Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Load In A Drilled Foundation. Where Did It Go And When Did It Get There?By Walter E. Vanderpool
Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.
Jan 1, 2004
-
Load Reduction in Systematic SupportsBy Lawrence Adler
For openings in bedded rocks, analyzed by simple beam theory, it has been shown that roof loads can be shifted from one support to another.' This transfer is effected by controlling the relative
Jan 5, 1960
-
Load State Identification Method for Wet Ball Mills Based on the MEEMD Singular Value Entropy and PNN Classification Mining, Metallurgy and ExplorationBy Xiaoyan Luo, Congcong Dai, Gaipin Cai, Xin Liu, Lu Zong
To overcome the difficulty of accurately judging the load state of a wet ball mill during the grinding process, a method of mill load identification based on the singular value entropy of the modified
-
Load Test Analysis On Augered Pressure Grouted Displacement PilesBy Wei Zheng
A pulverized coal fired power plant is being built in Osceola, Arkansas, along the Mississippi River. The subsurface soil conditions consist of a certain amount of very soft clayey silt and clay under
Jan 1, 2007
-
Load Test On A Model Pile Driven Into Sand ? SummaryBy A. Mazzucato
This paper presents the experimental results of driving and load tests on an instrumented pile driven into a test pit filled with fine homogeneous sand.
Jan 1, 2010
-
Load Testing High Capacity Drilled Shafts - SummaryBy Jorj O. Osterberg
Until ten years ago, the largest load tests on drilled shafts (bored piles) were about 3,000 tons (27MN). These tests were made with kentledge (large weights, usually concrete blocks) stacked up as a
Jan 1, 2002
-
Load Testing Of Deep Foundations Using The Osterberg Load CellBy David E. Thompson
This paper describes the full-scale field load testing of three deep foundation units using the Osterberg Load Cell. The load tests were completed on three separate projects, two in Massachusetts and
Jan 1, 1989
-
Load Testing Of Steel Sheet Piling Driven With A Vibratory HammerBy Drew Floyd
Five full-scale pile load tests were performed on pairs of PZ-22 sheet piles installed with a vibratory pile driving hammer. The sheet piling was installed in several locations in soil generally consi
Jan 1, 1989
-
Load Tests on Drilled Shafts at Goethals Bridge ReplacementBy John P. Turner, Steven S. Dapp, Dan A. Brown
"The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY is supported on over 200 drilled shaft foundations ranging in diameter from 4.5 ft
Jan 1, 2016
-
Load Transfer And Capacity Of Drilled Shafts With Full-Depth CasingBy Rolf Katzenbach
Construction of drilled shaft foundations with the use of hydraulic oscillators and rotators to install temporary casing over the full depth of the shaft is described. The equipment and techniques we
Jan 1, 2007
-
Load Transfer Curve of Piles in Sands under Uplift ForcesBy Jogeshwar P. Singh, Aser I. Abbas, Mohamed Ashour
The presented methodology predicts the pile head response (i.e. pile head load - displacement curve) and develops the load transfer (t-z) curve of piles in sandy soils under tension forces based on so
Jan 1, 2018
-
Load Transfer Distance Calibration of a Coal Panel Scale Model: a Case StudyBy Mark K. Larson
Calibration of LaModel for deep coal mines begins with adjustment of overburden stiffness for load transfer distance. This calibration determines whether mining induced stresses are concentrated in th
Jan 1, 2012
-
Load Transfer Distance Measurements at Two Mines in the Western U.S.By Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson
"Load transfer distance (LTD) is simple in concept and usually evident in underground coal mines. Many people in the mining industry recognize LTD as the distance from the panel to where the mine ribs
Jan 1, 2015
-
Load Transfer Mechanisms In Reinforcing Tendons (59e0902f-c551-42cd-8764-b6dda6eee4b4)By M. W. Fabjanczyk
Cement and resin encapsulated tendons are widely used in the stabilisation of mine roadways. One of the main factors in controlling the efficiency of the reinforcement is the ability of the tendon to
Jan 1, 1992
-
Load Transfer of Polycarbonate Blast Resistant Glazing SystemsBy Joshua Calnan, Braden Lusk, Kyle Perry
This paper presents detailed information and data regarding the load transfer characteristics of Blast Resistant Glazing Systems utilizing two different thicknesses of polycarbonate. A series of triax
Jan 1, 2014
-
Load-Deformation Based Design of Deep Mixing for Supporting MSE Walls at Kitimat LNG, BCBy Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li
"Detailed design of an extensive deep mixing (DM) scheme using the Cutter Soil Mixing (CSM) technique was completed for foundation support of mechanically stabilized earth (MSE) walls for Kitimat Liqu
Jan 1, 2015
-
Load-Haul-DumpBy Robert M. Stevens, Arnoldo Acuña
INTRODUCTION In the early 1950s, underground miners and tunnel¬ing contractors were experimenting with ways to supple¬ment or eliminate track-bound loading and hauling equipment. Diesel-powered crawl
Jan 1, 1982
-
LoadingBy Thomas Fraser, David R. Mitchell
THE primary purpose of the loading plant is to transfer the finished product from the preparation machines to the railroad car, truck, or barge in which it is to go to market. Secondary purposes of th
Jan 1, 1943
-
Loading And Transport System At SMC - OptimizationBy M. M. D. S. Vemba
Paper written on project work carried out in partial fulfilment of B.Sc. Eng (Mining Engineering) degree Engineering refers to the application of mathematics and other sciences to logically develop
Jan 1, 2004
-
Loading Characteristics Of Gold-Bromo Species Onto Activated CarbonBy R. K. Mensah-Biney, M. T. Hepworth, K. J. Reid
The loading characteristics of gold-bromide species onto activated carbon were evaluated using a batch system. The overall loading of gold onto activated carbon was rapid for the first few hours, but
Jan 1, 1994