Search Documents

Sort by

  • DFI
    Site Management Towards Pile Execution At Qurashiya Bridge

    By Emad W. Shublaq

    Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur

    Jan 1, 1992

  • SME
    Site Selection And Environmental Analysis Of Coal Gasification Plants

    By Sheridan A. Glen

    As the Federal government along with individual states continue to grapple with the job of refining a comprehensive energy policy, coal continually stands out as an energy source which heralds a combi

    Jan 1, 1977

  • SME
    Site Selection And Licensing Of Mined Geologic Repositories For Disposal Of High-Level Radioactive Wastes ? Introduction

    By M. Kehnemuyi

    The U.S. Department of Energy is charged, by federal law, with the responsibility for developing and implementing programs for long- term storage and terminal disposal of high- level radioactive waste

    Jan 1, 1981

  • DFI
    Site Solutions For The Pisa Tower Remediation - 1 - Introduction

    By Paolo Heiniger

    The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter

    Jan 1, 2000

  • SME
    Site Specific Blasting Model For Mine-To-Mill Optimization

    By K. M. Kim

    A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in-situ block size (F80), the post-blast fragmentation (P80) and the intact tensile

    Jan 1, 2011

  • DFI
    Site Specific Study for Foundation Design of Iswar Gupta Bridge

    By Ambarish Ghosh, Chitralekha Ghatak, Tanumaya Mitra, Tarun Sengupta, Sajib Das, Sankar Kumar Nath

    "Currently construction of important structures like bridges, flyovers and high rise buildings in and around Kolkata are in full swing. These structures have mostly pile or well foundations. The desig

    Jan 1, 2015

  • TMS
    Site Specificity Of Heavy Metal Adsorption On Goethite

    By KNona C. Liddell

    Goethite is an important naturally occurring sorbent for divalent heavy metals and has often been used as a model compound in studies of adsorption on oxide mineral surfaces. Surface complexation mode

    Jan 1, 1999

  • AUSIMM
    Site Water Balance Response to Variable Climatic Conditions

    By S Hawker, M Gibbs, A Craven

    Current climate change projections suggest both an increase in the intensity of significant rainfall events and an increase in the variability of rainfall in some regions of Australia. It is necessary

    Nov 26, 2013

  • SME
    Site-specific blasting model for mine-to-mill optimization - SME Transactions 2011

    By J. Kemeny, K. M. Kim

    A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in situ block size (F80), the post-blast fragmentation (P80) and the intact tensile

    Jan 1, 2011

  • NIOSH
    Site-Specific Investigation Of A Cobalt/Manganese Occurrence In The Million Hills Study Area, Clark County, Nevada ? Summary

    By Phillip R. Moyle

    A cobalt/manganese occurrence in Clark County, Nevada was the subject of a site-specific mineral investigation by the U.S. Bureau of Mines in 1988-90. The study site is in the northern part of the Mil

    Jan 1, 1990

  • SME
    Site-Specific Predictions Of Ground Vibrations Induced By Blasting

    By S. A. Shoop

    Vibrations from thirty-seven blasts were monitored using three seismographs. Data analysis showed that square root, cube root, and site-specific scaling predicted ground motion with equal reliability.

    Jan 1, 1983

  • IIMP
    Situación y problemas actuales de la formación de los ingenieros en Francia (6f5f2a1f-1ac4-4942-91d7-63dde79a37cf)

    By M. N. Barbier

    Según la obra del Ministerio de Educación Nacional de Francia existen 112 escuelas de ingenieros que este año formarán total alrededor de 6.000 ingenieros. Sin embargo, surgen algunos problemas en la

    May 1, 1965

  • ABM
    Situation With Coking Coals On A Global Scale. Stamp Charging Technologies As A Way To Improve The Situation

    By Rudolf Lesch

    Till date, coke has been produced mainly from coals with a content of volatile matters in the range of 20% to 28% and good coking properties. If such so-called "selfcoking" coals are availab

    Aug 17, 2017

  • SME
    SIU-Sim: A Novel Coal Preparation Plant Simulator

    Coal preparation plant simulators are used to study flowsheet alternatives and determine product quality and quantity that can be produced under various operating conditions for individual circuits. S

    Jan 1, 2008

  • AUSIMM
    Six Metre Raisboring at Z.C. Mines

    Production from a major, deep orebody requires the construction of two 6 m diameter, 1000 m deep ventilation shafts over the next three years. Further ventilation upgrades have foreshadowed an ad

    Jan 1, 1988

  • ABM
    Six Sigma Para Aumentar A Produtividade Em Equipes De Manutenção

    By André Luis Martins de Souza

    O objetivo do estudo foi medir e aumentar a produtividade das equipes de manutenção - em uma mineradora multinacional - dentro e fora das paradas de manutenção, avaliando os principais fatores que inf

    Oct 30, 2017

  • SME
    Six To Be Inducted Into National Mining Hall of Fame

    Steven F. Leer, president and chief executive officer of Arch Coal Inc. will be the master of ceremonies for the 12th Annual National Mining Hall of Fame Induction Banquet. The black-tie (optional

    Jan 1, 1999

  • AIME
    Six-Point Drill Bits Superior to Four-Point in Hard Feldspar

    By HUBERT O. De

    IN December, 1936, several drilling tests were made at the Hubert O. De Beck feldspar mine at Green Mountain, N. C., to determine the most efficient type of hammier-drill bit and drilling method for u

    Jan 1, 1937

  • IMPC
    Size and density distribution in the flotation process on hard-to-separate and high-ash fine coal

    By L. Gao, X. Gui

    Fine coal obtained from Kailuan mine served as the processing object of this study. This material was difficult to separate. A flotation rate experiment was designed to investigate the process distrib

    Jan 1, 2014

  • DFI
    Size And Loading Rate Effects Observed In Plate Load Tests On A Fill

    By Kazuyuki Matsuzawa

    A series of plate loading tests were carried out on a loam ground in order to investigate the influences of the plate size and the loading rate on the observed load-settlement relations. Two circular

    Jan 1, 2006