Search Documents

Sort by

  • SME
    Pilot Study On The Influence Of The Eccentric Speed On Cone Crusher Production And Operation

    By D. Jacobson

    There are many different machine setup parameters and variables that affect the production of cone crushers in a mineral processing plant. One of these variables is the eccentric speed at which the co

    Feb 27, 2013

  • CIM
    Pilot Test Of The Permeable Reactive Barrier For Removing Uranium From The Flooded Gunnar Pit

    By D. Kong, A. Klyashtorin, L. McGilp, I. Wilson

    This work reports on applying iron oxide coated sands media in an experimental permeable reactive barrier to remove uranium species from uranium containing water. A field experiment was conducted at t

    Jan 1, 2020

  • CIM
    Pilot Testing Of A Process Developed For Treatment Of Nicontaining Copper Concentrate After High-Grade Matte Separation Resulting In Blister Copper Production In Twozone Vaniukov Furnace

    By L. B. Tsymbulov, L. Sh. Tsemekhman, A. N. Golov

    Gipronickel Institute, JS is developing a process of continuous converting of Nicontaining copper matte and concentrates resulting in the production of blister copper and fluid NiO-containing slag in

    Jan 1, 2007

  • AUSIMM
    Pilot Tests for Heavy Metals Removal in Mine Water

    By M Vendrup, T C. Christensen, C Dube

    The adsorptive and granulate forming MetClean™ process has been used at many locations in Northern Sweden, Norway, Denmark, France, Spain, Mongolia, Japan and Australia. It has been pilot tested and u

    Sep 7, 2015

  • TMS
    Pilot Trial of Direct Modification of Molten Blast Furnace Slag and Production of High Acidity Coefficient Slag Wool Fibers

    By Jun Li, Lingling Zhang, Daqiang Cang, Guizhou Zhao

    Pilot trial of direct modification of molten blast furnace slag and production of high acidity coefficient slag wool fibers were investigated nearby a blast furnace. Molten blast furnace slag discharg

    Mar 1, 2018

  • SME
    Pilot-Plant Pressure Filtration Of Coal-Preparation-Plant Refuse Slurry

    By D. W. Hutchinson

    One of the most important problems facing the coal industry today is the disposal of refuse from the coal preparation plants in a safe, economical, and efficient manner while complying with all legal

    Jan 1, 1977

  • SME
    Pilot-Plant Solution Mining And Environmental Monitoring At The Mutooroo Copper Mine, South Australia - Introduction

    By J. H. Canterford

    To date, large-scale solution mining has received little attention in Australia, although the potential of this technique has not gone unnoticed. The possibility of long-term damage to the local envir

    Jan 1, 1981

  • SAIMM
    Pilot-Plant Solvent Extraction Of Cobalt And Nickel For Avmin?s Nkomati Project

    By A. Feather

    Avmin have developed a flowsheet for the refining of copper, nickel and cobalt from Nkomati concentrates. Cobalt is recovered from calcium-saturated solution using Cyanex® 272. Nickel is subsequently

    Jan 1, 2002

  • AUSIMM
    Pilot-Plant Testing of Ammoniacal-Cyanidation for Gold Recovery from Copper Gold-Bearing Ore

    Pilot-Plant Testing of Ammoniacal-Cyanidation for Gold Recovery from Copper Gold-Bearing Ore The results of pilot-plant tested ammoniacal-cyanidation of gold recovery from copper gold-bearing ore are

    Sep 13, 2010

  • CIM
    Pilot-Scale Evaluation for the Codelco Continuous Converting Process

    By A. Moyano

    The development of the traditional converting process performed in a PeirceSmith or Hoboken converter is limited by the investment magnitude associated to the fulfillment of the environmental regulati

    Jan 1, 2007

  • CIM
    Pilot-Scale Frother Testing at Highland Valley Copper

    By S. D. D. Welsby

    "A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over

    Jan 1, 2014

  • CIM
    Pilot-Scale Industrial Microwave-IR Sorting of Porphyry Copper Ores

    By C. Dodds, R. S. Ferrari-John, The University of Nottingham, G. Dimitrakis, J. Katrib, A. R. Batchelor

    "Sorting technologies have the potential to reduce energy use in comminution by rejecting uneconomic ore before feed material enters the mill. However, a major challenge for sorting porphyry copper or

    Jan 1, 2016

  • AUSIMM
    Pilot-Scale Kiln Processing of New Zealand Ilmenite

    By Mills R, Shannon W. T, Finch J

    As an extension to investigations into methods of upgrading the Iitania content of ilmenite concentrate from beach sands using 100 g/day, a small pilot plant treating 23 kg/ day of ilmenite was used.I

    Jan 1, 1977

  • AUSIMM
    Pilot-Scale Study of Deep Cone Thickener for Phosphatic Clay Dewatering

    Pilot-Scale Study of Deep Cone Thickener for Phosphatic Clay Dewatering

    Sep 13, 2010

  • IOM3
    Pilot-scale study of effect of mineralogy and particle size on flash smelting of nickel sulphide concentrates

    By I. R. Stevenson, J. G. Dunn, T. N. Smith, L. C. Mackey

    An experimental flash reactor has been developed to simulate the operation of an industrial flash-smelter reaction shaft. Four concentrate materials of differing mineralogical compositions were charac

    Jul 1, 1991

  • SME
    Pilot-Scale Study Of Fluorite Beneficiation Using A Cyclonic Static Microbubble Flotation Column

    By X. Zhou

    In this study, the cyclonic static microbubble flotation column (FCSMC) was investigated for fluorite beneficiation. The structure and principle of the specially designed column are described. Fluorit

    Jan 1, 2007

  • SME
    Pilot-Scale Testing Of A 50-M-High Coal Air-Lift Hydrohoist

    By P. O. Lindahl

    The U.S. Bureau of Mines initiated research to improve the safety and efficiency of transporting coal from deep underground mines using a balanced air-lift hydrohoist. A 50-m-high pilot-scale model wa

    Jan 1, 1995

  • SME
    Pilot-Scale Testing Of Novel Fine Particle Dewatering Aids

    By M. K. Eryadin, I. Yildirim, R. Asmatulu

    Novel dewatering aids were tested on various coal samples from the U.S. and Canada in laboratory and pilot-scale filtration experiments. The reagents substantially improved the dewatering kinetics and

    Jan 1, 2003

  • TMS
    Pilot-Scale Treatability Study Of The Xidagou Mixing Metallurgical Waste Water

    By Xiang Zhu

    Xidagou is the largest waste water discharge channel of the Anshan Iron and Steel Complex (AISC) with average flow rate of 8000 cubic meters per hour, which is about 75% of the total effluent of the A

    Jan 1, 1994

  • SAIMM
    Piloting Of The Ishigaki Fibre-Wakishimizu (Fibre Media Rapid Filtration Equipment) At Skorpion Zinc - Summary

    By K. Nong, H. F. Fuls

    The quality of Pregnant Leach Solution (PLS) at Skorpion Zinc is of utmost importance for efficient operation of the Solvent Extraction (SX) Plant. Suspended solids in the PLS forms CRUD in the settl

    Jan 1, 2007