Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG MillBy Rodrigo Toro, Ivan Yutronic N
"The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s
Jan 1, 2010
-
Design and Implementation of Belt Conveyor Take-Up Safety Device Systems - SME Annual Meeting 2026By C. H. Stephenson, M. Du Preez
Overland belt conveyors often use vertically guided counterweight take-ups or horizontally tensioned carriages to maintain belt tension. In the event of belt or wire rope failure, these systems can re
Feb 22, 2026
-
Design and Implementation of Modified Mo Addition to EAF at Uddeholm AB, SwedenBy M. Nzotta, L. Teng, S. Seetharaman, A. Chychko
The objective of the present work is to optimize the EAF practice towards Mo alloying with maximum retention of the alloying element in molten steel. During Mo additions, there were significant losses
Jan 1, 2011
-
Design and Implementation of Solar‑Powered Optical Fiber‑Based Illumination and Communication System for Underground Coal Mines - Mining, Metallurgy & Exploration (2023)By Dushasan Kundu, B. N. Shivakiran Bhaktha, Khanindra Pathak, Sarbojit Mukherjee
Mine safety and quality of life of miner working in underground mines depend to a large extent on mine illumination and communication. The provisioning of reliable, safe, and cost-effective illuminati
Apr 14, 2023
-
Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River GorgeBy Brian J. Olson, Kevin Haiar
Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re
Sep 8, 2021
-
Design And Installation Of A 1818 Tonnes, 273 Meter Lift, Vertical Conveying System At White County Coal Pattiki 2 Mine, Carmi IllinoisBy S. Crewdson
Vertical hoisting of materials using hoists and skips is common in the Mining Industry. These systems have a number of drawbacks, one being limited hoisting capacity at medium depths. FKC-Lake S
Jan 1, 2003
-
Design and Installation of Gudrun Platform Jacket PilesBy Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr
"Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall
Jan 1, 2014
-
Design and Installation of Helical Piles for Support of Bridge Pier FoundationBy David L. Borusiewicz, M. Suri Surendra
"Abstract Helical piles have been used as anchors and for supporting lightly loaded structures as a method of underpinning, etc in the past. Recently, helical piles are being used to support new struc
Jan 1, 2014
-
Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter SewerBy Naresh Koirala
The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft
Jan 1, 2004
-
Design And Instrumentation Of A Large Reverberation ChamberBy Roy C. Bartholomae, Jeffrey Shawn Peterson
1. INTRODUCTION In the early 1980s, the U.S. Department of the Interior’s Bureau of Mines Pittsburgh Research Center required that a large reverberation acoustic facility be constructed. This faci
-
Design And Instrumentation Results Of A Reinforcement Concrete Piled Raft Supporting 2500 Ton Oil Storage Tank On Very Soft Alluvium DepositsBy Shaw-Shong Liew
This paper presents the design concept using floating piles to support 2500Ton oil storage tanks on a very soft alluvial clayey soil of about 40m thick in Riau Province of Sumatra, Indonesia. The floa
Jan 1, 2002
-
Design and Materials Selection of Autoclaves and Auxiliary EquipmentBy P. Cheung, J. Gulyas, R. Clary
Over the past 50 years, the use of autoclaves in the metallurgical industry has evolved from final metal recovery (hydrogen reduction) and purification (sulphide precipitate oxidation) to treating who
Jan 1, 2004
-
Design And Operating Features Of New 27.6 Mva Furnace At Nava Bharat Ventures Limited, PalonchaBy Y. Poornachandra Rao, P. C. Sudhakar, L. Malakondaiah
NBV commissioned a 27.6 MVA furnace in the year 2005. This paper explains: a)Furnace design features b)Furnace process control, Direct slag granulation c)Continuous casting, Waste heat reco
Jan 1, 2007
-
Design and Operation of a Counter Current Gas Scrubbing SystemFor many years the scrubbing of roaster gas carrying sulphur dioxide has been carried out at the plant of the Electrolytic Zinc Co. of Australasia Ltd. at Risdon, Tasmania, using long horizontal tubes
Jan 1, 1949
-
Design and Operation of a Future MillBy D. E. Pickett, J. A. Roland Faucher
"INTRODUCTIONMineral processing is undergoing growth and change at a rapid rate. The modern flotation process was discovered only in the mid-twenties, and uranium leaching in the mid-fifties. The grow
Jan 1, 1979
-
Design and operation of a laboratory packed-bed reactor and its use to study the decomposition of calcium carbonateBy A. Paulin, A. W. D. Hills
The work has shown that packed-bed behaviour can be predicted from the results of single-particle experiments, total reaction times being predicted somewhat more accurately than gas and solid temperat
Dec 1, 1971
-
Design and Operation of Backfill for Reliable High Solids Concentration DischargeBy A G McLean
This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying p
Jan 1, 1998
-
Design and Operation of Backfill Silos for Reliable High Solids Concentration DischargeThis paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying pri
Jan 1, 1998
-
Design and Operation of Gunpowder Copper Ltd's In Situ Leach-SX-EW ProcessThe Mammoth Mine is located some five kilometres from the town of Gunpowder which is approximately 120 km north-west of Mount Isa in Queensland.
Jan 1, 1993
-
Design And Operation Of Primary Grinding MillsBy A. A. Dor
Out of nine new major iron ore concentrators put in operation during the last three years, or expected to be commissioned in 1968, seven incorporate primary grinding mills and have a total design capa
Jan 11, 1968