Search Documents

Sort by

  • SME
    Pre-Failure Pillar Yielding

    By J. F. T. Agapito, R. R. Goodrich

    Yield pillars have been used for many years to help reduce stresses near mine openings and improve roof and floor stability. A yield pillar is often defined as a pillar that fails but retains residual

    Jan 1, 2001

  • ABM
    Pre-finishing Mill Modernization On The Sterling Steel Rod Mill

    By Kermit Reins

    The most recent modernization phase of the wire rod mill at Sterling Steel involved installation of a pre-finishing mill, using a Morgan Vee Mini-Block, a new water box and shear with utility systems

    Aug 17, 2017

  • SME
    Pre-Formed Linings In Tunnelling Practice

    By Stephen G. Tough, Ted M. Noskiewicz

    INTRODUCTION For many years, in Europe and in North America, pre-formed metallic and concrete segmental linings in tunnels have been used extensively as temporary and permanent ground support syste

    Jan 1, 1974

  • SME
    Pre-Implementation Evaluation of VR as a Mine Safety Training Tool - SME Annual Meeting 2025

    By CASSANDRA L. HOEBBEL, Jennica L. Bellanca

    High-fidelity, immersive training is known for its learning and logistical benefits. While other industries have used virtual reality (VR) for decades, the same uptake has not been seen in mining. NIO

    Feb 1, 2025

  • SME
    Pre-Mining Planning For Environmental Control In Surface Coal Mines

    By R. V. Ramani

    Minerals, together with agricultural and forestry products, are the primary source of wealth produced in the United States. Although the production of minerals requires only a small fraction of the st

    Jan 1, 1977

  • SME-ICGCM
    Pre-mining stresses at some hard rock mines in the Canadian Shield (2c76bca0-8dd2-4a44-bc9b-85524b3514cf)

    By B. Arjang

    ABSTRACT: Ground stresses are one of the significant factors in the context of rockbursts and underground instability at some hard rock mines in Canada. Overcoring strain relief measurements using tri

    Jan 1, 1989

  • AUSIMM
    Pre-Ore Modelling: Resource Estimation on a Minimun of Exploration Evidence.

    A new approach to resource estimation at the exploration stage is emerging, based on the application of simple software techniques. The techniques combine the power of interactive graphics with proven

    Jan 1, 1990

  • TMS
    Pre-Oxidation And Hydrogen Reduction Of Panzhihua Ilmenite Concentrate

    By Chonghe Li, Xionggang Lu, Wei Xiao, Xingli Zou, Weizhong Ding

    The reduction degree and rate of the initial ilmenite concentrate and pre-oxidation samples by hydrogen were investigated by using thermogravimetric analysis system. H2-TPR was used to detected reduct

    Jan 1, 2014

  • DFI
  • DFI
  • DFI
  • DFI
  • CIM
    Pre-Reduction of Blast Furnace Burdens Using the S-L Process

    By F J. Pearce

    The Steel Company of Canada, utilizing the S-L process, has produced partially and highly reduced pellets for use in the blast furnace. Experimental blast furnace tests, using reduced pellet burdens,

    Jan 1, 1964

  • IIMP
    Pre-riego de pad lixiviación, solución para acelerar aporte de onzas de finos e incrementar la extracción de oro

    By Delmer Fernández, Luis Santiago

    Para solucionar el problema generado, tras años de operación, por una elevación excesiva de la pila de lixiviación respecto del sistema colector, Minera La Zanja buscó incrementar la velocidad de perc

    Sep 20, 2019

  • AIME
    Pre-Show Report: 1979 SME-AIME Fall Meeting and Exhibit

    SME-AIME Fall Meeting and Exhibit

    Jan 9, 1979

  • SAIMM
    Pre-sink shaft safety analysis using wireline geophysics

    By N. Andersen

    During the preliminary design phases and feasibility study of a proposed vertical shaft, a vertical diamond drill-hole is normally drilled on the site. This paper outlines how rock mass characteristic

    Jan 1, 2015

  • AUSIMM
    Pre-Splitting - Wall Control for Surface Coal Mines

    By Cocker A

    Pre-splitting for smooth highwall formation is conducted in around 75 per cent of surface coal operations within Australia. The CMTE (Centre for Mining Technology and Equipment) in conjunction with

    Jan 1, 1995

  • ISEE
    Pre-Splitting With The New AIRDEK Technique

    By David G. Borg, John Bussey

    The new AIRDEK (tm) technique for pre-splitting in surface coal mines produces highwall conditions that have greater safety with lower costs for explosives, labor, and drilling. Successful application

    Jan 1, 1988

  • SME
    Pre-Support Measures for Shallow NATM Tunneling in Urban Settings

    By Vojtech Gall

    Pre-support measures for urban tunneling have seen a substantial development in the recent past. Ground improvement techniques, pipe-arch and spiling methods now allow for non-disruptive tunneling at

    Jan 1, 2008

  • IMPC
    Pre-Treated Seawater with Sodium Hydroxide and Carbon Dioxide to Improve Chalcopyrite Floatability with High Kaoline Presence

    By L. A. Cisternas, R. I. Jeldres, C. Cruz, P. A. Robles

    "Previous studies have shown that the floatability of chalcopyrite in seawater at highly alkaline conditions is significantly affected by the presence of clays. The reason is that the species of calci

    Jan 1, 2018