Search Documents

Sort by

  • AIME
    Slime-Filtration

    By George J. Young

    (San Francisco meeting, October, 1911.) THE nature of slimes handled in the treatment of gold- and silver-ores has been discussed in technical literature to a considerable extent. The subject of slim

    Nov 1, 1911

  • IMPC
    Slon Magnetic Separators Applied to Beneficiate Low Grade Oxidized Iron Ores

    By D. H. Xiong

    Low grade oxidized iron ores are usually not economic to utilize. However, the development of SLon magnetic separators and other new technologies make the process cost lower and lower. In this paper,

    Jan 1, 2014

  • SAIMM
    Slope Design For The East Wall Of Mantoverde Mine, Chañaral, Chile

    By Antonio Karzulovic, Ricardo Sepulveda, Manuel Schellman

    Mantoverde Division of Empresa Minera Mantos Blancos S.A., Anglo American Chile, developed an open pit mine to exploit copper oxide ore. Mantoverde mine is located in the Province of Chañaral, Norther

    Jan 1, 2006

  • AIME
    Slope Instability at Inspiration's Mines

    By James P. Savely, Victor L. Kastner

    Inspiration Consolidated Copper Company is currently mining in four pit areas; Live Oak, Red Hill, Thornton and Joe Bush Extension, near Globe, Arizona. Small satellite orebodies lying outside the mai

    Jan 1, 1983

  • SAIMM
    Slope Management At Navachab Gold Mine, Namibia

    By Frik Badenhorst, René Roux, Peter Terbrugge

    This paper presents a case study where economics dictated an aggressive slope angle and where an appropriate slope management programme allowed successful completion of mining to 190m below surface.

    Jan 1, 2006

  • SAIMM
    Slope modification of open pit wall using a genetic algorithm?case study: southern wall of the 6th Golbini Jajarmbauxite mine - Synopsis

    By K. Goshtasbi

    In this paper a genetic algorithm is used in a heavily jointed rock mass in order to investigate the critical circular slip surface and modification of slope surface. This method was applied to the so

    Jan 1, 2008

  • SAIMM
    Slope Monitoring Strategy At PPRust Open Pit Operation

    By M. J. Little

    Potgietersrust Platinums Ltd (PPRust) is Anglo Platinum?s only open pit operation. The major slope stability concern at PPRust is rapid, small-scale brittle failure on the west wall of Sandsloot open

    Jan 1, 2006

  • SAIMM
    Slope Optimization At Escondida Norte Open Pit

    By Manuel Rapiman, Ricardo Sepulveda

    The feasibility study of Escondida Norte (ENorte), recommended a slope angle design for the Final Pit. But, according to the experience obtained with the slope adjacent to the West wall of ENorte, in

    Jan 1, 2006

  • DFI
    Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple Technologies

    By Dan Mahrt

    "In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti

    Jan 1, 2016

  • DFI
    Slope Stabilisation Of A Section Of The Thirlmere Aqueduct By The Use Of Spaced Micropiles And Permeation Grouting

    By David Preece

    The Thirlmere aqueduct was constructed over 110 years ago to provide water from the Lake District (in the north-west of England) to the city of Manchester some 60 miles (100 km) away. The aqueduct rem

    Jan 1, 2011

  • SME
    Slope Stability and Engineering Geology At The Pierina Mine

    By E. Medina, W. Callupe, R. Sharon

    Slope stability in Barrick’s Pierina Mine open pit is significantly influenced by the structural geology, the variably argillized rock mass, and locally by perched groundwater. Development of an exten

    Jan 1, 2003

  • SME
    Slope Stability At CVRD Cauê Mine Itabira ? Brazil ? Introduction

    By Jose M. S. Ramos

    This paper describes the slope stabilization procedure at Cauê Mine, Companhia Vale do Rio Doce - CVRD, Itabira, State of Minas Gerais, Brazil. Cauê Mine, is a large open pit, to produce about 41 mil

    Jan 1, 1974

  • CIM
    Slope Stability at Lac Jeannine

    By J. M. Réjean Gagnon

    "Quebec Cartier Mining Company is currently mining a low-grade iron ore deposit in northeastern Quebec. The Company is producing some 8,000,000 dry gross tons of concentrates per year, grading about 6

    Jan 1, 1968

  • SME-ICGCM
    Slope Stability at Open Cut Mining Due to Subsidence on Old Underground Mining Area

    By Andre Zingano

    An underground mine using room and pillar and retreat mining methods was developed during the 1950?s. In 2009 an open cast mine was opened in the same reserve with the objective of mining five coal se

    Jan 1, 2013

  • SAIMM
    Slope stability evaluation of Gneiss rock slopes using slope mass rating (SMR) and QSlope

    By E. Kalhan, C. Kincal

    One of the biggest problems in open pit mining is slope stability. The avoidance of slope stability problems depends on a comprehensive assessment of environmental and operational factors such as geol

    Sep 1, 2025

  • SME
    Slope Stability In Dragline Stripping Operations

    By J. L. Workman

    The stability of spoil and highwall slopes are important to successful strip mining. This paper discusses soil parameters of importance in stability analysis. The common mechanisms of spoil failure ar

    Jan 1, 1996

  • CIM
    Slope Stability in Jointed Rock

    By Peter N. Calder

    The orientation of planes of inherent weakness (joints) with reference to an excavation in rock is the critical factor determining stability. The purely frictional 'residual' strength remaining follow

    Jan 1, 1970

  • CIM
    Slope stability in the Trenton limestone of a Montreal area quarry

    By Marc C. Betournay, John E. Udd

    "In this study, the authors investigated the stabilities of slopes cut predominantly into Trenton limestone in a large quarry in the Montreal region. Analyses of the bench and pit walls indicated that

    Jan 1, 1983

  • ISEE
    Slope stability through the application of low-energy explosives technology

    By Jorge Cárdenas, Diego Gamarra

    In previous phases of the mine, a landslide resulted in several losses in production delays. The stability of slopes in a mining operation is critical for the sustainability of the operation, as they

    Jan 21, 2025

  • SME
    Slope Stabilization At ?El Cerrejon? Coal Mine, Columbia, South America

    By M. Jaramillo

    The Expanded West Pit of the 15 MTY El Cerrejon Mine will reach a maximum depth of270 m. Slope stability evaluations indicated that this depth, combined with structural complexities, would create a se

    Jan 1, 1995