Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mine Wastes as Cover Materials in a Water-shedding Soil Cover in North-West Queensland

    By T Baumgartl, C Gonzales, A Soliman, M Edraki

    A soil cover isolates potentially acid-forming (PAF) mine wastes from atmospheric interaction and thereby mitigates acid mine drainage. As a cover that comprises either a single layer or a composite b

    Jul 16, 2014

  • AUSIMM
    Laboratory Testing and Stability Analysis of Paste Backfill at the Golden Giant Mine (d53b2c09-d9ab-48b2-94c6-0c6f856d783f)

    By Bawden WF, Paynter JT

    This investigation involves laboratory testing and stability analysis of paste fill at the Golden Giant Mine. Site-cast samples are tested in unconfined, confined, and consolidated-undrained triaxia

    Jan 1, 1998

  • AUSIMM
    Application of RISKGATE to Coal Mine Tailings Dams

    By M Gasparon, J Harris, T Baumgartl, D J. Williams, M Edraki, P A. Kirsch, D Rowe

    RISKGATE, an Australian Coal Association Research Program-funded (ACARP) initiative, has been designed to assist the Australian coal mining industry in improving minimum standards for safety performan

    Jul 16, 2014

  • AUSIMM
    A comparison of the performance of fully versus partially encapsulated cable bolts based on laboratory-scale testing

    By P Hagan, S Wang, D Li, B Loh

    A study was undertaken to quantify the differences in performance between a full-length encapsulated cable bolt and a partially encapsulated cable bolt. Much research has been reported on the differen

    Nov 30, 2018

  • AUSIMM
    Modelling of height of connective fractures during longwall mining

    By D Adhikary, M Khanal, B Poulsen, H Guo

    During longwall mining, the ability to reliably estimate the height of longwall mining-induced fractures is critically important in order to effectively manage mining-induced water inflows and aquifer

    Nov 30, 2018

  • AUSIMM
    Blast movement monitors or polypipe? A study into cost-effective blast movement monitoring at White Foil gold mine, Western Australia

    By M E. Watson

    Minimising dilution and ore loss is an important part of ensuring profitability of a gold mining operation. White Foil open pit gold deposit is a low-grade deposit and therefore managing ore quality i

    Sep 20, 2017

  • AUSIMM
    A Change in Graphite Depressant to Improve the Recovery of Zinc at MMG Century Mine

    By R Wynn, N Stoitis, R A. Lauten, H Liang

    At the Century mine in North West Queensland, MMG produces lead and zinc concentrates. The current production rate is close to 500 000 t of zinc per annum. Graphite is the main gangue in the orebody a

    Sep 1, 2014

  • AUSIMM
    AGL Energy, Loy Yang and GHD – a Further Case Study in Alliancing: Ten Years on

    By J Missen, P Currie, J Bohan, D Clark

    AGL is one of Australia’s leading integrated energy companies and the largest ASX listed owner, operator and developer of renewable energy and thermal generation in the country. AGL owns and operates

    Jun 22, 2016

  • AUSIMM
    Designing Flotation Cells For Optimised Flow Dynamics

    By T Niitti, J Turunen, P B, A Rinne

    In todayÆs marketplace, with high metals prices, many operations are faced with the challenge of improving recovery in the particle size ranges which are normally difficult to recover. This presentati

    Jan 1, 2006

  • AUSIMM
    The Geology and Mineralisation of the Carina Iron Deposit, Yilgarn Mineral Field,Western Australia

    By J Lea, D C. Kettlewell

    The Carina iron ore deposit lies 105 km northeast of Southern Cross, WA. The area designated the Yilgarn Iron Ore Project (YIOP) is comprised of five prospects along an east-southeast trending greenst

    Jan 1, 2009

  • AUSIMM
    The Effect of Residence Time and Aeration on Coal Recovery Within the High Intensity Zone of a Flotation Machine

    By J A. Cowburn

    The high intensity zone within the Jameson Cell is the downcomer. It is largely external and separated from the flotation tank. This, together with operation of the downcomer under vacuum, rather than

    Jan 1, 2005

  • AUSIMM
    Laboratory Experiments to Quantify the Pull-Out Strength of Single Strand Cable Bolts for Large Boreholes

    In high stress mining environments, production drill rigs are often employed for rapid drilling of boreholes for systematic cable bolting. One outcome of this drilling method is the need for larger bo

    Nov 25, 2010

  • AUSIMM
    Regulatory Perspective ù Development of Closure Plan With Adequate Financial Assurance for the Protection of Ground Water Quality at the Chino Copper Mine

    By K Myers

    Since the mid-1990s, the Chino Mine Facility (Chino) located near Silver City, New Mexico has been developing a closure plan with financial assurance to protect water quality, as required by State reg

    Jan 1, 2003

  • AUSIMM
    Defining Sustainability Criteria in Project Design - A Case Study of the Olympic Dam Expansion

    By H Bateman, I Cawrse, G Carnes, S Cawrse

    In developing mineral resources, the focus typically centres on the management of identified social and environmental impacts and compliance with regulatory requirements. However, opportunities to pro

    Jan 1, 2009

  • AUSIMM
    An Overview of Current Planning and Production Systems at McArthur River Mine

    By M Gwynne

    McArthur River Mine is located approximately 50 km south-east of the NT township of Borroloola and approximately 120 km from the Gulf of Carpentaria. The mine hosts a series of layered shallow dipping

    Jan 1, 1998

  • AUSIMM
    Financial Modelling with the Auditor in Mind

    By S G. Gemell

    "The financial model is an integral component of any project evaluation based on mineral resources, ore reserves and (at least internally) exploration targets. Given the unity of purpose for preparing

    Mar 8, 2016

  • AUSIMM
    The Implementation of Paste Fill at the Henty Gold Mine (e808b65b-096a-41b0-a461-dc39eb272114)

    By Jardine G, Woodall C

    The Henty Gold Mine, located in Western lasiuania use, uuiusatise solutions to effectively manage a mining operation in an environmentally sensitive setting and has been presented with several envir

    Jan 1, 1998

  • AUSIMM
    Total Integrated System Simulation for Master Planning of the Dalrymple Bay Coal Chain

    By B Olsson, R Norman, M Volz

    Australia has seen unprecedented demand for coal exports in the last ten years and this demand is set to expand further still according to many analysts. This rapid increase in demand has placed press

    Sep 26, 2011

  • AUSIMM
    Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case Study

    By P Crittenden

    Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant

    Jan 1, 2009

  • AUSIMM
    The Application of Rock Engineering Systems to Block Caving to Identify the Effective Parameters

    By M Mohammad Khani

    An economic block cave is dependent to the characteristics of the rock mass at stages of caving. These are cave initiation, propagation and ore flow. In this research, the rock engineering system (RES

    May 9, 2016