Search Documents

Sort by

  • AUSIMM
    Real-Time Simulation in Process Engineering - Dream or Reality?

    Computation is believed to be a powerful tool in scaling-up chemical processes and in designing materials, however, is being challenged by low predictability and limited scalability. This presentation

    Sep 13, 2010

  • CIM
    Real-Time Simulation of Earthmoving Projects Using Automated Machine Guidance

    By F. Vahdatikhaki

    Simulation techniques have offered significant boosts toward a cost-and-time-optimized planning of construction projects by enabling project managers to effectively comprehend the behavior of projects

    Aug 1, 2013

  • SME
    Real-Time Slope Monitoring Using A Dedicated Home Computer

    By M. K. McCarter

    A unique telemetry system was developed to monitor potentially unstable natural slopes above a residential area. Continuous interpretation of data transmitted from remote movement-sensitive devices an

    Jan 1, 1985

  • AUSIMM
    Real-time slurry elemental analyser for iron ore beneficiation plant control

    By E Portes, G Noble, J Roberto, A Stabile

    Iron ore beneficiation plants are facing economic pressures to treat more challenging ore types, improve efficiency and improve product quality. Better control and stability of the plant process in th

    Jul 24, 2017

  • SAIMM
    Real-time underground route identification and route progress using simple on-board sensing and processing

    By N. Theron, R. F. Meeser

    The global emphasis on conserving energy resources has led to the adoption of hybrid power systems in vehicles. Optimally applied, hybrid systems can save up to 40% on fuel costs. To optimally manage

    Jan 26, 2023

  • AUSIMM
    Realisation of Value through Identification of Various Oxidation Fronts and Mineralisation Styles at Trilogy Cu-Au-Ag-Pb-Zn Deposit

    By B Armstrong

    The Proterozoic poly-metallic Trilogy deposit was discovered in 1997, and until recently, mining evaluation was stalled due to poor metallurgical performance. Unlocking the substantial economic value

    Sep 5, 2011

  • AUSIMM
    Realising the Potential of the Boolgeeda Iron Formation – Stratigraphy and Iron Mineralisation at McCamey’s North, Hamersley Province, Western Australia

    By P J. Howard

    Atlas Iron Limited’s McCamey’s North project lies at the eastern end of the Hamersley Basin, approximately 50 km east of Newman, Western Australia, and 3 km northeast of BHP Billiton’s Jimblebar Mine.

    Jul 11, 2011

  • AUSIMM
    Realismm, A Virtual Reality in Rational Managerial Decision Making

    Rational decision making is generally perceived by managers of operations to be a delicate process of committing large sums of money and putting other people's life at risk. Consequently most man

    Jan 1, 1993

  • SME-ICGCM
    Realistic Design Of Ground Control Based On Geotechnical Data Obtained During Mine Development

    By Kot F. Unrug

    In the premining stage of engineering design, the only available data are obtained from core drilling. It is often not sufficient for a realistic design of strata control. During the development, an a

    Jan 1, 1994

  • SME
    Realistic Simulation Accelerates Safety Evaluation Of Mine Designs

    Global mining company achieves significant productivity gains with three-dimensional (3D) mine models developed with Abaqus finite element analysis software. In a steep change beyond traditional proc

    Jan 1, 2009

  • SME
    Reality Check: Passive Treatment Of Mine Drainage An Emerging Technology Or Proven Methodology?

    By J. J. Gusek

    Passive treatment of mine drainage using constructed wetlands has been employed on coal and metal mine sites since about 1985. The technology has advanced significantly since then; there are currentl

    Jan 1, 2000

  • DFI
    Realization Of An Innercity Car Park By Means Of A Complex Underpinning Measure

    By Robert Thurner

    The underground car park "Admonterhof in the historical centre of Graz is an example for the technical and economical success of a complicated structural design using a concept on the basis of the obs

    Jan 1, 2006

  • DFI
    Reanalysis Of Piles Under Static And Dynamic Lateral Loads

    The process of pile driving disturbs the soil around the pile. The nature and magnitude of disturbance depends upon 1) the pile size, and 2) the nature of soil. Therefore, the prediction of a single p

    Jan 1, 1989

  • IMPC
    Rearch of Grinding Process to Protect the Flake of Graphite Using Vertical Stirred Mill

    By Lilong Huang, Yuan Long, Li Shi, Guowang Zhang, Xiao Xiao

    "Graphite is the key raw material of new carbon materials such as graphene and spherical graphite. The size and completeness of graphite flakes directly affect the performance of new carbonaceous mate

    Jan 1, 2018

  • AUSIMM
    Reason Analysis of Impurity Containing and Technology Discussion of Quality Improvement for Low-Quality Iron Concentrate

    Reason Analysis of Impurity Containing and Technology Discussion of Quality Improvement for Low-Quality Iron Concentrate

    Sep 13, 2010

  • CIM
    Reasonable Prospect of Economical Extraction: Tools for Underground Mineral Resource Classification

    By Juan Asalgado

    The JORC and NI43-101 codes impose that mineralized material has a reasonable prospect of economical extraction to be classified as Mineral Resource. For deposits close to surface and amenable to op

    Oct 1, 2009

  • IMPC
    Reasonable Utilization of Primary Sylvinite?Production of Potassium Sulphate or Potassium Magnesium Sulphate Fertilizer

    By H. R. Zhang

    In this paper two optional production processes are presented for reasonable utilization of primary sylvinite in Qinghai province, China. The two kinds of products as chlorine-free potash fertilizers

    Jan 1, 2014

  • AUSIMM
    Reassessment of Controls on the Gold Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western Tanzania Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western Tanzania

    By M J. Nugus

    The Geita gold mines in north-western Tanzania have produced 5 Moz of gold from an estimated endowment of 15 Moz. They are generally classified as typical Archaean orogenic banded iron formations (BIF

    Aug 22, 2011

  • ABM
    Reavaliação De Circuito De Flotação Convencional De Minério De Ferro

    By Airton Antônio Silva

    A Samarco Mineração, desde o início de suas atividades em 1977 na mina de Germano, tem sido pioneira na lavra e beneficiamento de minério de ferro friável e de baixo teor (itabiritos). Atualmente, a q

    Aug 16, 2017

  • ISEE
    Rebuild of a Flash Smelting Furnace Using Explosives

    By Scott G. Giltner, Terry Millar, Ben Bringhurst

    "Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo

    Jan 1, 2016