Search Documents

Sort by

  • IOM3
    Assessment of rock mass damage from smooth wall blasting at El Soldado mine, Chile

    By A. M. Tunstall, N. Djordjevic, H. A. Villalobos

    The damage zone behind a typical smooth-wall blast in the open pit was assessed by visually examining diamond drill core to identify blast-induced cracking, mapping core rock quality designations to i

    Jun 19, 1905

  • AUSIMM
    Assessment of Rock Slope Stability Using the Rock Mass Rating (RMR) System

    The Rock Mass Rating (RMR) and Rock Mass Strength (RMS) classification systems for jointed rock masses are briefly reviewed, with particular reference to their use in slope stability studies. A correl

    Jan 1, 1992

  • SME
    Assessment of Settlement Due to EPBM Tunnelling in London, UK, on CTRL Contract 240

    By Keith Jones, Michael Francis

    Contract 240 of the Channel Tunnel Rail Link comprises construction of twin4.7 km long running tunnels through a densely populated area of East London. The tunnels were constructed by EPBM in Sands an

    Jan 1, 2005

  • CIM
    Assessment of slope deformation and deep seated instability in the Cassiar open pit

    By Eugene F. Mehr, Dennis C. Martin

    "Development of the final slope for the 340 m (1200 ft) high hanging wall at Cassiar Mine precipitated an area of deep seated instability involving an estimated 17.6 million tonnes. The deformation me

    Jan 1, 1993

  • SME
    Assessment of Sonic Waves and Tracer Gases as Non-Destructive Testing Methods to Evaluate the Condition and Integrity of In-Situ Underground Mine Seals

    By K. T. Brashear

    Since the MINER Act of 2006, the minimum static load of in-situ underground mine seals has been increased from 20-psi to either 50-psi if monitoring is conducted or 120-psi if left unmonitored. These

    Feb 23, 2014

  • SME
    Assessment of stability of flow in a modified mine ventilation network considering a presence of fire hazards

    By W. Dziurzynski

    The present article sets forward the results of field tests that made it possible to validate the mathematical model used in the VENTGRAPH ventilation engineer programmes. The case considered relates

    Jan 1, 2009

  • SME
    Assessment Of Stable And Failed Pillars In Underground Limestone Mines

    Pillars in underground limestone mines are required to support the overburden and provide a safe, stable working environment for mining personnel and equipment. Pillar stability was assessed by the Na

    Jan 1, 2008

  • IMPC
    Assessment of Stereological Equations for Mineral Processing

    By Stephen Gay, Dewetia Latti

    "When improving a plant a mineral processing engineer would like to know the mineral composition distribution. In order to assess this distribution in particles, as compared to the corresponding distr

    Jan 1, 2003

  • SME-ICGCM
    Assessment of surface fracture depth and intensity due to subsidence over the longwall panel using a sonic technique

    By A. W. Khair

    This paper presents an analysis of fracture depth and intensity due to subsidence over the longwall panel. Sonic reflection techniques were utilized to determine fracture depth, and a variation of p-w

    Jan 1, 1989

  • AUSIMM
    Assessment of the Consistency Between Different Laboratory Froth Stability Measurements

    Assessment of the Consistency Between Different Laboratory Froth Stability Measurements

    Sep 13, 2010

  • CIM
    Assessment of the Effectiveness of Mining Vehicle Seats for Multi-Axis Vibration Environments

    By Richard C. Banting

    Excessive vibration is known to have an adverse affect on soft body tissue and operators of heavy mining equipment can be exposed to vibration that exceeds levels recommended in international guidelin

    Oct 1, 2010

  • CIM
    Assessment of the efficiencies of auxiliary ventilation systems using empirical methods

    Increasing depths and mechanization of underground mines have led to the production of large amounts of gaseous and particulate contaminants. Over 100 000 lives have been lost due to methane gas and d

    Sep 1, 2001

  • CIM
    Assessment of the Efficiencies of Auxiliary Ventilation Systems Using Empirical Methods

    By Raymond S. Suglo

    Increasing depths of mining coupled with the mechanization of most underground mining operations have led to growing complexities in the mine environments with the production of large amounts of gaseo

    May 1, 2001

  • CIM
    Assessment of the European bucket-wheel excavator technology Mine Visits-May 15 to May 31, 1982

    By W. F. Giuvlore, E. Mcroberts, T. S. Golosinski

    "The rising demand for Canadian coal and depletion of shallow deposits, most suitable for surface mining, result in rapidly increasing volume of waste materials which have to be moved by the coal mini

    Jan 1, 1984

  • AUSIMM
    Assessment of the Impact of Non-Additivity in the Estimation of Iron Ore Attributes

    By A J. Cornah

    Critical decisions in iron ore project evaluation and production are based on global and local spatial estimates of primary mineral deposit properties (such as in situ geochemical grades) and geometal

    Aug 12, 2013

  • SME
    Assessment Of The Pathogenic Potential Of Asbestiform Vs. Nonasbestiform Particulates (Cleavage Fragments) In In Vitro (Cell Or Organ Culture) Models And Bioassays

    By Brooke T. Mossman

    Asbestos fibers are highly fibrous silicate fibers that are distinguished by having a large aspect (length to diameter) ratio and are crystallized in an asbestiform habit that causes them to separate

    Jan 1, 2007

  • SME
    Assessment of the Potential for Radioactive Pollution at a Phosphogypsum Waste Dump and Possibilities for Ra226 Removal

    By V. T. Vacariu, P. D. Georgescu, N. Tomus

    To assess the potential for radioactive pollution unique to the environmental conditions of the Bacau phosphogypsum waste dump, surface samples were taken, drillings were performed on the entire waste

    Jan 1, 1999

  • SAIMM
    Assessment Of The Precision And Bias Of An Online Gauge Using A Single Reference Instrument ? Synopsis

    By F. Lombard

    We consider the Grubbs estimation of the precision of an online gauge. Typically, this type of estimation involves independent results from two or more reference instruments (sampling and laboratory a

    Jan 1, 2012

  • SME
    Assessment Of The Real Economic Feasibility Of Potential Critical Raw Materials Mining Projects In The U.s.; Implementation Of A Newly Developed Computational Tool - SME Annual Meeting 2022

    By M. A. Islam, H. Mischo, G. Barakos

    Among the thirty-five declared critical raw materials (CRM) in the United States, there is no sustainable domestic production for the fourteen of them, while for some others domestic supply does not m

    Mar 2, 2022

  • ISEE
    Assessment of the Relative Efficiency of Two Stemming Materials

    By Tapan Goswami

    A column of stemming material keeps explosion gases at high pressure for longer times in a blasthole. In general, use of appropriate stemming enables the achievement of the desired level of fragmentat

    Jan 1, 2000