Search Documents

Sort by

  • SME
    Design And Development Of A Mobile Mining Machine

    By G. L. Dollinger, J. P. Kindsvater, J. A. Gibson

    DESIGN AND DEVELOPMENT OF A MOBILE MINING MACHINE INTRODUCTION Until recently, developing tunnels in hard rock has been accomplished either by the drill and blast method or by using large tunnel bo

    Jan 1, 1985

  • SAIMM
    Design And Development Of A Novel Thickener Feedwell Using Computational Fluid Dynamics - Synopsis

    By T. V. Nguyen

    The feedwell performance in gravity thickeners and clarifiers relies on the efficient mixing between solid particles and flocculant to achieve effective flocculation, as well as energy dissipation of

    Jan 1, 2012

  • CIM
    Design and Development of an LHD for Narrow-Reef Mining

    By Patrick F. R. Murphy

    The mechanization of platinum group metal (PGM) underground reef mining in South Africa has posed a challenge to mining engineers for several decades. This is primarily due to the shallow dip angles a

    May 1, 2003

  • SAIMM
    Design and development of lightweight Fe- Mn alloys for storage and transportation of liquified natural gas (LNG) — Computational materials modelling study

    By J. Moema, L. Mampuru, M. Phasha, D. Mkhonto

    The global liquified natural gas (LNG) storage market size is projected to reach USD17.5 billion by 2025. Currently, owed to its high toughness, tensile strength, and excellent weldability, the 9% nic

    Mar 4, 2025

  • AUSIMM
    Design and Development of Slurry Sampling Equipment for Mount Isa On-Stream Analysis Equipment

    By Wickham P, Raeburn M. R

    The design and development of slurry sampling equipment for the Mount Isa Mines Limited on stream analysis installations is discussed in detail. Emphasis is given to the critical areas of slurry t

    Jan 1, 1976

  • SME
    Design And Development Of The Northeast Layback Of The Betze-Post Open Pit

    By Nick Rose, Robert Sharon, Mark Rantapaa

    Development of the Northeast Layback of Barrick’s Betze-Post open pit commenced in June 2000 and was successfully completed to a height of 400m (1,300 ft) in January 2003. Following a brief exploratio

    Jan 1, 2005

  • SME
    Design and Engineering during the Construction of Los Leones Station (Line 6, Santiago Subway, Chile)

    By Jaime Adasme, Héctor González, Benjamín Celada

    "INTRODUCTION Santiago de Chile is a 7 million inhabitant city which has a 103 Km long subway network operated since 1975 by Metro S.A. This network is used on a daily basis by 2.3 million people. In

    Jan 1, 2016

  • AUSIMM
    Design and Engineering of Flotation Circuits (in Australia)

    By D Mcleod, S Brindley, S Green

    The design and engineering of flotation circuits is driven by numerous inputs, including (in no particular order) testwork outcomes, site considerations, type of separation required, energy sensitivit

    Jan 1, 2005

  • NIOSH
    Design and Evaluation of a Personal Diesel Aerosol Sampler for Underground Coal Mines

    By V. A. Marple, K. L. Rubow, Y. Tao

    "A personal diesel exhaust aerosol sampler has been designed and evaluated in both laboratory and field settings. The sampler uses size selective sampling for the determination of the respirable mass

    Mar 1, 1992

  • AUSIMM
    Design and Evaluation of Dry Fill

    By Blair J. R, Barrett J. R

    In many underground mining applications where-dry fill is used, only a token acknowl- edgement of the fill properties is given. It is the aim of this paper to induce mining engineers to consider dry

    Jan 1, 1973

  • SME
    Design and Evaluation of the Roof Bolt Corrosion Test Systemin a Simulated Underground Coal Mine Environment Mining, Metallurgy and Exploration

    By Kanchan Mondal, Gopi Bylapudi, Anand Bhagwat

    Corrosion of steel roof support systems can cause potential premature failure of the support, thus adversely affecting the excavation stability and rock-related safety. An in-house corrosion test syst

  • SME-ICGCM
    Design And Experience Of Total Extraction Room And Pillar Operations Above Depleted Longwall Panels

    By Kenneth Rigsby

    Black Mountain Resources' Highlands Mine No. I is a full extraction room and pillar operation located in Harlan County, Kentucky. Black Mountain extracts the 0.9 to 1.1 meter (36- to 42-inch) thi

    Jan 1, 2003

  • DFI
    Design And Field Comparison Of Ground Improvement And Bored Piles For Large Diameter Steel Water Tanks

    By Vijaya Bhushan Rao, Ali Semercioglu, Jason Redgers

    Large diameter steel water tanks with high storage capacities impart heavy loads deep into the ground, generally requiring deep foundations to adequately support them. The use of ground improvement as

    Oct 1, 2022

  • CIM
    Design and Field Implementation of Alternate Stable Mining Geometries for Set-Up Rooms in Longwall Mining

    By Yoginder P. Chugh

    This paper discusses an ongoing field study in southern Illinois (USA) that focuses on: 1) Identifying mechanisms of instability in the set-up rooms (SR) and their T-junctions with headgate and tailga

    Aug 1, 2013

  • AUSIMM
    Design and Ground Support Monitoring of the Brunswick Street Rail Tunnels, Brisbane

    By Baxter D. A

    This paper, one of two written about the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling Conference, 1993, describes the design and monitoring aspects of the r

    Jan 1, 1993

  • SME-ICGCM
    Design And Hazard Assessment Of Mine Ore Passes

    By M. J. Beus

    This paper will describe the research approach being initiated by the Spokane Research Center to assess hazards and design criteria to prevent ground and muck falls in and around ore passes in hard-ro

    Jan 1, 1996

  • CIM
    Design and Implementation of a Brownfield Sag Pre-Crush Circuit

    By G. Castillo, G. Thies, C. Bissue

    "Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond

    Jan 1, 2013

  • SAIMM
    Design And Implementation Of A Multimodal Transportation Cost Analysis Model For Domestic Lignite Supply In Turkey ? Synopsis

    By E. Demir

    Transportation cost is the dominant cost and accounts for almost half of the total mining cost in surface mining. Therefore, determining transportation cost is critically important for the economic fe

    Jan 1, 2012

  • CIM
    Design and implementation of a process control system for column flotation

    By A. LA. Salama, D. B. Hyma

    "The Western Research Centre (WRC) of CANMET located in Devon, Alberta, is a modern research facility offering services ranging from fundamental research to pilot plant investigations. Recently, a 0.

    Jan 1, 1993

  • CIM
    Design and Implementation of a Supplemental Atomizing Spray System for Dust Control in Deep Cut Continuous Mining

    By J. Dilbeck, J. K. Ratliff, T. Petrov, Z. Brown

    "In efforts to improve dust control during deep cut continuous mining a supplemental atomizing spray system, mounted on 14CM15 continuous miner, has been designed and successfully implemented in a U.S

    Jan 1, 2019