Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pre-Failure Pillar YieldingBy J. F. T. Agapito, R. R. Goodrich
Yield pillars have been used for many years to help reduce stresses near mine openings and improve roof and floor stability. A yield pillar is often defined as a pillar that fails but retains residual
Jan 1, 2001
-
Pre-finishing Mill Modernization On The Sterling Steel Rod MillBy Kermit Reins
The most recent modernization phase of the wire rod mill at Sterling Steel involved installation of a pre-finishing mill, using a Morgan Vee Mini-Block, a new water box and shear with utility systems
Aug 17, 2017
-
Pre-Formed Linings In Tunnelling PracticeBy Stephen G. Tough, Ted M. Noskiewicz
INTRODUCTION For many years, in Europe and in North America, pre-formed metallic and concrete segmental linings in tunnels have been used extensively as temporary and permanent ground support syste
Jan 1, 1974
-
Pre-Implementation Evaluation of VR as a Mine Safety Training Tool - SME Annual Meeting 2025By CASSANDRA L. HOEBBEL, Jennica L. Bellanca
High-fidelity, immersive training is known for its learning and logistical benefits. While other industries have used virtual reality (VR) for decades, the same uptake has not been seen in mining. NIO
Feb 1, 2025
-
Pre-Mining Planning For Environmental Control In Surface Coal MinesBy R. V. Ramani
Minerals, together with agricultural and forestry products, are the primary source of wealth produced in the United States. Although the production of minerals requires only a small fraction of the st
Jan 1, 1977
-
Pre-mining stresses at some hard rock mines in the Canadian Shield (2c76bca0-8dd2-4a44-bc9b-85524b3514cf)By B. Arjang
ABSTRACT: Ground stresses are one of the significant factors in the context of rockbursts and underground instability at some hard rock mines in Canada. Overcoring strain relief measurements using tri
Jan 1, 1989
-
Pre-Ore Modelling: Resource Estimation on a Minimun of Exploration Evidence.A new approach to resource estimation at the exploration stage is emerging, based on the application of simple software techniques. The techniques combine the power of interactive graphics with proven
Jan 1, 1990
-
Pre-Oxidation And Hydrogen Reduction Of Panzhihua Ilmenite ConcentrateBy Chonghe Li, Xionggang Lu, Wei Xiao, Xingli Zou, Weizhong Ding
The reduction degree and rate of the initial ilmenite concentrate and pre-oxidation samples by hydrogen were investigated by using thermogravimetric analysis system. H2-TPR was used to detected reduct
Jan 1, 2014
-
-
-
-
-
Pre-Reduction of Blast Furnace Burdens Using the S-L ProcessBy F J. Pearce
The Steel Company of Canada, utilizing the S-L process, has produced partially and highly reduced pellets for use in the blast furnace. Experimental blast furnace tests, using reduced pellet burdens,
Jan 1, 1964
-
Pre-riego de pad lixiviación, solución para acelerar aporte de onzas de finos e incrementar la extracción de oroBy Delmer Fernández, Luis Santiago
Para solucionar el problema generado, tras años de operación, por una elevación excesiva de la pila de lixiviación respecto del sistema colector, Minera La Zanja buscó incrementar la velocidad de perc
Sep 20, 2019
-
Pre-Show Report: 1979 SME-AIME Fall Meeting and ExhibitSME-AIME Fall Meeting and Exhibit
Jan 9, 1979
-
Pre-sink shaft safety analysis using wireline geophysicsBy N. Andersen
During the preliminary design phases and feasibility study of a proposed vertical shaft, a vertical diamond drill-hole is normally drilled on the site. This paper outlines how rock mass characteristic
Jan 1, 2015
-
Pre-Splitting - Wall Control for Surface Coal MinesBy Cocker A
Pre-splitting for smooth highwall formation is conducted in around 75 per cent of surface coal operations within Australia. The CMTE (Centre for Mining Technology and Equipment) in conjunction with
Jan 1, 1995
-
Pre-Splitting With The New AIRDEK TechniqueBy David G. Borg, John Bussey
The new AIRDEK (tm) technique for pre-splitting in surface coal mines produces highwall conditions that have greater safety with lower costs for explosives, labor, and drilling. Successful application
Jan 1, 1988
-
Pre-Support Measures for Shallow NATM Tunneling in Urban SettingsBy Vojtech Gall
Pre-support measures for urban tunneling have seen a substantial development in the recent past. Ground improvement techniques, pipe-arch and spiling methods now allow for non-disruptive tunneling at
Jan 1, 2008
-
Pre-Treated Seawater with Sodium Hydroxide and Carbon Dioxide to Improve Chalcopyrite Floatability with High Kaoline PresenceBy L. A. Cisternas, R. I. Jeldres, C. Cruz, P. A. Robles
"Previous studies have shown that the floatability of chalcopyrite in seawater at highly alkaline conditions is significantly affected by the presence of clays. The reason is that the species of calci
Jan 1, 2018