Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, WashingtonBy David G. Winter
The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t
Jan 1, 1990
-
Test Pile Program To Determine Axial Capacity And Pile Setup For The Biloxi Bay BridgeBy W. Robert Thompson
Hurricane Katrina caused significant damage to transportation structures on the Gulf coast in August, 2005, including the destruction of the US 90 Bridge over Biloxi Bay, Mississippi. Part of the suc
Jan 1, 2009
-
Test Production of Low Sulphur Rock Tailings at Inco's Clarabelle MillBy Glen Robertson, Jeff McLaughlin
"The Clarabelle Mill rock tailings have the potential to generate sulphuric acid through chemical and biological oxidation of sulphide minerals. Current rock tailings assay between 0.80 -1.40 %S, with
Jan 1, 1994
-
Test Report On The Machine-Mounted Continuous Respirable Dust MonitorBy F. N. Kissell
The machine-mounted continuous respirable dust monitor (MMCRDM) is a fixed-location area sampling device developed for possible use at the working face of an underground coal mine. This device, based
-
Test Results On Compressive Strength Anisotropy In Steel Fibre Reinforced ShotcreteRecently, work was carried out by the Shotcrete Working Group to study anisotropy in steel fibre reinforced shotcrete using strain-controlled, compressive strength testing methods. The shotcrete mate
Jan 1, 2001
-
Test Study about the Law of the Action of Throw Blast Under Inclined boundary ConditionsBy Wang Hong Qu
This paper observes the shape of throw explosion crater its ejecta locus of internal medium and the process of distance along with slope's angle developing. It was discovered that initial velocity is
Jan 1, 1991
-
Test Tube To 10,000-Ton Plants - Reminiscence On Experience At Ajo And InspirationBy L. D. Rickets
The principles on which an art is founded are usually few and necessarily basic in nature, but he who wishes to achieve the power to select his aides and give success to important undertakings that ma
Jan 1, 1932
-
Test Work and Design of a Gravity Circuit for Iron Road’s Central Eyre Iron ProjectBy G J. Showers, P Botman, A G. Hunt
Iron Road Limited (Iron Road) is currently evaluating the feasibility of producing 21.5 Mt/a of high-grade (>66 per cent Fe) magnetite concentrate from a 3.7 Bt resource (JORC) located at Warramboo
Jul 13, 2015
-
Test Work and Geochemical Modeling for Copper in Situ LeachingBy L. K. Sinclair
In situ leaching of copper has the potential to deliver low-cost recovery for soluble copper deposits of sufficient permeability. In order to provide key inputs for modeling of the in situ leaching pr
Jan 1, 2015
-
Test Work on High Throughput Diamond Tracer Recovery from Alluvial Recovery Tailings with a Containerised Optical Sorter Under Real Production ConditionsTest Work on High Throughput Diamond Tracer Recovery from Alluvial Recovery Tailings with a Containerised Optical Sorter Under Real Production Conditions Worldwide alluvial diamond deposits are tradi
Sep 13, 2010
-
Testes Do Circuito De Preparação De Carga Do Alto-forno 2 Da Usina Da Vallourec & Sumitomo Tubos Do Brasil (Vsb)By Aline Miranda Pessoa Passagli
No projeto da usina da Vallourec & Sumitomo Tubos do Brasil (VSB), em Jeceaba – MG está contemplado um circuito de preparação de carga para atender dois altos-fornos de 350 m³ de volume útil. Realizar
Aug 1, 2018
-
Testes Sag/ag, Em Escala Piloto E Bancada, Para Cominuição De ItabiritoBy Armando Fernandes da Veiga Rodrigues
Itabirito é um minério de fero encontrado no Brasil. As reservas futuras de Itabirito requerem moagem para atingir o grau de liberação necessário para concentração. Os circuitos convencionais de comin
Aug 1, 2018
-
Testing a Crisis Management System via the Simulation of a Bulk Emulsion Truck Fire - Learning Through CollaborationBy Rob Farnfield, Ben Williams, Ashley Haslett, Diane Cartledge
Major accidents that occur within our industry are often tragic and expensive, damaging reputation and threaten the livelihood of the business. There isn’t anything in them that can be seen as positiv
Jan 1, 2016
-
Testing Acid Generation in Cemented Paste BackfillBy B Arthur, K Sexsmith, D Hockley, S D
At the proposed Crandon Project, mill tailings would be depyritised for upland disposal. The resulting pyrite concentrate would be disposed of in the underground workings as a cement-amended paste bac
Jan 1, 2003
-
Testing and analysis of cement foam materials for coal mine seals - SME Transactions 2014By K. M. Mohamed, R. K. Zipf
The shear strength properties of generic cement foam material and cement foam/concrete interfaces were examined at three testing scales. In laboratory direct shear tests on specimens with average shea
Jan 1, 2014
-
Testing And Evaluation Of An Inflatable Temporary Ventilation Control Device (dba69593-0944-4dc5-bee1-ceacce879da5)By Michael A. Trevits
The National Institute for Occupational Safety and Health (NIOSH) in partnership with Strata Products tested the sealing capability of Ventstop®? as part of an ongoing mine fire control and suppressio
Jan 1, 2009
-
Testing And Evaluation Of Driven Plate Piles In A Full Size Test Slope: A New Method For Stabilizing Shallow Landslides ? IntroductionBy Richard Short
Shallow rainfall-induced landslides in residual and colluvial hillslopes and steep embankments are a common occurrence in many settings [1, 2, 3]. While occasionally posing a threat to property and l
Jan 1, 2007
-
Testing and Implementation of a Fatigue Monitor System for Haul Truck OperatorsBy Mark W. Bartlett
Program Objectives ??Identify and implement a tool for haul truck drivers that: -Reduces or eliminates fatigue-related injuries and fatalities -Reduces accidents and equipment damage ??Following
May 1, 2011
-
Testing and Modelling a Novel Iron Control Concept in a Two-Stage Ferric Leach/Pressure Oxidation Process for the Sepon Copper ProjectBy K. G. Baxter, D. G. Dixon
The Sepon process plant utilises an autoclave to oxidize a flotation concentrate containing pyrite, residual copper minerals, and sulphur. The concentrate is produced from the residue of a preceding a
Jan 1, 2004
-
Testing and modelling of diverse iron ore slurries for pipeline friction and pump head derateBy V Matousek, A Sellgren, R Visintainer, G McCall
A 4-component model for settling slurry pipe flow has been previously described by Wilson et al (2006) and Sellgren et al (2014) to predict pipeline friction loss (hydraulic pressure gradient) over a
Nov 8, 2021