Search Documents

Sort by

  • CIM
    Integration of Copper Concentrate Pressure Oxidation Process with Copper Heap Leaching for Improving Overall Metallurgical Performance

    During heap leaching of secondary copper sulphide ores operated at low heap temperatures and high levels of leach solution salinity, copper recovery is usually unsatisfactory, due to a slow chemical a

    Jan 1, 2014

  • SAIMM
    Integration of CSIR- and CSIRO-type of overcoring rock stress data at the Zedex Test Site, Äspö HRL, Sweden

    By F. H. Cornet, D. Ask, O. Stephansson

    We have conducted a stress analysis of overcoring stress measurements undertaken at the Zedex Test Site (ZTS) in the Äspö HRL, Sweden. Two different types of overcoring cells have been used at the sit

    Jan 1, 2003

  • TMS
    Integration of Direct Leaching of Zinc-Based Sulphidic Concentrates and the Vieille-Montagne Goetifite Process

    By Thierry De Nys

    A direct leaching process of sulphidic zinc-based concentrates in aqueous sulphuric acid solutions has been developed by the V.M. R & D Department. By a very accurate control of the oxidation potentia

    Jan 1, 1990

  • AUSIMM
    Integration of Geoblast and D&B Engineering as an engineering tool in PT. Indo Muro Kencana

    By H Utama, hi, A Suw

    PT. Indo Muro Kencana (PT.IMK) is gold and silver mine located in Central Kalimantan province, Indonesia. Mining activities in PT.IMK is conducted in Bantian pit area by applying surface mining method

    Nov 29, 2022

  • CIM
    Integration of gyratory crusher liner wear and operational performance for better crusher management

    By P. P. Rosario, D. M. Maijer

    The primary crusher is a key component in the comminution process applied in open pit mines. A collaborative research project between the University of British Columbia and Highland Valley Copper (HVC

    Jan 1, 2006

  • SAIMM
    Integration of imprecise and biased data into mineral resource estimates

    By E. Machaka, A. Cornah

    "Mineral resources are typically informed by multiple data sources of varying reliability throughout a mining project life cycle. Abundant data which are imprecise or biased or both (‘secondary data’)

    Jan 1, 2015

  • CIM
    Integration of Intelligent Models and Sensing to Prevent Hardly Predictable Hazards in Construction Sites

    By E. Quaquero

    This article reports on the current state of an ongoing research project which is aimed at implementing intelligent models for hardly predictable hazard scenarios identification in construction sites.

    Aug 1, 2013

  • DFI
    Integration of Landslide Slope Movement Data for Design of an Anchored Stabilization Wall

    By Paul J. Sabatini, Robert C. Bachus, Terence P. Holman, Panos Andonyadis

    A recent landslide comprising approximately 12 acres (4.86 hectare) and a displaced volume of more than 500,000 cy (382,000 m3) caused the shutdown of a four-lane state highway and two high-capacity f

    Jan 1, 2017

  • AUSIMM
    Integration of Mine Planning with Groundwater Modelling to Optimise Mine Closure Plans at the Marillana Creek (Yandi) Mine

    By K Rozlapa, P Waters, H Middlemis

    A major challenge for closure planning at mining operations below the water table is evaporation from final void pit lakes and concentration of salts, which can impact on downstream groundwater (and s

    Jan 1, 2006

  • ISEE
    Integration of Mine Resources in the Optimization of Shot Documentation

    By Kyle Apple

    The following is a case study of how LuckStone Corporation improved their blast monitoring and documentation program. A number of resources already at their disposal have been utilized to improve the

    Jan 1, 2001

  • AUSIMM
    Integration of Mineralogical and Geomechanical Data During Exploration in the Regolith

    The mineralogy of regolith material for which whole rock geochemistry has already been done can be used to better understand/rank the significance of geochemical anomalies. Case studies show that th

    Jan 1, 1997

  • AUSIMM
    Integration of Oil Sands Mine Planning and Waste Management Using Goal Programmin

    By E Ben-Awuah

    Mine planning is the backbone of all mining enterprises and determines the profitability or otherwise of any mining investment. Providing high quality ore and tailings containment at the right time ar

    Sep 26, 2011

  • SME
    Integration Of Operations And Underground Construction: Sound Transit University Link

    By John Sleavin

    As part of the Link Light Rail project in Seattle, WA, work was completed at the Pine Street Stub Tunnel (PSST) in early 2007 for the Central Link project. This tunnel was excavated using cut-and-cove

    Jan 1, 2010

  • SAIMM
    Integration of seismic observations from deep level gold mines with dynamic numerical modelling

    By M. W. Hildyard, M. O. Kataka

    Seismic integration schemes aim to incorporate the rock mass response provided by the historical seismic activity to improve the ability of numerical models to reproduce future response to mining. Up

    Jan 1, 2003

  • CIM
    Integration of Sensor Technologies at a Bucket Wheel Excavator for Identification of Material Type and Detection of Interface Layers

    By Martin Kesting

    The world wide growth dynamics and the continuously growing demand for energy, results in increasing energy prices. Looking from this point, the efficient exploitation of fossil fuel deposits has beco

    Oct 1, 2009

  • AUSIMM
    Integration of the Beneficiation Process into Iron Ore Resource Utilisation

    This paper describes the technical development of the Newman beneficiation plant over its 23 years of operation and how this development relates to the mine ore reserves of high-grade and low-grade or

    Jan 1, 2002

  • SAIMM
    Integration Of The Mining Plan In A Mining Automation System Using State-Of-The-Art Technology At De Beers Finsch Mine

    By D. J. Burger

    This paper will highlight the system components of a successful underground mining automation project recently launched at DeBeers Finsch Mine. It will also show that integration of short-term mine pl

    Jan 1, 2006

  • CIM
    Integration of Uncertain Real-Time Logistics Data for Reactive Scheduling Using Fuzzy Set Theory

    By K. Szczesny

    This paper considers the integration of uncertain real-time logistics data for reactive construction scheduling. In order to manage a construction project efficiently, an accurate schedule representin

    Aug 1, 2013

  • AUSIMM
    Integration of Visman and Ingamells’ works into the Theory of Sampling – a necessity to expand possibilities in sampling practices

    By F F. Pitard

    The comparison between J Visman and C O Ingamells’ works with P M Gy’s works has been the object of intense debates in the past. Such negative debates inevitably resulted in a loss of many good opport

    May 9, 2017

  • ABM
    Integração De Informações Na Automação De Fornos Industriais Combustol

    By Mario Teruo Enju

    Soluções flexíveis, com baixo custo de implantação e manutenção, de sistemas de controle de processos e informação utilizando tecnologias de ponta desenvolvidas em plataforma .Net Framework. Focadas i

    Jul 30, 2018