Search Documents

Sort by

  • CIM
    Preliminary Mining and Construction Planning of the Churchill Falls Project

    By H. L. Snyder

    This paper outlines the approach to the underground construction work involved in the Churchill Falls Power Project. It is the first in a series of papers which CIM Bulletin plans to publish as the di

    Jan 1, 1968

  • IOM3
    Preliminary modelling of groundwater inflows at Gays River mine, Nova Scotia, Canada

    By R. Macleod, G. G. Bursey, T. R. C. Aston, J. E. Gale

    In 1991 the problems of water inflow at the mine were addressed by a three-phase study. A three-dimensional finite-element computer code, CFEST (Coupled Fluid, Energy and Solute Transport), was used t

    Jan 12, 1993

  • CIM
    Preliminary Models for Basalt Evolution in the La Grande Greenstone Belt

    By B. Rivard, D. Francis

    A layered Archean magma chamber is exposed at the base of the Yasinski segment of the La Grande greenstone belt. This intrusive complex lies beneath a sequence of mafic volcanics and is underlain by g

    Jan 1, 1984

  • SME
    Preliminary optimization of a single-layer cover made of desulfurized tailings: application to the Doyon Mine tailings impoundment - SME Transactions 2009

    By I. Demers, A. Blier, M. Mbonimpa, M. Benzaazoua, B. Bussière

    The Doyon Mine in Quebec, Canada, evaluates the possibility of desulfurizing its tailings to produce material to be used as cover for the acid-generating tailings disposal site. Laboratory tests showe

    Jan 1, 2009

  • AIME
    Preliminary Production Report From the Bureau of Mines

    A record $18.7 billion worth of metals, non- metals and fuels was produced in the U.S. during 1962, according to a year-end estimate from the USBM. The 1962 total value, based on preliminary statistic

    Jan 2, 1963

  • AIME
    Preliminary Program - 150th Meeting, A.I.M.E., New York City, February 13-16, 1939

    By AIME AIME

    ARRANGEMENTS for the Annual Meeting of the Institute were well advanced at the end of December as the following program will show. Heretofore this has been printed separately, but its inclusion in the

    Jan 1, 1939

  • AIME
    Preliminary Program, A.I.M.E. Annual Meeting

    By AIME AIME

    THE American Institute of Mining and Metallurgical Engineers will hold its annual meeting in New York City, Feb. 9-12. The technical sessions, excepting the Sunday afternoon and evening sessions of th

    Jan 1, 1942

  • AUSIMM
    Preliminary Proposal for Mining of the Rapahoe Block û Greymouth Coalfield

    The Greymouth Coal field is situated on the West Coast of New Zealand's South Island and has been mined for coal for more than 120 years. The area covered in this paper is within the Rapahoe Sect

    Jan 1, 1989

  • AIME
    Preliminary Report of the Committee to Study Student Relations

    By Jay A. Carpenter

    THIS preliminary report from the Committee to Study Relations Between Students and the Institute is submitted to our member- ship for consideration and discussion before the general subject comes up

    Jan 1, 1934

  • SME
    Preliminary Report On The Geology And Gold Mineralization Of The South Pass Greenstone Belt, Wind River Mountains, Wyoming ? Introduction

    By W. D. Hausel

    Archean supracrustal rocks of the South Pass greenstone belt of western Wyoming have been the State's most prolific source of gold and iron ore. Actual gold production statistics are incomplete,

    Jan 1, 1986

  • TMS
    Preliminary Research on Preparation Al-Si-Ti Alloy With Aluminum Ash as Electrolysis Materials

    By Qingsheng Liu

    A new method of recycling aluminum dross for preparation Al-Si-Ti alloy was studied in this paper. This was carried out in two processes. first the aluminum doss was pretreated by leaching and calcini

    Jan 1, 2010

  • CIM
    Preliminary Results for Investigating Time-Dependent Behaviour within the Block Cave Mining System Using Virtual Reality Scientific Visualisation

    Block caving is an underground mining method for the profitable extraction of massive, low-grade orebodies. Lately, it has become the mining method of choice, for many mining companies, because of dep

    Jan 1, 2015

  • CIM
    Preliminary results of a hydrodynamic study on a plasma-lift reactor

    By L Munholand, G. Soucy, P. Quintal

    This work presents early results from the first study to optimize the hydrodynamics of a Plasma Lift Reactor (PLR). The PLR is designed to break down organic contaminants in aqueous solutions. New exp

    Jan 1, 2005

  • SME
    Preliminary results of physical, geochemical, and sediment characteristics in the Benthic environmental Impact experiment Site (BIS) of Korea

    By Kiseong Hyeong, Young-Tak Ko, Gee Soo Kong

    "The benthic environmental impact experiment addresses environmental impacts at a specific site related to deep-sea mineral resource development. For such a purpose, since 2010 we have carried out ess

    Sep 1, 2014

  • SME
    Preliminary Rib Support Requirements for Solid Coal Ribs Using A Coal Pillar Rib Rating

    Researchers from the National Institute for Occupational Safety and Health (NIOSH) are developing a coal pillar rib rating (CPRR) technique to measure the integrity of coal ribs. The CPRR characterize

    Jan 7, 2020

  • AUSIMM
    Preliminary Safety Analysis for the Connection of a Thermal Oxidiser to a Working Coal Mine

    By D Cork, R Peet

    "Methane is a signifi cant greenhouse gas. Methane is released from coal seams during the mining process, both in surface and underground operations. This uncontrolled release is termed æfugitive emis

    Jun 1, 2012

  • SME
    Preliminary Seismic Design Considerations for a Highway Tunnel in Coronado, California

    By David Young

    This paper presents tunnel design considerations for the SR75/282 Transportation Corridor Project in Coronado, California. The project is managed by the City of Coronado in cooperation with Caltrans a

    Jan 1, 2008

  • CIM
    Preliminary Sizing and Selection of an HPGR Using Piston-Die Press Tests

    By P. Rosario

    "Current industry practice for HPGR assessment and sizing relies on conducting a series of tests using pilot-scale machines with roll diameters of 700 mm to 1000 mm. Substantial amounts of sample are

    Jan 1, 2019

  • SME
    Preliminary Structural Design For Deep Shafts In The Coeur D'Alene District, Idaho ? Introduction

    By Michael J. Beus

    This paper describes research conducted under the BuMines's Advancing Metal and Nonmetal Mining Technology Program, a major element being the application of new and improved technology to shaft d

    Jan 1, 1976

  • NIOSH
    Preliminary Study - Initial Probing

    By David A. Monaghan, Kenneth R. Maser, Adi R. Gurdar, D. Randolph Berry

    2. Preliminary Study - Initial Probing 2. 1 Introduction Initial probing of the mine passage is required prior to the emplacement of the sealant material or deployment of the seal checker system

    Jan 1, 1973