
Design Risk Mitigations for Contract CQ028 of the East Side Access ProjectBy Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso
INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p
Jan 1, 2007
-
Design Rules For Avoiding Draw Horizon Damage In Deep Level Block CavesDeep level block caving as a mining method is becoming more popular due to the fact that it is the lowest cost per ton underground extraction system. However, many block caves do not achieve their ful
Jan 1, 1999
-
Design Software for Electronic DetonatorsBy Kia Riihioja, Mike Higgins
A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh
Jan 1, 2004
-
Design Solutions for Seepage End-Around-Effects at Cutoff Wall Depth TransitionsBy Michael Hughes, Selva Selvamohan, Ray Costa
"Cutoff walls are commonly used to mitigate underseepage problems for levee remediation projects. At abrupt changes in seepage cutoff wall depths there is a potential for water to flow around the back
Jan 1, 2015
-
Design Spans ? Underhand Cut and Fill MiningBy Rimas Pakalnis
This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r
Apr 1, 2005
-
Design Strategy For Deep Slurry Stabilized Bored Piles In CompressionBy Chu E. Ho
Field load tests on deep slurry stabilized bored piles have shown that end bearing resistance was unreliable due to soft toe conditions caused by debris accumulation at the bottom of the hole during p
Jan 1, 2002