Search Documents

Sort by

  • AIME
    Seventy-Five Years Of Progress In Petroleum

    By Everette Lee DeGolyer

    FIFTEEN thousand barrels of oil daily, the production of the United States 75 years ago, amounted to more than 90 per cent of world supply. Russia and Romania, neither of which produced as much as one

    Jan 1, 1947

  • NIOSH
    Seventy-Two Fatalities Have Occurred at Coal and Metal/Nonmetal Mining Operations Since January 2001

    This article updates the status of fatalities occurring in both coal and metal/nonmetal mines from January through December of 2001. Based on preliminary accident reports, as of December 31, 2001, sev

    Jan 1, 2002

  • AUSIMM
    Several Approaches to Enhance the Bioleaching of Enargite

    Several Approaches to Enhance the Bioleaching of Enargite Some approaches were investigated to enhance the recovery of Cu from enargite by bioleaching with Acidithiobacillus ferrooxidans using the ga

    Sep 13, 2010

  • SME
    Several Scientific Issues on Ground Control in the Mining of Thick Coal Seams

    China has made great progress in thick coal seam mining, commonly characterized by longwall top-coal caving mining and single-pass longwall mining with a large cutting height. At present, the maximum

    Jul 28, 2020

  • SME
    Sevres-Acheres Sewage System Water Control Cavern

    By J. Launay

    In order to control and dispatch the sewage water coming from 3 tunnels toward 2 downstream sewage tunnels, a large cavern has been excavated in a suburb of PARIS. Located at a depth of 47,00 m, it ha

    Jan 1, 1989

  • NIOSH
    SF6 Tracer Gas Analysis Of Mine Ventilation Systems - Objective

    To investigate mine ventilation problems which do not lend themselves to conventional anemometer and smoke study techniques by use of SF6 (sulfur hexafluoride) tracer gas. Approach SF6 tracer ga

    Jan 1, 1982

  • DFI
    SFMOMA Expansion – Multiple Uses of Ground Improvement – A Case Study

    By Scott A. Walker, Frank L. Rollo

    "The San Francisco Museum of Modern Art (SFMOMA) in downtown metropolitan San Francisco, California, is supported on a mat foundation. Although the mat foundation of the original museum was designed t

    Jan 1, 2014

  • SME
    SFRC Segmental Lining Design for a Pressurised Tunnel

    By Sotiris Psomas, Colin M. Eddie

    "Steel Fibre Reinforced Concrete (SFRC) Segmental Tunnel Linings have successfully been used for over 20 years in the UK and have been adopted in a number of high profile projects such as High Speed 1

    Jan 1, 2016

  • IIMP
    Shaft Boring as an alternative to Conventional Mechanised Drill and Blast Shaft Sinking.

    By Jordaan Koos

    This report looks at the application of Shaft Boring (SB) as an alternative methodology to conventional mechanized Drill and Blast (D&B), Shaft Sinking. Various Continuous Mechanized Shaft Sinking con

    Sep 1, 2017

  • CIM
    Shaft Boring with Oil Weil Drilling Equipment at Lynn Lake

    By Peter A. Cain, John C. Folinsbee

    "A 4-ft.-diameter shaft has been drilled to a depth of 2,790 ft. in strong, hard, basic Precambrian rocks at Lynn Lake Manitoba. This was done on the property of Sherritt Gordon Mines Limited for the

    Jan 1, 1966

  • CIM
    Shaft collaring through deep overburden -a novel approach

    By Jack J. Ayotte, Michael R. Nadon

    "Today's demand for better and more efficient methods inspires new approaches to construction and mine development.A project at Asarco's Aquarius Mine provided a challenge that resulted in t

    Jan 1, 1987

  • AUSIMM
    Shaft construction at the Gold Fields Wallaby mine

    By J Graaf, R A. Murrell

    Gold Fields Australia is constructing two major ventilation shafts at the Wallaby gold mine in Western Australia. The new ventilation shafts are required to facilitate the long term ventilation strate

    Oct 16, 2017

  • SME
    Shaft Construction in Glacial Overburden and Karstic Limestone on the Lower Olentangy Tunnel Project - NAT2024

    By Jeremy Cawley, Horry Parker Jr., Clint Wilson

    The 5180 m EPBM drive on the Lower Olentangy Tunnel (LOT) is predominantly within glacial overburden. To connect LOT with the existing OARS deep tunnel in limestone bedrock, the upper 15 m inside diam

    Jun 23, 2024

  • SME
    Shaft Construction in Toronto Using Slurry Walls

    By Vince Luongo

    PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located just north of Toronto, Ontario, Canada will see the construction of a tunnel extending a

    Jan 1, 2007

  • SME
    Shaft Design Criteria ? Introduction

    By Kot F. Unrug

    When reading different studies discussing trends in coal mining, it appears that a substantial expansion of output by the year 2000 is predicted, even in the most pessimistic forecasts. Depletion of s

    Jan 1, 1984

  • DFI
    Shaft End Bearing Capacity In Cavernous Limestone

    By Issa S. Oweis

    Limestone is a sedimentary rock composed primarily of calcite (calcium carbonate). In the presence of an aqueous solution of carbon dioxide (carbonic acid) bicarbonate radicals (2HCO3)- are produced t

    Jan 1, 2009

  • SAIMM
    Shaft Excavation Method In Soft Soil ? Synopsis

    By F. N. F. le Roux

    This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R

    Jan 1, 2009

  • SAIMM
    Shaft Excavation Method In Soft Soil ? Synopsis (57c66dec-079b-41a9-bafc-ab363857a914)

    By F. N. F. le Roux

    This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R

    Jan 1, 2009

  • AUSIMM
    Shaft Excavation Using the Borehole Rising Method

    This paper describes the excavation of No. 1 Power Station Lift Shaft at the Kiewa Hydro-Electric Project. The advantages and limitations of the borehole method are outlined, and general principles of

    Jan 1, 1959

  • CIM
    Shaft hoisting system for Olympic Dam

    1. Scope of project In South Australia, the Western Mining Corporation operates the underground copper and uranium mine Olympic Dam. The deposits concerned are enormous (approx. 570 million tons) and

    May 1, 2003