Search Documents

Sort by

  • SME
    The Recovery Of Zinc Via Solvent Extraction Using An Organic Agent

    By Paul R. Kruesi

    A patent-applied-for process has been developed in which zinc chloride is extracted by tributyl phosphate in kerosine, and stripped with ethylene glycol or ammoniated ethylene glycol. The anhydrous zi

    Jan 1, 1984

  • IMPC
    The recycling scheme investigation of copper mineral on a kind of copper raw ore produced in China

    By Dezhou Wei, Cong Han, Shuling Gao, Wengang Liu, Yanbai Shen

    The recycling schemes of copper mineral to a copper raw ore produced in China is investigated in this paper, of which is aimed at copper concentrate‘s grade is over 26.00% and recovery is over 90.00%.

    Jan 1, 2014

  • CIM
    The Red Dog Mine

    By W. R. Hargrave

    "Mining OperationsOre will be mined by open pit techniques. Because of the high grade of the deposit and the low strip ratio, mining rates are small relative to most other open pit operations.The ore

    Jan 1, 1989

  • CIM
    The Red Dog VIP mill optimization project

    By George Hope, Brigitte Lacouture

    "The Red Dog Mine has increased mill throughput for most years since startup. Although flotation equipment has been added over the last 10 years, the Red Dog metallurgical performance has been restric

    Jan 1, 2002

  • CIM
    The Red Dog VIP Mill Optimization Project - A Study in Fast-Track Project Execution and Alliance Contracting

    By Steve W. Ciccone

    The Red Dog Mine is both the largest known zinc reserve and the largest zinc producer in the world. The mine started in 1989, and by 1999 had increased production from approximately 300,000 tonnes per

    May 1, 2002

  • CIM
    The Red Dog VIP Mill Optimization Project A Study in Fast-Track Project Execution and Alliance Contracting (5aae1f12-06e2-4656-a27b-a608072456ab)

    By George H. Hope, Steve Ciccone

    "The Red Dog Mine is both the largest known zinc reserve and the largest zinc producer in the world. The mine started in 1989, and by 1999 had increased production from approximately 300,000 tonnes pe

    Jan 1, 2003

  • CIM
    The Red Dog VIP mill optimization project. Part A: Rectifying the shortage of flotation capacity

    By George Hope, Brigitte Lacouture

    "The Red Dog mine has increased mill throughput most years since start-up. Although flotation equipment has been added over the last 10 years, the Red Dog metallurgical performance has been restricted

    Jan 1, 2003

  • CIM
    The Red Dog VIP mill optimization project. Part B: An integrated approach to modelling and design of the flotation plant

    By B. K. Gorain, A. W. Stradling

    "The traditional metallurgical scale-up techniques for flotation plants are based on lumped flotation rate constants, dimensionless hydrodynamic numbers and the use of safety factors. Once the plant h

    Jan 1, 2003

  • TMS
    The Reduction Behavior of Hematite Compacts by Hz and H2-CO Gas Mixtures

    By I. J. Moon

    The reduction behavior of hematite by H2 and H2-CO gas mixtures was investigated to elucidate the reduction mechanism at 800-950 °C. The hematite compacts were made by Cold Isostatic Pressing to produ

    Jan 1, 1997

  • TMS
    The Reduction of a Cassiterite Concentrate with Charcoal

    By R. L. Nyirenda

    An investigation of the reducibility of a cassiterite concentrate with charcoal was made in the temperature range of 1123-1373 K. The course of the reaction was monitored by a combination of sample we

    Jan 1, 1990

  • AIME
    The Reduction Of Calcium Sulphate By Carbon Monoxide And Carbon, And The Oxidation Of Calcium Sulphide.

    By H. O. Hofman

    (Canal Zone Meeting, November, 1910.) I. INTRODUCTION. IN a previous paper,1 The Behavior of Calcium Sulphate at Elevated Temperatures with Some Fluxes, we published the results of our investigati

    Nov 1, 1910

  • AUSIMM
    The Reduction of Greenhouse Gases by Combustion Catalysis

    The reduction in man's contribution to the Greenhouse effect will only be achieved by a number of small steps. Some steps will absorb carbon dioxide (CO2) from the atmosphere in slightly great

    Jan 1, 1989

  • AUSIMM
    The Reduction of Nickeliferous Laterites: Thermodynamic Considerations

    By Turnbull A. G

    Thermodynamic calculations based on the ideal system NiO - Fe203 - H2(g) - CO(g) - H2O(g) - CO2(g) show that it is not possible to selectively reduce nickel oxide in the presence of hematite because f

    Jan 1, 1980

  • CIM
    The Reduction of Pressure Gradients in Oil Pipelines

    By M. E. Charles

    The use of water flowing as a lower layer to reduce pressure gradients in petroleum pipelines was investigated using 17.5 deg. A.P.I. Lloydminster crude oil in a 1-inch laboratory pipe-line and a 21h-

    Jan 1, 1960

  • TMS
    The Reduction of Sulfur Dioxide by Calcium Sulfide to Produce Elemental Sulfur

    By Byung-Su Kim

    The recovery of elemental sulfur from sulfur dioxide has important implications for coal- burning power plants and nonferrous metal smelters. The thermodynamic analyses showed calcium sulfide to be su

    Jan 1, 1999

  • SME
    The Reduction Of Thiomolybdate In Aqueous Solutions

    By I. H. Warren

    The high temperature lubricant molybdenite, MoS2, is usually produced by a complex sequence of processes involving mineral dressing of molybdenite concentrates followed by leaching with hydrofluoric a

    Jan 1, 1972

  • AUSIMM
    The Reduction of Zinc Oxide

    By Hayes P. C

    The reduction of small, dense zinc oxide (ZnO) samples in CO/CO2, and CO/N2 gas mixtures has been investigated at temperatures between 900 and 1100¦C. The microstructural characterisation of the rea

    Jan 1, 1991

  • TMS
    The Reduction of Zinc Oxide in Calcium Ferrite Slags

    By E. A. van Dijk

    Dusts from steel-making processes contain substantial amounts of zinc. Such dusts are also a hazardous waste and dumping them becomes unacceptable from environmental point of view. Therefore processes

    Jan 1, 1999

  • AIME
    The Refining Of Blister-Copper.

    By HORACE H. EJIRICH

    (New York Meeting, February, 1912.) PREFATORY NOTE.-The first part of this paper was sent to me by Mr. Emrich nearly nine months ago ; and. I held it, waiting for the second part, which he had promis

    Jun 1, 1912

  • AUSIMM
    The Refurbishment of the Terrace and Mt Victoria Tunnels, Wellington, New Zealand

    By T J. McGavin

    This paper examines the fire life systems implemented in two existing tunnels and discusses whether the standards used were appropriate. It focuses on the Terrace Tunnel as this upgrade and refurbishm

    Sep 17, 2014