Search Documents

  • SME-ICGCM
    Advanced Prediction Methods for Roadway Behaviour by Combining Numerical Simulation, Physical Modelling and In-Situ Monitoring

    By Andreas Hucke

    For the roadway design in the German hard coal mining industry, an advanced combined planning system has been applied during the past 20 years. The German mining industry is working with single entry

    Jan 1, 2006

  • ISEE
    Analysis and Design of Blastwalls to Protect Public Structures From Malevolent Explosions

    By Dale Preece, Steven Sobolik, Richard Jensen

    Recent events demonstrate that civil and government facilities and structures face an ever-increasing need to be designed for protection against malevolent explosions. Modification of existing public

    Jan 1, 2000

  • NIOSH
    Evaluation Of Deep-Seated Crib Block Fire Tests

    By M. A. Trevits, J. E. Urosek, A. C. Smith, M. P. Valoski

    The National Institute for Occupational Safety and Health (NIOSH), in partnership with the Mine Safety and Health Administration (MSHA), is conducting research to test, evaluate, improve or modify coa

  • AIME
    Minerals Beneficiation - Correlation of Product Size, Capacity and Power in Tumbling Mills

    By U. N. Bhrany, N. Arbiter

    Over the last one hundred years the problem of assessing the efficiency of energy consumption in producing rock breakage has been studied by many investigators from a variety of viewpoints. Their cont

    Jan 1, 1961

  • AUSIMM
    Gold Placer Exploration Models: Inferences from Placers in the Waitaki River Catchment, South Island, New Zealand

    By J Youngson

    Gold placers can be difficult to locate in areas where tectonic activity and paleogeography have changed significantly since placer formation. Existing placer exploration models are useful in areas th

    Jan 1, 1999

  • AIME
  • CIM
    Methods of Breaking and Handling Ore at East Geduld

    By A. S. Knight

    THE breaking and handling of ore is obviously the most important consideration when the layout of a new mine is contemplated. The problem must be attacked with due regard to the claim area of the prop

    Jan 1, 1942

  • NIOSH
    IC 8127 Escapeways And Other Emergency Measures In Coal Mines ? Introduction

    By R. W. Stahl

    An emergency is defined as an unforeseen combination of circumstances that calls for immediate action. When applied to a coal mine, an emergency may call for prompt removal of the men to the surface t

    Jan 1, 1962

  • SME
    Design/Build of Tunnel and Shaft at Blue Ridge Dam LLO

    By Carl Johnson, D. R. Todd

    The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie

    Jan 1, 2005

  • SME
    Technical Note - Increased value of refined high sulfur coal

    By P. R. Dugan

    Sulfur removal from high sulfur coal has several objectives including: a) reduction of the atmospheric load that contributes to the problem of acid precipitation; b) reduction of ash, which contribute

    Jan 8, 1987

  • AUSIMM
    Beyond Rock Mass Characterisation – the Impact of Geology on Block Cave Mining

    By A Webster, T Murphy

    Block cave mining, in its broadest sense, has transitioned from an orebody/rock mass determined method of extraction, to a low-cost and high production mining method that may be applied to any large o

    May 9, 2016

  • AUSIMM
    The Electrolytic Refining and Smelting Company of Australia Limited

    Power Plant. The power for the metallurgical operations is supplied by the company's own power plant, which is centrally situated. Power is also supplied to Metal Manufactures Ltd. and Australian

    Jan 1, 1938

  • NIOSH
    OFR-104-82 Exploratory Studies Of Flame And Explosion Quenching - Volume 1 - Summary

    By L. Douglas Smoot

    This research program was a theoretical and experimental study to improve understanding of the mechanisms of flame extinguishment in methane-coal dust-air-suppressant mixtures. This final report is a

    Jan 1, 1978

  • IOM3
    Characterization of strength of Australian iron ores by tumble-drum and drop tests

    By R. D. Dukimo, M. V. Sevian

    The nature of fracture and factors that control the extent of fracture in the tumble-drum and drop-tower tests have been identified. The product-size distribution, on which the standard strength indic

    Jun 19, 1905

  • AUSIMM
    Applying Modern Heuristics to Maximising Net Present Value through Cut-off Grade Optimisation

    By C A. Myburgh, S Craig, K Deb

    In focusing on open pit mine scheduling, one of the biggest areas that a mining engineer can add value is in the area of cut-off grade optimisation. It is not atypical to add up to an extra 20 per cen

    Nov 24, 2014

  • NIOSH
    IC 6419 Mine Explosion, Mines Fies, and Miscellaneous Accidents in the US During the Fiscal Year ended June 30 1930

    By D. Harrington, C. W. Owings

    The mining industry is gradually realizing that safety education and safety inspection are economic factors that may not be overlooked as a means of reducing operating costs . Many mine operators , ho

    Jan 1, 1931

  • AUSIMM
    The Direct and Indirect Effects of the Reagent Suite on Froth Stability in Laboratory Scale Batch Flotation Tests

    The Direct and Indirect Effects of the Reagent Suite on Froth Stability in Laboratory Scale Batch Flotation Tests

    Sep 13, 2010

  • AIME
    The Gold-Fields Of French Guiana, And The New Method Of Dredging.

    By ALBERT F. J. BOARDEAUX

    (Canal Zone Meeting, November. 191(j.) I. GENERAL INTRODUCTION. 1. Historical. ALLUVIAL gold was first discovered in Guiana in 1852, in the sands of the Arataye river; by Paulino, a Brazilian convi

    Nov 1, 1910

  • SME
    Industrial Evolution From Micro to Macro Engineering

    By Richard R. Klimpel

    During the last 28 years, I have had the very challenging and rewarding experience of working as an engineering professional in a large multinational company, both as a manager of engineers and engine

    Jan 1, 1993

  • CIM
    Quality Control of Assay Data: A Review of Procedures for Measuring and Monitoring Precision and Accuracy

    By M. Abzalov

    "Control of analytical data quality is usually referred to in the mining industry as Quality Assurance and Quality Control (QAQC), and involves the monitoring of sample quality and quantification of a

    Jan 1, 2008