Search Documents

Sort by

  • SME
    Optimizing Usage Of Installed Size Reduction Power At Minera Peñasquito

    By S. Dixon

    The Peñasquito deposit in Mexico is one of the largest grassroots precious metal discoveries developed in recent years. Goldcorp Inc. acquired the gold-silver-lead-zinc property with the acquisition o

    Jan 1, 2012

  • SAIMM
    Optimizing Value on a Copper Mine by Adopting a Geometallurgical Solution

    By A. S. Macfarlane

    This paper describes how knowledge of the orebody morphology and ore morphology can be used to optimize the planning, mining, and metallurgical output from an open pit copper mining operation, such as

    Jan 1, 2014

  • SAIMM
    Optimizing yield of metallic zinc tapped from a zinc smelter by studying factors causing zinc losses to dross - Synopsis

    By A. de Meyer

    Zincor experienced significant losses of metallic zinc to dross during the melting of zinc cathode plates. In this study five factors affecting the formation of dross are identified from literature. D

    Jan 1, 2010

  • SME
    Optimum Auxiliary Fan Location to Control Air Recirculation (Mining, Metallurgy & Exploration)

    By Ajit Godbole, Ping Chang, Ramakrishna Morla, Purushotham Tukkaraja, Shivakumar Karekal

    This paper presents the optimum auxiliary fan(s) location to control air recirculation in dead-end workings where dieselpowered vehicles operate. Investigations were conducted with various secondary f

    Oct 18, 2022

  • SME
    Optimum Chain Pillar Design at the Deepest Multi-Seam LongwallWorkings in India Mining, Metallurgy and Exploration

    By Nilabjendu Ghosh, Satyendra Kumar Singh, Gautam Banerjee, Harshit Agrawal

    High-production methods like longwall mining with hydraulic powered supports are necessary to increase underground coal production in India. Longwall mining had a mixed success record for Indian geo-m

  • SME
    Optimum Drilling And Blasting Procedures

    In some 35 years in the explosive and construction industries, we have probably seen the extremes in drilling and blasting practices. All of you know that it is difficult if not impossible, to separat

    Jan 1, 1986

  • TMS
    Optimum Effect of Factors Influencing on Sacrificial Cathodic Protection for Steel Wall

    By Saad Elias Kaskah

    "The Box-Behnken Design (BBD) is used to model the sacrificial Cathodic Protection System (SCPS) to find the factors effectiveness behaviour. For protection potential assessment the BBD receives (resi

    Jan 1, 2013

  • AUSIMM
    Optimum Equipment Management Through Life Cycle Costing

    Large mining operations need equipment that consistently performs as expected. The most effective way of ensuring this is to have a defined life cycle with an optimised maintenance strategy. The deter

    Dec 6, 2010

  • CIM
    Optimum Equipment Management through Life Cycle Costing (c0e511d8-44ab-43ca-828c-72662e49cf23)

    By Jessica Barber

    Problem ? Mining operations consistently need equipment that is available, and able to perform to its maximum potential ? The most difficult part of a Maintenance Manager?s job is often a lack of kn

    May 1, 2008

  • AIME
    Optimum Open- Pit Mine Production Scheduling

    By Thys B. Johnson

    Traditional mine planning concepts are discussed and suggestions for improvement through use of the developed model are proposed. The approach developed in this paper allows optimal planning of the co

    Jan 1, 1969

  • SME
    Optimum Operation Of The Ore Bedding, Sintering And Pelletising Plant At Redcar ? Introduction

    By David A. Campbell

    There has been a long history of ironmaking on the North East coast of England centered around the River Tees. The industry developed here because of the availability of good coking coals to the North

    Jan 1, 1982

  • CIM
    Optimum Planning for Multi-Project Earthmoving Operations

    By S. Abu-Samra

    By virtue of its complex nature, the construction industry comprises a wide spectrum of interrelated variables and factors. This multifaceted character of the construction industry puts the use of eng

    Aug 1, 2013

  • AIME
    Optimum Production Rate For High-Grade/Low Tonnage Mines

    By Ross Glanville

    INTRODUCTION The Optimum Production Rate (OPR) is one of the most important parameters in the evaluation of a mineral deposit. The OPR can also be expressed as the Optimum Mine Life (OML) in years

    Jan 1, 1985

  • SME
    Optimum Production Rate For High-Grade/Low-Tonnage Mines ? Introduction

    By Ross Glanville

    The Optimum Production Rate (OPR) is one of the most important parameters in the evaluation of a mineral deposit. The OPR cam also be expressed as the Optimum Mime Life (OML) in years since the expect

    Jan 1, 1984

  • AUSIMM
    Optimum scale of an open pit operation: discount rate and risk

    For a large scale open pit mining and concentrating operation, on a low-grade disseminated ore body, it is possible to set an approximate lower bound on economically feasible operating scales and an a

    Jan 1, 1986

  • SME
    Optimum Slopes For Future Open Pit Mines: How To Obtain Them Using A Rock Mechanics Approach ? Introduction

    By Ben L. Seegmiller

    How to obtain optimum slope angles for future open pit mines using the rock mechanics approach is the subject of this paper. In the past ten years significant developments in open pit rock mechanics h

    Jan 1, 1976

  • SME
    Optimum Sublevel Height and Drift Spacing in Sublevel Cave Mining Based on Random Medium Theory Mining, Metallurgy and Exploration

    By Fengyu Ren, Ruslan Puscasu, Kunpeng Yu, Gideon Chitombo, Liangliang Kang

    Weak rock mass and poor flow of material can cause excessive ore loss and dilution in sublevel caving. This paper proposes a method to establish design parameters for an inclined deposit within a weak

  • SME
    Optimum Sublevel Height and Drift Spacing in Sublevel Cave Mining Based on Random Medium Theory Mining, Metallurgy and Exploration (6ee2c5d0-4d40-4945-8e70-9bbd8477aa28)

    By Fengyu Ren, Ruslan Puscasu, Kunpeng Yu, Gideon Chitombo, Liangliang Kang

    Weak rock mass and poor flow of material can cause excessive ore loss and dilution in sublevel caving. This paper proposes a method to establish design parameters for an inclined deposit within a weak

  • SME
    Optimum width of longwall faces in highly gassy coal mines ? Part II

    By P. C. Thakur

    In Part I of this paper, it was established that the width of longwall faces in highly gassy mines is primarily limited by the volume of air reaching the tail-end of the face. The ventilation air reac

    Jan 1, 2009

  • SME-ICGCM
    Optimun Mining Plan for Multiple Seam Mining

    By Wen H. Su

    Multiple seam mining and its associated problems are very serious in Southern West Virginia where poor planning or lack of knowledge in seam interaction often results in complete loss of coal propert

    Jan 1, 1984