Search Documents

Sort by

  • SAIMM
    Piloting Of The Ishigaki Fibre-Wakishimizu (Fibre Media Rapid Filtration Equipment) At Skorpion Zinc ? Summary (4cb2c708-51b2-4b55-8a1e-390793b28d6a)

    By H. F. Fuls

    The quality of Pregnant Leach Solution (PLS) at Skorpion Zinc is of utmost importance for efficient operation of the Solvent Extraction (SX) Plant. Suspended solids in the PLS forms CRUD in the settl

    Jan 1, 2008

  • METSOC
    Piloting Regenerative SO2 Scrubbing At Xstrata Nickel

    By D. G. Tisdale

    A pilot plant was installed and operated at the Xstrata Nickel Sudbury Smelter 10 demonstrate the CANSOLV SO2 Scrubbing System. A 350 m3/h slipstream (through a 10cm pipe) was drawn from two different

    Jan 1, 2009

  • SME
    Pima Expansion IV Uses Semi-Autogenous Grind (21b5e538-7d4f-4d7f-b7fc-1b71c7d93d18)

    By John H. Bassarear

    The never ending search for lower unit costs led Pima Mining Company's management to study various alternatives shortly after Expansion III was completed. It soon became apparent that a considera

    Jan 1, 1973

  • SME
    Pima, A New Face

    By George A. Komadina

    Pima Mining Company has recently completed their expansion tripling the plant capacity to 18,000 tons per day and now is in the process off expanding to 30,000 tons per day with completion scheduled f

    Jan 1, 1967

  • AIME
    PIMA: A Three-Part Story – Geology – Open Pit – Milling

    By J. F. Olk, E. D. Spaulding, R. E. Thurmond, G. A. Komadina, R. W. Hernlund, J. A. Journeay

    THE Pima pit is a 1700x1400-St oval, the long T axis parallel to the strike of the orebody. The north side of the pit is carried as a final pit slope that coincides with the footwall of the orebody. T

    Jan 4, 1958

  • AUSIMM
    PIMS ù The Road to Efficient, Cost-Effective Plant Operation

    By D Hunter

    A production information management system (PIMS) was recently implemented at Queensland NickelÆs Yabulu Refinery. Although a strong business case was developed to justify the significant investment i

    Jan 1, 2003

  • DFI
    Pin Piles For Seismic Rehabilitation Of Bridges

    Since the 1989 Loma Prieta Earthquake in the San Francisco Bay Area, the California Department of Transportation (CALTRANS) has accelerated seismic upgrading of their bridges. Many structures can be i

    Jan 1, 1993

  • DFI
    Pin Piles For Structural Underpinning - Summary

    By Seth L. Pearlman

    Pin Piles are small diameter high capacity drilled and grouted piles also called minipiles or micropiles. They are ideal for building foundations on sites with poor ground conditions, sensitive surrou

    Jan 1, 2000

  • CIM
    Pinchi Lake Mercury Reduction Plant

    By R. Bainbridge

    THE cinnabar deposits of the Consolidated Mining and Smelting Company's Pinchi Lake property, situated near Fort St. James, B.C., were discovered and reported on by a Dominion Government geologic

    Jan 1, 1945

  • DFI
    Pindersfield Hospital ? An Innovative Piled Scheme

    By James N. Mure

    The paper describes the design development and construction of bored piles at Pindersfield Hospital, Wakefield, U.K. The piles were of monopile type. Monopile is the term used to describe piles which

    Jan 1, 2008

  • CIM
    Pine Point Mines dragline application of a peak shaver on a small power system

    By T. E. Smith

    "This paper describes the application of a motor-driven flywheel unit, known as a peak shaver, to compensate for the cyclic load fluctuations of a large electric dragline installed at Pine Point Mines

    Jan 1, 1980

  • ISEE
    Pioneering with Medium Diameter Lifters

    By Luke Thornton, Jack Janssen

    An unconventional drill pattern is used in an aggregate quarry to reduce pioneering costs. The site is the Iron Mountain Quarry, Granite Falls, WA., an aggregate quarry with an annual production of in

    Jan 1, 1997

  • SME
    Pipe Conveyor And Belt: Belt Construction, Low Rolling Resistance And Dynamic Analysis

    New developments in the pipe conveyor and belt are advanced to address the growth in the capacity, length and complexity of pipe conveyor systems. Improved belt construction can offer better stability

    Jan 1, 2012

  • AUSIMM
    Pipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric Field

    Pipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric Field

    Sep 13, 2010

  • ISEE
    Pipe Fragmentation Analysis to Determine Characteristics of Improvised Explosives

    By S. Geerts, J Davidson

    The purpose of the experiment was to determine detonation characteristics of various improvised explosives. The test consisted of detonating a pipe filled with an explosive compound inside of a plywoo

    Jan 1, 2011

  • AUSIMM
    Pipe Jacking Experience in Tunnelling Through Variable Soils, Brisbane, QLD.

    By Baczynski NR, Fagan MJ

    A 3050m long section of a 1.65m internal diameter tunnel is presently under construction in the Brisbane area by means of the pipe-jacking method. The soils along the alignment had been deposited

    Jan 1, 1987

  • CIM
    Pipe Ore Processing Developments in the Thompson Mill

    By P. G. Claridge, R. A. Tenbergen

    "Pipe Open Pit ore is delivered by rail to the Thompson Mill at a rate of 34,000 tons per week. Ore is milled at a rate of 220 tons per hour.Characteristics of the serpentinised peridotite host rock a

    Jan 1, 1975

  • CIM
    Pipeline syphons for economical and simple water transfer (0f637445-7793-433d-94a6-80e764b3d98e)

    By W. J. Dick, K. G. Kress

    A pipeline syphon can be a simple and reliable alternative for water conveyance as compared to otherwise more complex pumping systems or low-level outlet conduits through earthfill dams. In a simple f

    Jan 1, 2005

  • SME
    Pipeline Tunneling by Connecting Conventional and TBM Methods under High Groundwater Pressure

    By Tsunenori Shibata, Kazunori Jimbo, Kaoru Toya, Masafumi Matsumoto, Jinya Mitsui, Toshinori Tsuji

    "The Toyama Line is under construction as a natural gas pipeline with a length of 102 km from Itoigawa City to Toyama City. A 2 km-long tunnel section of the pipeline that we are reporting here is bei

    Jan 1, 2016

  • AUSIMM
    Pipelines - The Mining Cycle Catalyst

    Both as an energy source and as a raw material, natural gas is playing an increasingly important role as a catalyst for the development, continuation and rebirth of mining projects in Australia. Pipel

    Jan 1, 1998