Search Documents

Sort by

  • SME
    The Design of Deep Rock Shafts of the Rondout-West Branch Bypass Tunnel

    By Christopher E. Dianora, Matthew Sorrell, Eileen Test

    "Constructed between 1939 and 1945, the Rondout-West Branch Tunnel (RWBT) portion of the Delaware Aqueduct is 45 miles (72 km) long. The New York City Department of Environmental Protection (NYCDEP) f

    Jan 1, 2016

  • DFI
    The Design Of Deepwater Wharves Which Are In The Complex Geological Conditions Of Pearl River Estuary

    By F. W. Liang

    The geology of pearl River estuary belongs in strong weathered rock quaternary geological systen, so the conditions are complication. Since 80's we built the first deepwater wharf of Shenzhen chi

    Jan 1, 1991

  • AUSIMM
    The Design of Draft Tube Circulators

    Draft tube circulators are now widely used instead of Pachucas for suspension of slurries in large tall tanks.Precipitators in the alumina industry are an example.Draft tube/tank diameter ratio is cri

    Jan 1, 1982

  • CIM
    The Design of Explosives

    By G. R. Phare

    Explosives formulation is dictated by desired field performance, which in turn is dependent on such physical properties as strength, velocity of detonation, sensitivity, and water resistance. The desi

    Jan 1, 1958

  • CIM
    The Design of Gold Mills: What Could Be Simpler

    By R. Nendick

    "IntroductionThe Ancient Egyptians recovered gold from the mud in the bottom of ponds by having teams of maidens sit around the pond dipping goose feathers dipped in grease into the mud. The gold woul

    Jan 1, 1986

  • CIM
    The Design of Instruction to Introduce a New Technology: A Case Study in Canadian Mineral Processing

    By H. D. Stolovitch, M. L. Lavallée

    "An engineering system used to analyze and improve the performance of industrial grinding circuits has been adapted into a training program. The systematic approach to the design of training was appli

    Jan 1, 1992

  • SME
    The Design Of Large Scale Mixer Settlers

    By J. B. Lott

    The authors' company has recently undertaken a development programme aimed at exploring the relationships between the variables of greatest importance in the design of mixer-settlers for metallur

    Jan 1, 1971

  • CIM
    The Design of Long Horizontal Belt Conveyors

    By Zoltan F. Oszter

    The design of belt conveyors is a well-known procedure and related formulae can be found in any handbook dealing with materials handling. Belting and conveying equipment manufacturer's catalogues and

    Jan 1, 1962

  • DFI
    The Design of Partial Depth Cement Deep Mixing (CDM) Foundation for an Immersed Tunnel

    By J. S. Lee, R. K. Massarsch

    "A 3.2 km long immersed road tunnel forms part of the Busan-Geoje Fixed Link in South Korea, which connects Korea's second largest city Busan, with the island of Geoje. To ensure the water tightness o

    Jan 1, 2015

  • SME
    The Design Of Slope Stability Monitoring Systems ? 1. Introduction

    By Iain Weir-Jones

    The efficient operation of an open pit mine presupposes that the slopes are maintained at an angle which closely approaches that of the ultimate stability of the slope. In order to do this in a safe m

    Jan 1, 1975

  • SME
    The Design Of Stable Highwalls And Spoil Piles In Strip Mining

    By Peter N. Calder

    There is little doubt that the stability of both highwalls and spoil piles is essential to efficient strip mining. Accurate determination of the appropriate geotechnical parameters will pay dividends

    Jan 1, 1980

  • SAIMM
    The Design Of Stable Pillars In The Bushveld Complex Mines: A Problem Solved? - Synopsis

    By D. F. Malan

    This paper gives an overview of the difficulties associated with determining the strength of hard-rock pillars. Although a number of pillar design tools are available, pillar collapses still occur. Re

    Jan 1, 2011

  • SAIMM
    The Design Of Stable Stope Spans For Shallow Mining Operations

    By A. H. Swart

    Unplanned stope panel collapses occur on most near-surface and shallow mines in South Africa. Although these incidents often occur during blasting, they pose a major threat to the safety of undergroun

    Jan 1, 2005

  • TMS
    The Design Of The Ausmelt Technology Smelter At Zhong Tiao Shan's Houma Smelter, People's Republic Of China

    By E. N. Mounsey

    The paper addresses the design of the Zhong Tiao Shan Company (ZTS) Houma Ausmelt Technology copper smelter in People's Republic of China. The smelter represents the third copper smelter deve

    Jan 1, 1999

  • SME
    The Design, Commissioning And Operation Of The Castle Valley Plant In Wellington, Ut

    By P. J. Bethell

    Background Increasingly complex geological conditions, with the presence of high ash binders in the mining horizon were encountered at the A.C. I. Dugout Mine near Price, Utah. This led to the prod

    Jan 1, 2008

  • CIM
    The Design, Commissioning and Operation of the Golden Giant Paste Backfill Plant

    By Jim Dodd, Jim Paynter

    "We would like to acknowledge the efforts of the following key people who helped to make this project a success.Ron Jung, instrumentation supervisor for the Golden Giant Mine, spent many hours reviewi

    Jan 1, 1997

  • AUSIMM
    The Design, Construction and Commissioning of No. 2 Concentrator, Mount Isa Mines Limited

    The ore treatment expansion programme at Mount Isa Mines required the erection of a new lead-zinc concentrator to be known as No. 2 Concentrator. This concentrator was designed by Western-Knapp Engine

    Jan 1, 1968

  • AUSIMM
    The Design, Construction and Operation of the Boddington Gold Mine Supergene-Basement Plant

    By Hill G

    The Boddington Gold Mine (BGM) is managed by Worsley Alumina Pty Ltd (Worsley) and is located 110 km south-east of Perth, Western Australia. The gold mine, which has operated since mid-1987, was origi

    Jan 1, 1992

  • SAIMM
    The Design, Erection and Operation of a Purlex Plant at Buffelsfontein Gold Mining Company, Ltd. (90c74aae-9506-43ad-a304-b8d5afb184c6)

    By B. G. Meyburgh

    E. H. D. Carman: The results achieved at Buffelsfontein Gold Mining Company Limited are very encouraging and it seems certain that as far as the conventional uranium recovery process is concerned solv

    Jan 10, 1970

  • CIM
    The Design, Installation and Operation of a Tower Mounted Friction Hoist at Opemiska Copper Mines (Quebec) Limited

    Why A Friction Hoist? B EFORE discussing the equipment, it would be instructive to review the factors that influenced the management of Opemiska Cop-per Mines to purchase a friction hoist rather than

    Jan 1, 1962