Search Documents

Sort by

  • NIOSH
    OFR-103(1)-75 Circuit Breaker Development And Application - USBM Contract Phase I Report - Section 1. Program Objectives And Results - 1. 1 Background

    By D. A. Paice

    Direct current electrical systems are used in most coal mines primarily to power the main haulage trains and secondarily to feed other equipment and passageway lighting. Electrical power is supplied f

    Jan 1, 2012

  • NIOSH
    OFR-103(1)-77 U.S.B.M. Pilot Hole "X", Horse Draw, Rio Blanco County, Colorado - Volume I - Section I: Geology & Geophysics

    By L. A. Readdy

    Pilot Hole "X" was drilled to test the formations through which the ventilation shaft for the proposed U.S.B.M. demonstration oil shale mine would be drilled. The geologic formations encountered in th

    Jan 1, 1977

  • NIOSH
    OFR-103(1)-79 Control Of Vibration And Blast Noise From Surface Coal Mining - Volume I

    By John F. Wiss

    A series of controlled experiments was conducted at four surface coal mines to study the effects of certain blast parameters upon the ground and air vibration. Preliminary scale-model blasts were cond

    Jan 1, 1978

  • NIOSH
    OFR-103(1)-82 Feasibility Of Water Diversion And Overburden Dewatering - Volume I: Technical Report

    By Michael L. Clar

    The U.S. Bureau of Mines contracted a study to determine the feasibility of water diversion and overburden dewatering for underground coal mines in the Appalachian Region. All relevant published liter

    Jan 1, 1981

  • NIOSH
    OFR-103(2)-75 Circuit Breaker Development And Application - USBM Contract Phase II Report - Section 1. Program Objectives And Results - 1.1 Summary

    By D. A. Paice

    Under the first phase of this contract as reported in the Phase I report it was determined that certain types of commercially available molded case breakers are capable of interrupting mine dc power s

    Jan 1, 2012

  • NIOSH
    OFR-103(2)-77 U. S. B. M. Pilot Hole "X", Horse Draw, Rio Blanco County, Colorado - Volume I - Section II: Permeability Testing

    By Adrian Brown

    Pilot Hole ?X? was drilled to test the formations through which the ventilation shaft for the proposed U.S.B.M. demonstration oil shale mine will be drilled. Five permeability tests were performed at

    Jan 1, 1977

  • NIOSH
    OFR-103(2)-79 Control Of Vibration And Blast Noise From Surface Coal Mining - Volume II

    By John F. Wiss

    A series of controlled experiments was conducted at four surface coal mines to study the effects of certain blast parameters upon the ground and air vibration. Preliminary scale-model blasts were cond

    Jan 1, 1978

  • NIOSH
    OFR-103(2)-82 Feasibility Of Water Diversion And Overburden Dewatering - Volume II: Annotated Bibliography

    By Michael L. Clar

    This volume is an annotated bibliography of published literature pertaining to the occurrence and control of surface and groundwater in underground coal mines. This literature was used to develop Volu

    Jan 1, 1981

  • NIOSH
    OFR-103(3)-79 Control Of Vibration And Blast Noise From Surface Coal Mining - Volume III

    By John F. Wiss

    A series of controlled experiments was conducted at four surface coal mines to study the effects of certain blast parameters upon the ground and air vibration. Preliminary scale-model blasts were cond

    Jan 1, 1978

  • NIOSH
    OFR-103(4)-77 U.S.B.M. Pilot Hole "X", Horse Draw, Rio Blanco County, Colorado - Volume II - Drill Hole History

    By L. A. Readdy

    Pilot Hole "X" was drilled to test the formations through which the ventilation shaft for the proposed U.S.B.M. demonstration oil shale mine will be drilled. The history of the drilling of Pilot Hole

    Jan 1, 1977

  • NIOSH
    OFR-103(4)-79 Control Of Vibration And Blast Noise From Surface Coal Mining - Executive Report

    By John F. Wiss

    A series of controlled experiments was conducted at four surface coal mines to study the effects of certain blast parameters upon the ground and air vibration. Preliminary scale-model blasts were cond

    Jan 1, 1978

  • NIOSH
    OFR-103-80 Mine Wide Test Of The WVU Monitoring Concept

    By R. S. Nutter

    The results of designing, constructing, and laboratory testing of a modular, distributed, microprocessor-based mine monitoring and control system are presented. A standard computer communications prot

    Jan 1, 1980

  • NIOSH
    OFR-103-81 Development Of Tests And Criteria To Evaluate Grounding Systems

    By Wils L. Cooley

    The report covers several aspects of mine safety ground systems, primarily for underground coal mines. The design of a combined ground fault-ground check monitoring system is presented. An analysis is

    Jan 1, 1980

  • NIOSH
    OFR-103-83 Probabilistic Modeling Of Soil Loss From Surface Mined Areas - Introduction

    By K. B. Rojiani

    Surface mining activities disturb large tracts of land resulting in the potential for greatly increased downstream sediment loads. The Surface Mining Control and Reclamation Act of 1977 places increas

    Jan 1, 1983

  • NIOSH
    OFR-103-84 Investigation Of The Interaction Between Acid Mine Water And Concentrator Wastes

    By F. E. Diebold

    The wastewater-treatment system of the Anaconda Mining Co., at its Butte, MT., operation has been physically and chemically characterize modeled on a computer and investigated with respect to alternat

    Jan 1, 1982

  • NIOSH
    OFR-104(1)-80 Selective Placement Of Coal Stripmine Overburden In Montana - I. Data Base

    By D. J. Dollhopf

    The specific objective of this three year study is to investigate the means of reestablishing non-polluted hydrologic systems in areas where surface mining directly impacts shallow ground-water resour

    Jan 1, 1977

  • NIOSH
    OFR-104(2)-80 Selective Placement Of Coal Stripmine Overburden In Montana - II. Initial Field Demonstration

    By D. J. Dollhopf

    A week-long selective overburden handling dragline op ration was conducted at a strip mine near Colstrip, Montana. The objective of the demonstration was to hvdrologically isolate a saline overburden

    Jan 1, 1977

  • NIOSH
    OFR-104(3)-80 Selective Placement Of Coal Stripmine Overburden In Montana - III. Spoil Mixing Phenomena

    By D. J. Dollhopf

    An overburden handling dragline operation was conducted at a strip mine near Colstrip, Montana. The objective of the demonstration was to determine the degree a dragline could mix overburden inhibitor

    Jan 1, 1978

  • NIOSH
    OFR-104(4)-80 Selective Placement Of Coal Strip Mine Overburden In Montana - IV. Hydrogeologic Studies

    By D. J. Dollhopf

    This research was part of an effort to investigate means of reestablishing non¬polluted hydrological systems in areas where surface mining directly impacts shallow ground-water resources. Chemically

    Jan 1, 1979

  • NIOSH
    OFR-104-76 Research And Development Contract For Detection Of Faults In Mine Haulage Systems - Phase II ? 1.0 Introduction

    By Robert R. Perron

    The U. S. Bureau of Mines is engaged in many diverse programs for improving mine safety. Of particular interest to the Bureau are new and improved means for minimizing the hazard of fire which can be

    Jan 1, 1975