Search Documents

Sort by

  • NIOSH
    OFR-108-85 Development Of Environmentally Attractive Leachants - Volume III - Geochemical Flow Modeling

    By Robert S. Schechter

    This report describes the development and application of PHASEQ/FLOW, a geochemical flow simulator capable of describing the dynamic changes in chemical composition of an aqueous solution during flow

    Jan 1, 1985

  • NIOSH
    OFR-109-76 Design And Recommended Specifications For A Safe Methane Gas Piping System

    By David W. Tongue

    This report describes the engineering work leading to the design of an underground coal mine piping system to transport approximately 2,000,000 cubic feet per day of methane gas to the surface from de

    Jan 1, 2012

  • NIOSH
    OFR-109-77 Noise Reduction Of Conveyors Used In Underground Coal Mining Machinery

    By Geoffrey G. Huggins

    Discussions are presented of the three phases of the noise reduction program on flight-type coal conveyors. The three phases are identification of noise sources, evaluation of potential noise reductio

    Jan 1, 1976

  • NIOSH
    OFR-109-79 Coal Mine Combustion Products Identification And Analysis Procedures And Summary

    By K. L. Paciorek

    The primary objective of this final phase of Contract No. H0133004 was to provide a description of all experimental assemblies and procedures used throughout this project in such a detail as to permit

    Jan 1, 1978

  • NIOSH
    OFR-109-81 Recovery Of Metal Values Prior To Reclamation Of Mined Areas In The Southwest

    By David D. Rabb

    A report on location, sampling, assays, mineral examination, amenability leach tests, and evaluation of certain mine dumps in Mohave County, Arizona. Extractions of greater than 30 percent of the gold

    Jan 1, 1980

  • NIOSH
    OFR-109-83 Incorporation Of Fire Extinguishing Agents In High Expansion Foam

    By S. S. Gross

    A program was conducted to determine whether sufficient quantities of the flame retardant, ammonium phosphate, could be incorporated in a water-based foam solution to prevent or delay reignition (burn

    Jan 1, 1982

  • NIOSH
    OFR-109-85 Advancement Of Cab And Canopy Design And Use In Coal Mines

    By W. W. Aljoe

    The use of protective canopies can result in canopy roofing and/or serious restrictions to operator comfort and vision. To document this experience, BCR conducted a field study of cab and canopy desig

    Jan 1, 1981

  • NIOSH
    OFR-10B-86 Compact Loader/Trammer For Underground Metal And Nonmetal Mines - Operation And Maintenance Manual

    By Tom Tallone

    In the majority of metal and nonmetal mining operations, narrow vein deposits are being mined with slusher hoists. Thin; method of mucking is costly, due in part to its inherent labor intense operatio

    Jan 1, 1985

  • NIOSH
    OFR-11(1)-82 Recontouring Of Steep-Slope Abandoned Contour Mines - Volume I - Summary

    By Daniel I. Carey

    Current and potential dragline reclamation usage was evaluated for the U.S. coalfields based on data gathered and analyzed during field surveys, literature reviews and contacts with manufacturers. It

    Jan 1, 1981

  • NIOSH
    OFR-11(2)-82 Recontouring Of Steep-Slope Abandoned Contour Mines - Volume II - Appendices

    By Daniel I. Carey

    Current and potential dragline reclamation usage was evaluated for the U.S. coalfields based on data gathered and analyzed during field surveys, literature reviews and contacts with manufacturers. It

    Jan 1, 1981

  • NIOSH
    OFR-11-71 Designing And Planning Open Pit Mining Operations With Computer Simulation Solutions ? Summary

    By Y. L. Su

    Deterministic and stochastic simulation were combined to develop a computer model of an open pit mining system using bucket wheel excavators and related materials handling equipment. The model is clos

    Jan 1, 1971

  • NIOSH
    OFR-11-72 A Current Appraisal Of Underground Coal Gasification - I. Summary - A. Purpose And Scope

    The Bureau of Mines in the Department of the Interior is increasingly concerned with the safety and health of personnel engaged in coal-mining operations, particularly below ground. The Bureau is also

    Jan 1, 1971

  • NIOSH
    OFR-11-74 Process Optimization Study Of Non-Sparking Titanium Diboride Tool Materials

    By L. Kaufman

    A range of processing conditions and compositions have been evaluated in order to optimize the properties of TiB2-(Ni,Cu) composites for application as a non-sparking tool material for use in coal min

    Jan 1, 1973

  • NIOSH
    OFR-11-76 Development Of An Illumination System For Longwall Coal Mines - 1.0 Introduction

    By Gary Friedline

    As a consequence of the Coal Mine Health and Safety Act of 1969(PL91-173), the Bureau of Mines (BOM) entered into a contract with Ocean Energy Inc. (OEI) to develop, fabricate, install, and evaluate a

    Jan 1, 1975

  • NIOSH
    OFR-11-77 The Correlation Of Mine Roof Failure With The Time Elapse Before Support Installation

    By Robert M. Cox

    The objective of this study was to determine if significant relationships exist between coal mine roof stability and the time roof is left unsupported. Additional factors such as geology, opening geom

    Jan 1, 1974

  • NIOSH
    OFR-11-78 Rapid Monitoring Of Coal Refuse Embankments

    By Lawrence H. Roth

    Past failures of coal refuse embankments have resulted in more intensified efforts in inspections of coal refuse sites. Inspections, however, are mainly qualitative and time consuming. In August 1975

    Jan 1, 1977

  • NIOSH
    OFR-11-79 Exploratory Studies Of Flame And Explosion Quenching

    By R. A. Strehlow

    This is the final report for U.S. Bureau of Mines contract HO-122122, which was in effect from June 30, 1972 through January 4, 1976. The work resulted in the design and construction of a large labora

    Jan 1, 1977

  • NIOSH
    OFR-11-80 Application Of Satellite Data To Surface Mine Monitoring In Selected Counties Of South Carolina

    By James N. Bayne

    An examination and analysis of Landsat digital data in the monitoring of surface mines in selected counties of South Carolina.

    Jan 1, 1979

  • NIOSH
    OFR-11-83 Portable Trailing Cables, Splices, And Couplers Design And Installation Considerations

    By L. A. Morley

    This report summarizes the work performed on Bureau of Mines Contract J0199106, "Portable Trailing Cables, Splices, and Couplers - Design and Installation Considerations," from May 1, 1979 until Decem

    Jan 1, 1982

  • NIOSH
    OFR-11-84 Streamflow Estimation And Water Use Planning For Surface Mining In Northern Alaska ? Introduction

    The small-scale surface mining operation in northern regions is typically located in a remote, ungaged basin. With the recent increase in the economic potential of mining, the number of small operatio

    Jan 1, 1985