Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ground support in strongly foliated and faulted rocks at Woodlawn Mines, NSWThe Woodlawn base metal sulphide deposit, located 50km S of Goulbum, New South Wales, was mined as an open pit operation for 10 years from 1977, producing 8 million tonnes of ore. Underground developm
Jan 1, 1990
-
Geological Controls on the Flow of Groundwater into Underground ExcavationsBy Culshaw MG, Deaves AP, Bell FG
The accurate prediction both of the water ingress into sub-surface excavations and the nearby groundwater pressures is of fundamental importance to the control of the stability and flooding of tunne
Jan 1, 1988
-
A Computer Based Ore Reserve System-Its Achievements and PotentialThe Ore Reserve System implemented at Mount Isa for Mount Isa Mines Limited is a comprehensive' computer system designed to process assay, geological, structural and survey data for Isa and Hi
Jan 1, 1974
-
Methane-INFO - Graphical, Three-Dimensional Planning and Information System for the Simulation and Prediction of the Methane Emission of Mine DesignBy Ruschitzka C
The productivity and economic success of a German hard coal mine is attributed to the high productivity of a small number of operation points; however high rates of production are associated with in
Jan 1, 1995
-
An application of Monitoring and Numerical Modelling in Open Stope MiningBy Thomson I. R R, Friday R. G, Palmer W. T
The paper introduces the problems encountered in designing open stopes and briefly examines the factors that determine the final stope dimensions achieved after mining is completed. A case study is
Jan 1, 1981
-
A New Approach in Planning Gas Drainage PracticesBoth safety and productivity in underground gassy coal mines can be improved substantially if an appropriate gas management system is introduced. A strong direct relationship exists between the gas em
Jan 1, 1998
-
Mechanics of Rock Drilling, Cutting and Future DevelopmentsBy Aziz NI, Guo H
Most of the existing models of the mechanisms of drilling and cutting processes are oversimplified in both stress state and failure criterion. On the other hand numerical modelling techniques are a
Jan 1, 1988
-
Resource Estimation Practice at The Granites Gold Mine, Northern TerritoryThe development of the Australasian Code for Reporting of Identified Mineral Resources and Ore Reserves is a significan step towards informing the financial community and the public about the futur
Jan 1, 1990
-
Greenhouse Effects on Natural Catastrophes and InsuranceINCREASE OF CATASTROPHE FREQUENCY AND SEVERITYIn the last couple of decades the frequency of natural catastrophes has increased dramatically. This realization results from the statistical analysis of
Jan 1, 1990
-
Development in Plant Practice for the Recovery of Gold in South AfricaThe introduction of new technology into thegold-mining industry has been encouraged in recent years by increases in the price of gold andthe necessity for costs to be contained.At most new gold mines,
Jan 1, 1984
-
57 Fe M÷ssbauer Effect Spectroscopy Monitoring of Iron-Bearing Products from Beach Sand Minerals ProcessingBy D Mukendi-Ngalula, G Hearn
Beach sand minerals from the volcanic rock structures of the Drakensberg, Kwazulu-Natal, (South Africa) have been processed. Screening, flotation, spiral concentration and magnetic separation methods
Jan 1, 2000
-
Relationship of Joint Orientation with Hole Spacing Parameter in Multihole BlastingBy Badal R
Rock Discontinuities ("joints") affect blasting results. An investigation was carried out to understand if blast parameter such as spacing needs to be altered with the change in joint direction. Sma
Jan 1, 1990
-
The New Central Crushing Plant at Lake View and star LimitedTo follow the development of the central crushing plant it is necessary briefly to outline the history of the Lake View and Star Limited. This Company, when first constituted, took over the properties
Jan 1, 1948
-
Heap Leach Development of the Mt. Leyshon Gold, Silver DepositThe Mt Leyshon Volcanic Complex lies 24 kilometres south-west of Charters Towers and is part of a major continental volcano-plutonic province of Permo-Carboniferous age in north-east Queensland.The vo
Jan 1, 1986
-
A Study of Electrokinetic Properties of Activated Carbon in Relation to Gold AdsorptionBy Ofori-Ansah K
The zeta potential on the surface of activated orit carbon were estimated in lhe presence of selected cations and anions that are normally associated with gold bearing ores in Kalgoorlie area of Weste
Jan 1, 1984
-
Dartbrook Mine- Greenfield Opportunities in the Upper Hunter ValleyDartbrook mine is a new greenfields thermal coal longwall mine located n the Upper Hunter Valley ten kilometres north of Muswellbrook Figure 1). Construction began in April 1993 with coal extraction
Jan 1, 1995
-
Gold Research at the A J Parker Cooperative Research Centre for Hydrometallurgy -- The First Five YearsBy Ritchie IM
The Parker Centre was formally established by the Australian Government's Co-operative Research Centre (CRC) Program in 1992 and is one of over 60 such centres encompassing a wide-range of applie
Jan 1, 1997
-
Methane Gas Emission and Recirculation in the Use of Scrubbers for Dust Control in Development Headings and Longwall OperationsBy Liu Y
Mathematical modelling of scrubbers in development and longwall operations in underground mines produces useful results. Mathematical modelling on the mounting of scrubbers on longwall supports shows
Jan 1, 1995
-
Slot Stopping At Bold Head Mine, King Island ScheeliteBy Snowden C. T
B Lens Main is a scheelite orebody with an average dip of approximately 15¦ and thickness ranging from 1.5 to 6.0 m. The orebody is overlain by a banded section of ore and waste which tends to slab
Jan 1, 1977
-
Large Scale Development of Submerged Lancing Sirosmelt Tin Process at Associated Tin SmeltersBy Jones KW, McClelland RA, Denholm WT, Taylor RN, OÆShea J
Associated Tin Smelters, Sydney, are developing tin smelting operations in a prototype commercial SIROSMELT plant comprising two furnaces of 5 to 8 tonnes capacity. Features of the plant and its
Jan 1, 1984