Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Acid Rock Drainage Prevention Using Inert Gas Mixture Technology

    By H Barrie, L Ameglio

    "Current methods for acid rock drainage (ARD) mitigation revolve around insulation of the waste from oxygen in the atmosphere with water and dry (soils and liners) covers. Both are of limited effectiv

    Jul 27, 2015

  • AUSIMM
    Telfer Project Process Plant Design

    By R Dunne, G Lane, S Ha, D Dreisinger

    The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine

    Jan 1, 2003

  • AUSIMM
    Saprolites, Structures and Slope Angles - Applying Site-Specific Geotechnical and Mining Knowledge to Achieve the Final Design

    By E C. F Hamman

    Sunrise Dam Gold Mine is a large open pit mine 730 km NE of Perth, Western Australia. Contract mining commenced in the open pit in September 1996 in lake clays and saprolites with the first fresh rock

    Jan 1, 2007

  • AUSIMM
    Resource Modelling and Mine Design at Obuasi Mine, Ghana

    By C K. Boafo, J Visser

    Obuasi Mine in Ghana, with more than 100 years of mining history, developed from a surface operation into a deep >2000 m underground gold mine. The challenge is to extract value from narrow veins l

    Jan 1, 2008

  • AUSIMM
    Design and Construction for the Widening of the M2 Norfolk Twin Tunnels

    By A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys

    The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o

    Sep 17, 2014

  • AUSIMM
    Status Quo and Future Evaluations of Global Rare Earth Mining (with Respect to Special Rare Earth Element-industry Criteria)

    By H Mischo, G Barakos, J Gutzmer

    The continuously growing demand for rare earth elements (REEs), in combination with the crisis of 2009 and the price spike of 2011, has initiated a treasure hunt for rare earth deposits all over the w

    Nov 4, 2015

  • AUSIMM
    Kopanang Mine Rail Haulage Tramming System

    With the theme of û æUnderground Ore Handling SystemÆ, Kopanang Mine completed an extensive project on a specific system with technologies for the handling of ore from a dedicated drawpoint to the sha

    Jan 1, 2005

  • AUSIMM
    Reversing the Trend in Open Pit Mining Equipment Output

    By T Trott, M Lewis, G Lumley

    The analysis of equipment trends in The AusIMMÆs revision of Monograph 19 - Australasian Mining and Metallurgical Operating Practices (AMMOP) (in prep) in the paper by Graham Lumley raised some intere

    Sep 18, 2012

  • AUSIMM
    Toe angle measurement for SAG mill control at Lihir gold mine

    By M Randall, P Ebzery, F Burns, C Aisthorpe, P Blanz

    SAG Mill process control classically maintains the SAG mill volumetric filling within a set operating range. Typically a SAG mill weight measurement, by either bearing pressure transducers or load cel

    Aug 29, 2018

  • AUSIMM
    On the Joint Multipoint Simulation of Discrete and Continuous Geometallurgical Parameters

    By K G. van den Boogaart, M Lehmann, U Mueller

    Geometallurgical parameters are descriptions of the mineralogy and microstructure of the ore determining its mineralogical and microstructural characteristics. From a conditional geostatistical simula

    Nov 24, 2014

  • AUSIMM
    Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling Environment

    By E Corpuz, J Weissman, S Winter, R Evans

    The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli

    Aug 31, 2015

  • AUSIMM
    The Biokinetic Test as a Geometallurgical Indicator for Acid Rock Drainage Potentials

    By A K. B Opitz, M Becker, J L. Broadhurst

    "One of the key drivers of geometallurgy is to define the ore characteristics and their variability to build a geometallurgical model. The inclusion of waste rock properties and their variability is j

    Jun 15, 2016

  • AUSIMM
    Beyond NPV - A Review of Valuation Methodologies and Their Applicability to Water in Mining

    By D Brereton, C J. Moran

    In this era of rising focus on the social and environmental costs and benefits of mining operations, the valuation methodologies used to assess such impacts become increasingly important. Within an in

    Jan 1, 2006

  • AUSIMM
    Geothermal gradient determination for ventilation and air conditioning modelling at Malmberget Mine

    By F K. R Klose

    Malmberget is a sublevel caving mine owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB), a Swedish state-owned iron ore mining company, in northern Sweden. The mine has an annual iron or

    Oct 12, 2022

  • AUSIMM
    Friction rock stabiliser QAQC and a process to investigate high pull test failure rates

    By R Varden

    Friction rock stabilisers, commonly termed ‘Split Sets’, friction rock bolts, or continuous friction coupled bolts are the most widely used rock bolt in the Australian underground metalliferous indust

    Mar 29, 2023

  • AUSIMM
    The irrefutable value of introducing a dynamic transport term into mill modelling

    By D K. Weatherley, A N. Mainza, I Govender, L M. Tavares, M S. Powell

    It is understood that rocks do not instantaneously transport along a grinding mill and are consequently not perfectly mixed, but this is conveniently overlooked in mill modelling. A lack of understand

    Aug 24, 2022

  • AUSIMM
    Multicomponent modelling of ore blending in grinding circuits – a new model and case study

    By J J. Hanhiniemi, M S. Powell

    A ‘Variable Blend and Rates’ model is developed for SAG mills which extends upon the JKSimMet® Variable Rates Model. Similarly, a ‘Variable Blend Residence Constrained Perfect Mixing’ Ball Mill model

    Aug 24, 2022

  • AUSIMM
    Distribution of Pb, Zn, Fe, As, Sn, Sb, Bi and Ni between oxide liquid and metal in the ‘CuO0.5’-CaO-AlO1.5 system in equilibrium with Cu metal at 1400°C

    By E Jak, G Khartcyzov, M Shevchenko

    The increasing complexity of ore resources and recycled materials in the feed of pyrometallurgical processes present a technical challenge to the metallurgical engineers working on maximising the reco

    Jun 19, 2024

  • AUSIMM
    Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill

    By D Pateman, F de Fredrick

    The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)

    Mar 15, 2021

  • AUSIMM
    Characterisation and assessment of B2O3 added LF slag

    By S Kakara, A Kamaraj, S S. Varanasi, B V. R Mandalika, M B. Shaik

    The properties of top slags play a very important role in secondary steelmaking. Fluxes should be chosen based on the ladle furnace (LF) slag requirements like viscosity, melting temperature, sulfide

    Aug 21, 2024